Data through September 2026 · updated 18 Oct 2026
28 ZIP codes have 250 or more building permits in Portland, October 2024 through September 2026. 97219 is the busiest with 5,377 (7% of 76,879). Together they hold 93% of the permits.
Busiest first, October 2024 through September 2026. Top kind of work is the one with the most permits in that ZIP code.
| ZIP code | Permits | Share | Top kind of work |
|---|---|---|---|
| 97219 | 5,377 | 7% | Electrical (1,634) |
| 97206 | 5,228 | 7% | Electrical (1,467) |
| 97202 | 4,844 | 6% | Electrical (1,463) |
| 97217 | 4,467 | 6% | Electrical (1,365) |
| 97211 | 4,237 | 6% | Electrical (1,230) |
| 97213 | 3,995 | 5% | Electrical (1,199) |
| 97214 | 3,587 | 5% | Electrical (1,005) |
| 97212 | 3,410 | 4% | Electrical (902) |
| 97203 | 3,135 | 4% | Electrical (934) |
| 97220 | 2,897 | 4% | Electrical (1,039) |
| 97239 | 2,523 | 3% | Electrical (785) |
| 97215 | 2,413 | 3% | Electrical (644) |
| 97266 | 2,321 | 3% | Electrical (721) |
| 97221 | 2,176 | 3% | Electrical (709) |
| 97236 | 2,113 | 3% | Electrical (682) |
| 97218 | 2,039 | 3% | Electrical (594) |
| 97230 | 2,018 | 3% | Electrical (744) |
| 97232 | 1,953 | 3% | Electrical (585) |
| 97210 | 1,940 | 3% | Electrical (650) |
| 97201 | 1,845 | 2% | Electrical (561) |
| 97233 | 1,448 | 2% | Electrical (509) |
| 97216 | 1,397 | 2% | Electrical (454) |
| 97209 | 1,281 | 2% | Electrical (457) |
| 97205 | 1,109 | 1% | Electrical (317) |
| 97227 | 1,082 | 1% | Electrical (300) |
| 97204 | 1,069 | 1% | Electrical (369) |
| 97229 | 1,013 | 1% | HVAC (362) |
| 97231 | 520 | under 1% | Electrical (189) |
7 more ZIP codes have fewer than 250 permits each (124 in all), so no page.
Source: City of Portland, PortlandMaps Public/BDS_Permit FeatureServer layer 22 (All Permits), read 18 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.
Building and trade permits that Portland Permitting & Development (formerly the Bureau of Development Services) issued for property inside the City of Portland. Permits the bureau handles for places outside the city limits, and tree, nuisance, noise, land-use and right-of-way cases in the same file, are not counted. Gresham, Beaverton, Lake Oswego and the rest of the metro area run their own permit offices.
Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →
Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:
Contractor Records, "Building permits by ZIP code in Portland", https://contractorrecords.com/portland/zip/, data through September 2026, from Portland Permitting & Development building-permit records.Link to a table: ZIP codes by permits.
Download the tables (CSV): ZIP codes by permits.