Data through September 2026 · updated 20 Oct 2026

467 garage, shed and shade structure permits were issued in Nashua, October 2024 through September 2026: about 234 a year and 5% of all permits. 236 garage, shed and shade structure permits in the last 12 months (Oct 2025–Sep 2026), 2% more than the 231 in the 12 months before. The busiest month is September.

467permits issued
236last 12 months
Sepbusiest month
Sep 2026records through

Garage, shed and shade structure permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 29Oct2024Nov 2024: 12Dec 2024: 3Jan 2025: 4Jan2025Feb 2025: 0Mar 2025: 14Apr 2025: 15May 2025: 8Jun 2025: 31Jul 2025: 42JulAug 2025: 39Sep 2025: 34Oct 2025: 16Nov 2025: 22Dec 2025: 5Jan 2026: 3Jan2026Feb 2026: 3Mar 2026: 8Apr 2026: 28May 2026: 31Jun 2026: 34Jul 2026: 26JulAug 2026: 25Sep 2026: 35
The same numbers as a table
MonthPermits
Oct 202429
Nov 202412
Dec 20243
Jan 20254
Feb 20250
Mar 202514
Apr 202515
May 20258
Jun 202531
Jul 202542
Aug 202539
Sep 202534
Oct 202516
Nov 202522
Dec 20255
Jan 20263
Feb 20263
Mar 20268
Apr 202628
May 202631
Jun 202634
Jul 202626
Aug 202625
Sep 202635

Download this table (CSV)

When garage, shed and shade structure permits are filed

By calendar month, 100 = an average month (the thin line). September is the busiest (177), February the quietest (8). A busy month at the permit counter usually means a longer wait for a contractor.

January: 18 (100 = an average month)February: 8 (100 = an average month)March: 57 (100 = an average month)April: 110 (100 = an average month)May: 100 (100 = an average month)June: 167 (100 = an average month)July: 175 (100 = an average month)August: 164 (100 = an average month)September: 177 (100 = an average month)177October: 116 (100 = an average month)November: 87 (100 = an average month)December: 21 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January18
February8
March57
April110
May100
June167
July175
August164
September177
October116
November87
December21

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Sheds (Under 200 sqft)16836%
Residential Deck - New11424%
Residential Deck - Replace Sam10923%
Residential Garage296%
Residential Porch - New255%
Residential Shed - New102%
Residential Porch - Replace Sa51%
Residential Carport4under 1%
Residential Gazebo2under 1%
Residential Shed - Replacement1under 1%

Download this table (CSV)

How these numbers are made

Source: City of Nashua GIS, Building_Permits_for_AGOL map service (NashIMS building permits, last three years) and the Building_Permits_June_2025 snapshot layer, read 20 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out. The file carries no usable permit status, so it can't say which permits were finished, so no finished share is shown.

Building, electrical, plumbing and mechanical permits the City of Nashua Building Safety Department issues inside the city. The city publishes only the last three years of permits as map layers; older permits are not public in bulk.

  • The city's permit layers name no contractor, so there are no contractor lists, rankings or firm pages for Nashua.
  • The layers have no job value, no final inspection date, no status beyond issued and no ZIP code, so we show no costs, no time to final, no finished share and no ZIP pages.
  • The city's type of work is cut to 30 characters in the file; trade permits (mechanical, electrical, plumbing only) are counted for homes and businesses alike.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Garage, shed and shade structure permits in Nashua, NH", https://contractorrecords.com/nashua/accessory-permits, data through September 2026, from City of Nashua Building Safety Department building-permit records.

Link to a table: By month · Season · Permit types.

Download the tables (CSV): Garages, sheds & shade structures permits by month · Garages, sheds & shade structures permits by calendar month (index) · Garages, sheds & shade structures permits by permit type.

Common questions

  • How many garage, shed and shade structure permits does Nashua issue a year?About 234 a year in Nashua: 467 permits issued October 2024 through September 2026, 236 of them in the last 12 months.
  • When do people in Nashua file the most garage, shed and shade structure permits?September (177 against an average month of 100); February is the quietest (8). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.