How much does solar panel installation cost in Palo Alto? The usual solar & battery job filed with Palo Alto is $24,187, from 409 priced permits (October 2023 through September 2026); the middle half of firms file between $15,500 and $28,880. A filed value is what the contractor wrote on the permit, not a quote or the final bill.
The usual solar & battery job filed with Palo Alto is $24,187, from 409 priced permits, October 2023 through September 2026. The middle half of firms usually file between $15,500 and $28,880. Half of jobs were filed for less, half for more. A filed value is what the contractor wrote on the permit, not a quote or the final bill. A solar & battery permit here usually takes 109 days from issue to final inspection. How long permits take →
Approximately, from each firm's own spread: every firm's range of filed values, weighted by its 409 priced permits across 103 firms, pooled into one. Half of Palo Alto solar & battery permits were filed between $15,700 and $35,800.
| Percentile | Filed value | Reads as |
|---|---|---|
| 10th | $10,500 | 1 in 10 permits filed below |
| 25th | $15,700 | 1 in 4 filed below |
| 50th | $24,300 | the middle permit |
| 75th | $35,800 | 1 in 4 filed above |
| 90th | $52,900 | 1 in 10 filed above |
Top 10 by permits in the last 12 months. Usual is each firm's middle filed value; middle half is the range its middle half of jobs were filed in. Busy is not the same as careful: pick what you value to build a list.
| Firm | Permits | Last 12 mo | Usual | Middle half |
|---|---|---|---|---|
| Cobalt Power Systems Inc | 59 | 24 | $25,603 | $20,609–$32,737 |
| N R G Clean Power Inc | 23 | 14 | $18,000 | $12,500–$27,500 |
| Tesla Energy Operations Inc | 30 | 11 | $14,000 | $7,437–$17,741 |
| Infinium Solar, Inc | 27 | 8 | $34,398 | $21,194–$50,283 |
| Solar Technologies | 41 | 7 | $27,864 | $21,500–$37,911 |
| Solarfargo | 16 | 6 | $31,761 | $28,140–$41,976 |
| Citadel Roofing and Solar | 7 | 5 | $10,500 | $5,875–$46,179 |
| Dura - Foam Inc | 11 | 4 | $25,000 | $22,656–$32,500 |
| Your Energy Solutions | 5 | 4 | $28,880 | $19,400–$32,860 |
| Sunvault | 6 | 3 | $23,500 | $20,500–$31,690 |
Line your quote up against the file. In Palo Alto, 1 in 10 solar & battery filed values sit under $10,500, the middle half between $15,700 and $35,800, and 1 in 10 over $52,900.
Palo Alto files the fewest solar & battery permits in May (70 against an average month of 100) and the most in October (158). If you can choose, ask for quotes in a quiet month. We have no prices by month, so this is about crews' schedules, not a discount. When each trade is busiest in Palo Alto →
Source: City of Palo Alto Development Center building permits on single-family, duplex and ADU homes. The window is October 2023 through September 2026; a permit filed after that isn't here yet.
Usual is the middle permit: half were filed for less, half for more. Only permits with a filed value count; a value of $0 or none is left out.
The spread is approximate: we keep seven points of each firm's own range of filed values, not every permit, and pool them.
Nobody paid to be on this page and nobody can. How the records work in Palo Alto →
Solar & Battery cost in other cities: Orlando New York City Chicago Cleveland Pittsburgh Miami Minneapolis St. Louis Colorado Springs Honolulu Albuquerque Boulder Greensboro Saint Paul Arlington, VA Cambridge Somerville Cary Mesa Cape Coral Provo Denton Seattle San Francisco Medford Anaheim Elk Grove Tyler, TX Marin County (unincorporated) Sacramento County (unincorporated) Citrus Heights, CA
Other job costs in Palo Alto: Roofing · HVAC & Heat Pumps · Electrical · Water Heater · Remodel & Alteration · Plumbing & Sewer · Demolition · Windows & Doors · ADU · Foundation & Seismic · New Home