Contractor Records
Home › Portland › ZIP 97209

Building permits in 97209, Portland

Data through September 2026 · updated 18 Oct 2026

1,281 building permits were issued in ZIP code 97209 by Portland Permitting & Development, October 2024 through September 2026: 2% of the 76,879 in Portland, the 23rd busiest ZIP code. Electrical permits lead with 457. 662 permits in the last 12 months (Oct 2025–Sep 2026), 7% more than the 619 in the 12 months before. Permits from a city that runs its own permit office are not counted.

1,281permits in 97209
662last 12 months
4%for homes
87days, usual issue to final
Sep 2026records through

Permits in 97209 by kind of work

Share here is the part of the 1,281 permits in 97209; citywide is the same for all of Portland.

Kind of workPermitsShare hereCitywide
Electrical45736%31%
Plumbing14711%20%
HVAC12510%21%
Remodels & repairs10under 1%5%
Solar3under 1%4%
ADUs & casitas1under 1%under 1%
Demolition1under 1%under 1%
Other53742%13%

Download this table (CSV)

Permits in 97209 by year

Permits issued in each calendar year of the window.

YearMonthsPermitsPer year
2024 (from October)3141564
202512659659
2026 (through September)9481641

Download this table (CSV)

How permits in 97209 finish

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

Measure97209Citywide
Permits issued Oct 2024–Sep 202561937,776
Finished90.1%93.3%
Expired1.0%1.5%
Usual days, issue to final8744

Download this table (CSV)

How these numbers are made

Source: City of Portland, PortlandMaps Public/BDS_Permit FeatureServer layer 22 (All Permits), read 18 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building and trade permits that Portland Permitting & Development (formerly the Bureau of Development Services) issued for property inside the City of Portland. Permits the bureau handles for places outside the city limits, and tree, nuisance, noise, land-use and right-of-way cases in the same file, are not counted. Gresham, Beaverton, Lake Oswego and the rest of the metro area run their own permit offices.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Portland.
  • Electrical, mechanical and plumbing permits are trade permits filed on their own, so one job (a remodel, say) can show up as a building permit plus several trade permits.
  • Job value is the value declared on building permits only; electrical, mechanical and plumbing permits carry no value, so costs are shown only for kinds of work filed as building permits.
  • A final date is the city's finaled date. A permit that expired or was cancelled is not counted as finished even when the file gives it a closing date.
  • The ZIP code comes from the county tax lot the permit is filed on; permits not tied to a tax lot have no ZIP code.
  • Roofing and solar jobs are picked out of residential building permits by their descriptions; a reroof that needs no structural work needs no permit in Portland, so roofing counts are low.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Building permits in 97209, Portland", https://contractorrecords.com/portland/zip/97209, data through September 2026, from Portland Permitting & Development building-permit records.

Link to a table: By kind of work · By year · How permits finish.

Download the tables (CSV): Permits in 97209 by kind of work · Permits in 97209 by year · Permits in 97209: finished and days to final.

Common questions

  • How many building permits were issued in 97209?1,281 permits issued by the city in ZIP code 97209, October 2024 through September 2026: 457 electrical, 147 plumbing, 125 HVAC. 662 were in the last 12 months.
  • What is built most in 97209?Electrical: 457 of the 1,281 permits (36%), against 31% citywide.
  • How long does a permit take in 97209?The usual permit issued here Oct 2024–Sep 2025 took 87 days from issue to final (556 permits with a final date), against 44 days citywide.
  • Who did the work in 97209?The city's file doesn't name contractors, so we can't say. Ask a contractor for the permit numbers of past jobs and check them with the city.