How much does home addition cost in Anaheim? The usual addition job filed with Anaheim is $50,000, from 126 priced permits (October 2023 through September 2026). A filed value is what the contractor wrote on the permit, not a quote or the final bill.
The usual addition job filed with Anaheim is $50,000, from 126 priced permits, October 2023 through September 2026. Half of jobs were filed for less, half for more. A filed value is what the contractor wrote on the permit, not a quote or the final bill. An addition permit here usually takes 303 days from issue to final inspection. How long permits take →
Approximately, from each firm's own spread: every firm's range of filed values, weighted by its 126 priced permits across 108 firms, pooled into one. Half of Anaheim addition permits were filed between $28,800 and $97,700.
| Percentile | Filed value | Reads as |
|---|---|---|
| 10th | $10,000 | 1 in 10 permits filed below |
| 25th | $28,800 | 1 in 4 filed below |
| 50th | $49,900 | the middle permit |
| 75th | $97,700 | 1 in 4 filed above |
| 90th | $157,000 | 1 in 10 filed above |
Top 10 by permits in the last 12 months. Usual is each firm's middle filed value; middle half is the range its middle half of jobs were filed in; both are shown for firms with 5 or more priced permits. Busy is not the same as careful: pick what you value to build a list.
| Firm | Permits | Last 12 mo | Usual | Middle half |
|---|---|---|---|---|
| The Loftcrafters Inc | 8 | 5 | $54,500 | $39,500–$73,250 |
| FG Real Estate Development LLC | 4 | 3 | — | — |
| DV Construction Inc | 3 | 2 | — | — |
| THP Construction Inc | 2 | 2 | — | — |
| Nghia Van Victor | 2 | 2 | — | — |
| HDP Construction | 2 | 2 | — | — |
| Elevate Builders | 2 | 1 | — | — |
| Fred Newman | 2 | 1 | — | — |
| Vision ADU LLC | 2 | 1 | — | — |
| Cooling Bear HVAC Inc | 1 | 1 | — | — |
Line your quote up against the file. In Anaheim, 1 in 10 addition filed values sit under $10,000, the middle half between $28,800 and $97,700, and 1 in 10 over $157,000.
Anaheim files the fewest addition permits in November (68 against an average month of 100) and the most in August (153). If you can choose, ask for quotes in a quiet month. We have no prices by month, so this is about crews' schedules, not a discount. When each trade is busiest in Anaheim →
Source: City of Anaheim Accela building permits on single-family homes and ADUs. The window is October 2023 through September 2026; a permit filed after that isn't here yet.
Usual is the middle permit: half were filed for less, half for more. Only permits with a filed value count; a value of $0 or none is left out.
The spread is approximate: we keep seven points of each firm's own range of filed values, not every permit, and pool them.
Nobody paid to be on this page and nobody can. How the records work in Anaheim →
Addition cost in other cities: Orlando Cincinnati Miami Minneapolis Denver San Diego Honolulu Albuquerque Boulder Greensboro Saint Paul Arlington, VA Scottsdale Somerville Cary Naperville Bellevue Cape Coral Bellingham Bend San Francisco Columbus, OH Marin County (unincorporated)
Other job costs in Anaheim: Roofing · Solar & Battery · Remodel & Repair · Windows & Doors · ADU · Pool, Spa & Pool Removal · Patio Cover