Electrical permits in Norfolk, VA

Data through September 2026 · updated 19 Oct 2026

3,913 electrical permits were issued in Norfolk, October 2024 through September 2026: about 1,956 a year and 29% of all permits. 2,003 electrical permits in the last 12 months (Oct 2025–Sep 2026), 5% more than the 1,910 in the 12 months before. The busiest month is March. The usual one took 44 days from issue to the city's final. 23518 has the most, 599.

3,913permits issued
2,003last 12 months
Marbusiest month
44days, usual issue to final
87%finished
$2,000usual declared value
Sep 2026records through

Electrical permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 234Oct2024Nov 2024: 220Dec 2024: 137Jan 2025: 143Jan2025Feb 2025: 127Mar 2025: 179Apr 2025: 138May 2025: 140Jun 2025: 147Jul 2025: 144JulAug 2025: 166Sep 2025: 135Oct 2025: 144Nov 2025: 126Dec 2025: 131Jan 2026: 161Jan2026Feb 2026: 192Mar 2026: 216Apr 2026: 188May 2026: 166Jun 2026: 188Jul 2026: 164JulAug 2026: 155Sep 2026: 172
The same numbers as a table
MonthPermits
Oct 2024234
Nov 2024220
Dec 2024137
Jan 2025143
Feb 2025127
Mar 2025179
Apr 2025138
May 2025140
Jun 2025147
Jul 2025144
Aug 2025166
Sep 2025135
Oct 2025144
Nov 2025126
Dec 2025131
Jan 2026161
Feb 2026192
Mar 2026216
Apr 2026188
May 2026166
Jun 2026188
Jul 2026164
Aug 2026155
Sep 2026172

Download this table (CSV)

When electrical permits are filed

By calendar month, 100 = an average month (the thin line). March is the busiest (121), December the quietest (82). A busy month at the permit counter usually means a longer wait for a contractor.

January: 93 (100 = an average month)February: 98 (100 = an average month)March: 121 (100 = an average month)121April: 100 (100 = an average month)May: 94 (100 = an average month)June: 103 (100 = an average month)July: 94 (100 = an average month)August: 98 (100 = an average month)September: 94 (100 = an average month)October: 116 (100 = an average month)November: 106 (100 = an average month)December: 82 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January93
February98
March121
April100
May94
June103
July94
August98
September94
October116
November106
December82

Download this table (CSV)

How long an electrical permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 1,660 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 20251,910
Finished87.0%
Expired12.6%
Usual days, issue to final44
Middle half, days12–99

Download this table (CSV)

What an electrical permit is declared at

The value written on the permit at application, from 3,758 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$2,000
Middle half$920–$4,000

Download this table (CSV)

ZIP codes with the most electrical permits

Counted at the property's ZIP code. Share is the part of the city's 3,913 electrical permits.

ZIP codePermitsShare
2351859915%
2351356514%
2350353414%
2350544411%
235093208%
235023198%
235043108%
235083078%
235233078%
235071163%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Electrical: New1,68143%
Electrical: Replacement1,36735%
Electrical: Service Upgrade47812%
Electrical: New Service2206%
Electrical: Electrical Release1424%
Electrical: Temporary Pole25under 1%

Download this table (CSV)

How Norfolk compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of Norfolk Open Data, Permits (data.norfolk.gov, dataset fahm-yuh4), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Residential permits the City of Norfolk issues inside the city: building, electrical, mechanical, plumbing and demolition permits for single-family homes, duplexes, townhouses and their garages and sheds. Commercial permits, zoning permits and short-term rental inspections in the same file are not counted. Virginia Beach, Chesapeake, Portsmouth and the other Hampton Roads cities run their own permit offices and are not in this file.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Norfolk.
  • The city files roof replacements and rooftop solar under one work type. We count a permit of that type as solar when the city issued an electrical permit under it, and as roofing when it did not.
  • A new house or a big renovation gets separate building, electrical, mechanical and plumbing permits, so one project can count several times, once under each kind of work.
  • The value is the project cost declared on the permit. The ZIP code comes from the city assessor's record for the parcel.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Electrical permits in Norfolk, VA", https://contractorrecords.com/norfolk/electrical-permits, data through September 2026, from the City of Norfolk Development Services Center building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Electrical permits by month · Electrical permits by calendar month (index) · Electrical permits: days to final · Electrical permits: declared value · Electrical permits by ZIP code · Electrical permits by permit type.

Common questions

  • How many electrical permits does Norfolk issue a year?About 1,956 a year in Norfolk: 3,913 permits issued October 2024 through September 2026, 2,003 of them in the last 12 months.
  • How long does an electrical permit take in Norfolk?The usual one took 44 days from issue to the city's final inspection, and the middle half took 12 to 99 days (1,660 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Norfolk file the most electrical permits?March (121 against an average month of 100); December is the quietest (82). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most electrical permits in Norfolk?23518, with 599 of the 3,913 (15%); then 23513 (565).