Electrical permits in the City of Overland Park, KS

Data through September 2026 · updated 19 Oct 2026

1,871 electrical permits were issued in the City of Overland Park, January 2024 through September 2026: about 680 a year and 14% of all permits. 700 electrical permits in the last 12 months (Oct 2025–Sep 2026), 8% more than the 651 in the 12 months before. The busiest month is July. The usual one took 21 days from issue to the city's final. 66212 has the most, 597.

1,871permits issued
700last 12 months
Julbusiest month
21days, usual issue to final
90%finished
$3,000usual declared value
Sep 2026records through

Electrical permits by month

Permits issued each month, January 2024 through September 2026.

Jan 2024: 37Jan2024Feb 2024: 37Mar 2024: 44Apr 2024: 54May 2024: 86Jun 2024: 70Jul 2024: 54JulAug 2024: 66Sep 2024: 72Oct 2024: 64Nov 2024: 44Dec 2024: 41Jan 2025: 33Jan2025Feb 2025: 67Mar 2025: 73Apr 2025: 67May 2025: 43Jun 2025: 48Jul 2025: 70JulAug 2025: 53Sep 2025: 48Oct 2025: 75Nov 2025: 42Dec 2025: 51Jan 2026: 41Jan2026Feb 2026: 35Mar 2026: 63Apr 2026: 48May 2026: 45Jun 2026: 51Jul 2026: 109JulAug 2026: 48Sep 2026: 92
The same numbers as a table
MonthPermits
Jan 202437
Feb 202437
Mar 202444
Apr 202454
May 202486
Jun 202470
Jul 202454
Aug 202466
Sep 202472
Oct 202464
Nov 202444
Dec 202441
Jan 202533
Feb 202567
Mar 202573
Apr 202567
May 202543
Jun 202548
Jul 202570
Aug 202553
Sep 202548
Oct 202575
Nov 202542
Dec 202551
Jan 202641
Feb 202635
Mar 202663
Apr 202648
May 202645
Jun 202651
Jul 2026109
Aug 202648
Sep 202692

Download this table (CSV)

When electrical permits are filed

By calendar month, 100 = an average month (the thin line). July is the busiest (137), January the quietest (65). A busy month at the permit counter usually means a longer wait for a contractor.

January: 65 (100 = an average month)February: 82 (100 = an average month)March: 106 (100 = an average month)April: 99 (100 = an average month)May: 102 (100 = an average month)June: 99 (100 = an average month)July: 137 (100 = an average month)137August: 98 (100 = an average month)September: 125 (100 = an average month)October: 123 (100 = an average month)November: 76 (100 = an average month)December: 81 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January65
February82
March106
April99
May102
June99
July137
August98
September125
October123
November76
December81

Download this table (CSV)

How long an electrical permit takes

Permits issued Jan 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 1,048 with a final date.

MeasureValue
Permits issued Jan 2024–Sep 20251,171
Finished89.6%
Usual days, issue to final21
Middle half, days6–49

Download this table (CSV)

What an electrical permit is declared at

The value written on the permit at application, from 1,865 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$3,000
Middle half$1,500–$5,800

Download this table (CSV)

ZIP codes with the most electrical permits

Counted at the property's ZIP code. Share is the part of the city's 1,871 electrical permits.

ZIP codePermitsShare
6621259732%
6620427915%
6620724713%
662211257%
662131036%
66214985%
66202774%
66223764%
66210744%
66085412%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Electrical Service1,58685%
Generator1629%
Miscellaneous Electrical1237%

Download this table (CSV)

How Overland Park compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Electrical permits for other places in Kansas City. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Overland Park ArcGIS: Building Permit Report (Building_Permits FeatureServer layer 0), read 19 Oct 2026. We count permits issued January 2024 through September 2026; denied and withdrawn permits are left out.

Building permits the City of Overland Park issues inside city limits: residential and commercial building permits and mechanical, electrical and plumbing permits (furnaces and air conditioners, electrical services, water heaters, generators, solar). Leawood, Olathe, Lenexa, Merriam and the other Johnson County cities run their own permit offices and are not in this file.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Overland Park.
  • The city publishes only permits issued since January 2024 that are issued, on a temporary certificate of occupancy or finaled; expired and voided permits are left out of the file, so no permit shows as expired.
  • A final date is the city's finalized date.
  • The value is the valuation on the permit.
  • The file has no roofing permits, so re-roofs are not shown.
  • Homes are permits the city reports as residential, including mechanical, electrical and plumbing permits for homes; commercial work counts as other.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Electrical permits in the City of Overland Park, KS", https://contractorrecords.com/overland-park/electrical-permits, data through September 2026, from City of Overland Park Planning & Development Services building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Electrical permits by month · Electrical permits by calendar month (index) · Electrical permits: days to final · Electrical permits: declared value · Electrical permits by ZIP code · Electrical permits by permit type.

Common questions

  • How many electrical permits does Overland Park issue a year?About 680 a year in the City of Overland Park: 1,871 permits issued January 2024 through September 2026, 700 of them in the last 12 months.
  • How long does an electrical permit take in Overland Park?The usual one took 21 days from issue to the city's final inspection, and the middle half took 6 to 49 days (1,048 permits issued Jan 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Overland Park file the most electrical permits?July (137 against an average month of 100); January is the quietest (65). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most electrical permits in Overland Park?66212, with 597 of the 1,871 (32%); then 66204 (279).