How much does it cost to build an ADU in Palo Alto? The usual ADU job filed with Palo Alto is $108,045, from 205 priced permits (October 2023 through September 2026); the middle half of firms file between $66,111 and $133,896. A filed value is what the contractor wrote on the permit, not a quote or the final bill.
The usual ADU job filed with Palo Alto is $108,045, from 205 priced permits, October 2023 through September 2026. The middle half of firms usually file between $66,111 and $133,896. Half of jobs were filed for less, half for more. A filed value is what the contractor wrote on the permit, not a quote or the final bill.
Approximately, from each firm's own spread: every firm's range of filed values, weighted by its 205 priced permits across 157 firms, pooled into one. Half of Palo Alto ADU permits were filed between $67,800 and $166,000.
| Percentile | Filed value | Reads as |
|---|---|---|
| 10th | $26,100 | 1 in 10 permits filed below |
| 25th | $67,800 | 1 in 4 filed below |
| 50th | $112,000 | the middle permit |
| 75th | $166,000 | 1 in 4 filed above |
| 90th | $286,000 | 1 in 10 filed above |
Top 10 by permits in the last 12 months. Usual is each firm's middle filed value; middle half is the range its middle half of jobs were filed in; both are shown for firms with 5 or more priced permits. Busy is not the same as careful: pick what you value to build a list.
| Firm | Permits | Last 12 mo | Usual | Middle half |
|---|---|---|---|---|
| Quiroz Construction Inc | 5 | 2 | $140,590 | $133,896–$167,035 |
| Type Five Inc | 2 | 2 | — | — |
| Behrens & Curry Inc | 2 | 2 | — | — |
| Cne Construction Incorporation | 3 | 1 | — | — |
| Infinium Solar, Inc | 3 | 1 | — | — |
| Tao Mountain Construction Inc | 3 | 1 | — | — |
| Level Construction LLC | 3 | 1 | — | — |
| Admond Construction Inc | 3 | 1 | — | — |
| Gomez Garcia Construction Co | 2 | 1 | — | — |
| Ladc Construction Inc | 2 | 1 | — | — |
Line your quote up against the file. In Palo Alto, 1 in 10 ADU filed values sit under $26,100, the middle half between $67,800 and $166,000, and 1 in 10 over $286,000.
Palo Alto files the fewest ADU permits in July (70 against an average month of 100) and the most in March (146). If you can choose, ask for quotes in a quiet month. We have no prices by month, so this is about crews' schedules, not a discount. When each trade is busiest in Palo Alto →
Source: City of Palo Alto Development Center building permits on single-family, duplex and ADU homes. The window is October 2023 through September 2026; a permit filed after that isn't here yet.
Usual is the middle permit: half were filed for less, half for more. Only permits with a filed value count; a value of $0 or none is left out.
The spread is approximate: we keep seven points of each firm's own range of filed values, not every permit, and pool them.
Nobody paid to be on this page and nobody can. How the records work in Palo Alto →
ADU cost in other cities: Nashville Raleigh Denver San Diego Honolulu Bellingham San Francisco Anaheim Marin County (unincorporated) Sacramento County (unincorporated)
Other job costs in Palo Alto: Roofing · HVAC & Heat Pumps · Electrical · Water Heater · Remodel & Alteration · Plumbing & Sewer · Solar & Battery · Demolition · Windows & Doors · Foundation & Seismic · New Home