New home permits in Norfolk, VA

Data through September 2026 · updated 19 Oct 2026

490 new home permits were issued in Norfolk, October 2024 through September 2026: about 245 a year and 4% of all permits. 264 new home permits in the last 12 months (Oct 2025–Sep 2026), 17% more than the 226 in the 12 months before. The busiest month is March. The usual one took 219 days from issue to the city's final. 23518 has the most, 92.

490permits issued
264last 12 months
Marbusiest month
219days, usual issue to final
76%finished
$85,000usual declared value
Sep 2026records through

New home permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 25Oct2024Nov 2024: 14Dec 2024: 17Jan 2025: 19Jan2025Feb 2025: 13Mar 2025: 11Apr 2025: 9May 2025: 28Jun 2025: 22Jul 2025: 27JulAug 2025: 22Sep 2025: 19Oct 2025: 21Nov 2025: 22Dec 2025: 18Jan 2026: 19Jan2026Feb 2026: 18Mar 2026: 48Apr 2026: 21May 2026: 24Jun 2026: 12Jul 2026: 29JulAug 2026: 18Sep 2026: 14
The same numbers as a table
MonthPermits
Oct 202425
Nov 202414
Dec 202417
Jan 202519
Feb 202513
Mar 202511
Apr 20259
May 202528
Jun 202522
Jul 202527
Aug 202522
Sep 202519
Oct 202521
Nov 202522
Dec 202518
Jan 202619
Feb 202618
Mar 202648
Apr 202621
May 202624
Jun 202612
Jul 202629
Aug 202618
Sep 202614

Download this table (CSV)

When new home permits are filed

By calendar month, 100 = an average month (the thin line). March is the busiest (144), April the quietest (73). A busy month at the permit counter usually means a longer wait for a contractor.

January: 93 (100 = an average month)February: 76 (100 = an average month)March: 144 (100 = an average month)144April: 73 (100 = an average month)May: 127 (100 = an average month)June: 83 (100 = an average month)July: 137 (100 = an average month)August: 98 (100 = an average month)September: 81 (100 = an average month)October: 113 (100 = an average month)November: 88 (100 = an average month)December: 86 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January93
February76
March144
April73
May127
June83
July137
August98
September81
October113
November88
December86

Download this table (CSV)

How long a new home permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 173 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025226
Finished76.5%
Expired11.9%
Usual days, issue to final219
Middle half, days121–311

Download this table (CSV)

What a new home permit is declared at

The value written on the permit at application, from 482 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$85,000
Middle half$19,000–$170,000

Download this table (CSV)

ZIP codes with the most new home permits

Counted at the property's ZIP code. Share is the part of the city's 490 new home permits.

ZIP codePermitsShare
235189219%
235037014%
235046513%
235136012%
23505429%
23502429%
23508388%
23509245%
23523235%
2351782%

Download this table (CSV)

How Norfolk compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of Norfolk Open Data, Permits (data.norfolk.gov, dataset fahm-yuh4), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Residential permits the City of Norfolk issues inside the city: building, electrical, mechanical, plumbing and demolition permits for single-family homes, duplexes, townhouses and their garages and sheds. Commercial permits, zoning permits and short-term rental inspections in the same file are not counted. Virginia Beach, Chesapeake, Portsmouth and the other Hampton Roads cities run their own permit offices and are not in this file.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Norfolk.
  • The city files roof replacements and rooftop solar under one work type. We count a permit of that type as solar when the city issued an electrical permit under it, and as roofing when it did not.
  • A new house or a big renovation gets separate building, electrical, mechanical and plumbing permits, so one project can count several times, once under each kind of work.
  • The value is the project cost declared on the permit. The ZIP code comes from the city assessor's record for the parcel.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "New home permits in Norfolk, VA", https://contractorrecords.com/norfolk/new-home-permits, data through September 2026, from the City of Norfolk Development Services Center building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code.

Download the tables (CSV): New homes permits by month · New homes permits by calendar month (index) · New homes permits: days to final · New homes permits: declared value · New homes permits by ZIP code.

Common questions

  • How many new home permits does Norfolk issue a year?About 245 a year in Norfolk: 490 permits issued October 2024 through September 2026, 264 of them in the last 12 months.
  • How long does a new home permit take in Norfolk?The usual one took 219 days from issue to the city's final inspection, and the middle half took 121 to 311 days (173 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Norfolk file the most new home permits?March (144 against an average month of 100); April is the quietest (73). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most new home permits in Norfolk?23518, with 92 of the 490 (19%); then 23503 (70).