Contractor Records
Home › Norfolk › Additions

Home addition permits in Norfolk, VA

Data through September 2026 · updated 19 Oct 2026

282 home addition permits were issued in Norfolk, October 2024 through September 2026: about 141 a year and 2% of all permits. 129 home addition permits in the last 12 months (Oct 2025–Sep 2026), 16% fewer than the 153 in the 12 months before. The busiest month is June. The usual one took 164 days from issue to the city's final. 23503 has the most, 54.

282permits issued
129last 12 months
Junbusiest month
164days, usual issue to final
67%finished
$30,000usual declared value
Sep 2026records through

Home addition permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 19Oct2024Nov 2024: 7Dec 2024: 12Jan 2025: 9Jan2025Feb 2025: 14Mar 2025: 15Apr 2025: 16May 2025: 13Jun 2025: 21Jul 2025: 5JulAug 2025: 9Sep 2025: 13Oct 2025: 10Nov 2025: 9Dec 2025: 9Jan 2026: 11Jan2026Feb 2026: 12Mar 2026: 10Apr 2026: 16May 2026: 13Jun 2026: 12Jul 2026: 14JulAug 2026: 7Sep 2026: 6
The same numbers as a table
MonthPermits
Oct 202419
Nov 20247
Dec 202412
Jan 20259
Feb 202514
Mar 202515
Apr 202516
May 202513
Jun 202521
Jul 20255
Aug 20259
Sep 202513
Oct 202510
Nov 20259
Dec 20259
Jan 202611
Feb 202612
Mar 202610
Apr 202616
May 202613
Jun 202612
Jul 202614
Aug 20267
Sep 20266

Download this table (CSV)

When home addition permits are filed

By calendar month, 100 = an average month (the thin line). June is the busiest (140), August the quietest (68). A busy month at the permit counter usually means a longer wait for a contractor.

January: 85 (100 = an average month)February: 111 (100 = an average month)March: 106 (100 = an average month)April: 136 (100 = an average month)May: 111 (100 = an average month)June: 140 (100 = an average month)140July: 81 (100 = an average month)August: 68 (100 = an average month)September: 81 (100 = an average month)October: 123 (100 = an average month)November: 68 (100 = an average month)December: 89 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January85
February111
March106
April136
May111
June140
July81
August68
September81
October123
November68
December89

Download this table (CSV)

How long a home addition permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 103 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025153
Finished67.3%
Expired25.5%
Usual days, issue to final164
Middle half, days102–259

Download this table (CSV)

What a home addition permit is declared at

The value written on the permit at application, from 280 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$30,000
Middle half$10,000–$72,880

Download this table (CSV)

ZIP codes with the most home addition permits

Counted at the property's ZIP code. Share is the part of the city's 282 home addition permits.

ZIP codePermitsShare
235035419%
235185118%
235054315%
235023312%
235083111%
23513269%
23509217%
2350793%
2350493%
2352331%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Building: Addition - Increase Square Footage/Interior Expansion19670%
Building: Minor Addition8630%

Download this table (CSV)

How these numbers are made

Source: City of Norfolk Open Data, Permits (data.norfolk.gov, dataset fahm-yuh4), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Residential permits the City of Norfolk issues inside the city: building, electrical, mechanical, plumbing and demolition permits for single-family homes, duplexes, townhouses and their garages and sheds. Commercial permits, zoning permits and short-term rental inspections in the same file are not counted. Virginia Beach, Chesapeake, Portsmouth and the other Hampton Roads cities run their own permit offices and are not in this file.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Norfolk.
  • The city files roof replacements and rooftop solar under one work type. We count a permit of that type as solar when the city issued an electrical permit under it, and as roofing when it did not.
  • A new house or a big renovation gets separate building, electrical, mechanical and plumbing permits, so one project can count several times, once under each kind of work.
  • The value is the project cost declared on the permit. The ZIP code comes from the city assessor's record for the parcel.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Home addition permits in Norfolk, VA", https://contractorrecords.com/norfolk/addition-permits, data through September 2026, from the City of Norfolk Development Services Center building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Additions permits by month · Additions permits by calendar month (index) · Additions permits: days to final · Additions permits: declared value · Additions permits by ZIP code · Additions permits by permit type.

Common questions

  • How many home addition permits does Norfolk issue a year?About 141 a year in Norfolk: 282 permits issued October 2024 through September 2026, 129 of them in the last 12 months.
  • How long does a home addition permit take in Norfolk?The usual one took 164 days from issue to the city's final inspection, and the middle half took 102 to 259 days (103 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Norfolk file the most home addition permits?June (140 against an average month of 100); August is the quietest (68). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most home addition permits in Norfolk?23503, with 54 of the 282 (19%); then 23518 (51).