1,043 garage, shed and shade structure permits were issued in the City of Overland Park, January 2024 through September 2026: about 379 a year and 8% of all permits. 431 garage, shed and shade structure permits in the last 12 months (Oct 2025–Sep 2026), 21% more than the 357 in the 12 months before. The busiest month is July. The usual one took 55 days from issue to the city's final. 66213 has the most, 206.

1,043permits issued
431last 12 months
Julbusiest month
55days, usual issue to final
86%finished
$19,000usual declared value
Sep 2026records through

Garage, shed and shade structure permits by month

Permits issued each month, January 2024 through September 2026.

Jan 2024: 11Jan2024Feb 2024: 18Mar 2024: 27Apr 2024: 30May 2024: 34Jun 2024: 28Jul 2024: 38JulAug 2024: 39Sep 2024: 30Oct 2024: 39Nov 2024: 22Dec 2024: 22Jan 2025: 21Jan2025Feb 2025: 10Mar 2025: 31Apr 2025: 30May 2025: 45Jun 2025: 41Jul 2025: 39JulAug 2025: 31Sep 2025: 26Oct 2025: 43Nov 2025: 42Dec 2025: 22Jan 2026: 17Jan2026Feb 2026: 17Mar 2026: 42Apr 2026: 33May 2026: 46Jun 2026: 41Jul 2026: 49JulAug 2026: 35Sep 2026: 44
The same numbers as a table
MonthPermits
Jan 202411
Feb 202418
Mar 202427
Apr 202430
May 202434
Jun 202428
Jul 202438
Aug 202439
Sep 202430
Oct 202439
Nov 202422
Dec 202422
Jan 202521
Feb 202510
Mar 202531
Apr 202530
May 202545
Jun 202541
Jul 202539
Aug 202531
Sep 202526
Oct 202543
Nov 202542
Dec 202522
Jan 202617
Feb 202617
Mar 202642
Apr 202633
May 202646
Jun 202641
Jul 202649
Aug 202635
Sep 202644

Download this table (CSV)

When garage, shed and shade structure permits are filed

By calendar month, 100 = an average month (the thin line). July is the busiest (133), February the quietest (47). A busy month at the permit counter usually means a longer wait for a contractor.

January: 52 (100 = an average month)February: 47 (100 = an average month)March: 105 (100 = an average month)April: 98 (100 = an average month)May: 132 (100 = an average month)June: 116 (100 = an average month)July: 133 (100 = an average month)133August: 111 (100 = an average month)September: 105 (100 = an average month)October: 130 (100 = an average month)November: 101 (100 = an average month)December: 70 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January52
February47
March105
April98
May132
June116
July133
August111
September105
October130
November101
December70

Download this table (CSV)

How long a garage, shed and shade structure permit takes

Permits issued Jan 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 528 with a final date.

MeasureValue
Permits issued Jan 2024–Sep 2025612
Finished86.3%
Usual days, issue to final55
Middle half, days27–111

Download this table (CSV)

What a garage, shed and shade structure permit is declared at

The value written on the permit at application, from 1,043 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$19,000
Middle half$10,000–$36,588

Download this table (CSV)

ZIP codes with the most garage, shed and shade structure permits

Counted at the property's ZIP code. Share is the part of the city's 1,043 garage, shed and shade structure permits.

ZIP codePermitsShare
6621320620%
6622119919%
6622314013%
66212949%
66210808%
66207606%
66209575%
66204515%
66085454%
66224323%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Deck95892%
Accessory Structure858%

Download this table (CSV)

Nearby permit data

Garage, shed and shade structure permits for other places in Kansas City. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Overland Park ArcGIS: Building Permit Report (Building_Permits FeatureServer layer 0), read 19 Oct 2026. We count permits issued January 2024 through September 2026; denied and withdrawn permits are left out.

Building permits the City of Overland Park issues inside city limits: residential and commercial building permits and mechanical, electrical and plumbing permits (furnaces and air conditioners, electrical services, water heaters, generators, solar). Leawood, Olathe, Lenexa, Merriam and the other Johnson County cities run their own permit offices and are not in this file.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Overland Park.
  • The city publishes only permits issued since January 2024 that are issued, on a temporary certificate of occupancy or finaled; expired and voided permits are left out of the file, so no permit shows as expired.
  • A final date is the city's finalized date.
  • The value is the valuation on the permit.
  • The file has no roofing permits, so re-roofs are not shown.
  • Homes are permits the city reports as residential, including mechanical, electrical and plumbing permits for homes; commercial work counts as other.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Garage, shed and shade structure permits in the City of Overland Park, KS", https://contractorrecords.com/overland-park/accessory-permits, data through September 2026, from City of Overland Park Planning & Development Services building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Garages, sheds & shade structures permits by month · Garages, sheds & shade structures permits by calendar month (index) · Garages, sheds & shade structures permits: days to final · Garages, sheds & shade structures permits: declared value · Garages, sheds & shade structures permits by ZIP code · Garages, sheds & shade structures permits by permit type.

Common questions

  • How many garage, shed and shade structure permits does Overland Park issue a year?About 379 a year in the City of Overland Park: 1,043 permits issued January 2024 through September 2026, 431 of them in the last 12 months.
  • How long does a garage, shed and shade structure permit take in Overland Park?The usual one took 55 days from issue to the city's final inspection, and the middle half took 27 to 111 days (528 permits issued Jan 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Overland Park file the most garage, shed and shade structure permits?July (133 against an average month of 100); February is the quietest (47). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most garage, shed and shade structure permits in Overland Park?66213, with 206 of the 1,043 (20%); then 66221 (199).