Contractor Records
Home › Portland › Permits by ZIP code

Building permits by ZIP code in Portland

Data through September 2026 · updated 18 Oct 2026

28 ZIP codes have 250 or more building permits in Portland, October 2024 through September 2026. 97219 is the busiest with 5,377 (7% of 76,879). Together they hold 93% of the permits.

ZIP codes by permits

Busiest first, October 2024 through September 2026. Top kind of work is the one with the most permits in that ZIP code.

ZIP codePermitsShareTop kind of work
972195,3777%Electrical (1,634)
972065,2287%Electrical (1,467)
972024,8446%Electrical (1,463)
972174,4676%Electrical (1,365)
972114,2376%Electrical (1,230)
972133,9955%Electrical (1,199)
972143,5875%Electrical (1,005)
972123,4104%Electrical (902)
972033,1354%Electrical (934)
972202,8974%Electrical (1,039)
972392,5233%Electrical (785)
972152,4133%Electrical (644)
972662,3213%Electrical (721)
972212,1763%Electrical (709)
972362,1133%Electrical (682)
972182,0393%Electrical (594)
972302,0183%Electrical (744)
972321,9533%Electrical (585)
972101,9403%Electrical (650)
972011,8452%Electrical (561)
972331,4482%Electrical (509)
972161,3972%Electrical (454)
972091,2812%Electrical (457)
972051,1091%Electrical (317)
972271,0821%Electrical (300)
972041,0691%Electrical (369)
972291,0131%HVAC (362)
97231520under 1%Electrical (189)

7 more ZIP codes have fewer than 250 permits each (124 in all), so no page.

Download this table (CSV)

How these numbers are made

Source: City of Portland, PortlandMaps Public/BDS_Permit FeatureServer layer 22 (All Permits), read 18 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building and trade permits that Portland Permitting & Development (formerly the Bureau of Development Services) issued for property inside the City of Portland. Permits the bureau handles for places outside the city limits, and tree, nuisance, noise, land-use and right-of-way cases in the same file, are not counted. Gresham, Beaverton, Lake Oswego and the rest of the metro area run their own permit offices.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Portland.
  • Electrical, mechanical and plumbing permits are trade permits filed on their own, so one job (a remodel, say) can show up as a building permit plus several trade permits.
  • Job value is the value declared on building permits only; electrical, mechanical and plumbing permits carry no value, so costs are shown only for kinds of work filed as building permits.
  • A final date is the city's finaled date. A permit that expired or was cancelled is not counted as finished even when the file gives it a closing date.
  • The ZIP code comes from the county tax lot the permit is filed on; permits not tied to a tax lot have no ZIP code.
  • Roofing and solar jobs are picked out of residential building permits by their descriptions; a reroof that needs no structural work needs no permit in Portland, so roofing counts are low.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Building permits by ZIP code in Portland", https://contractorrecords.com/portland/zip/, data through September 2026, from Portland Permitting & Development building-permit records.

Link to a table: ZIP codes by permits.

Download the tables (CSV): ZIP codes by permits.

Common questions

  • Which ZIP code in Portland has the most building permits?97219, with 5,377 permits, October 2024 through September 2026; then 97206 (5,228).
  • Can I see the permits for one address in Portland?Not here: we publish permits by ZIP code without street addresses. The city keeps each property's permit history; search its records by address or permit number.