Contractor Records
Home › Portland › ZIP 97206

Building permits in 97206, Portland

Data through September 2026 · updated 18 Oct 2026

5,228 building permits were issued in ZIP code 97206 by Portland Permitting & Development, October 2024 through September 2026: 7% of the 76,879 in Portland, the 2nd busiest ZIP code. Electrical permits lead with 1,467. 2,717 permits in the last 12 months (Oct 2025–Sep 2026), 8% more than the 2,511 in the 12 months before. Permits from a city that runs its own permit office are not counted.

5,228permits in 97206
2,717last 12 months
86%for homes
39days, usual issue to final
Sep 2026records through

Permits in 97206 by kind of work

Share here is the part of the 5,228 permits in 97206; citywide is the same for all of Portland.

Kind of workPermitsShare hereCitywide
Electrical1,46728%31%
Plumbing1,18523%20%
HVAC1,17522%21%
Solar3998%4%
Remodels & repairs3026%5%
New homes2124%3%
Demolition912%under 1%
Additions621%1%
ADUs & casitas35under 1%under 1%
Garages, sheds & shade structures21under 1%under 1%
Roofing6under 1%under 1%
Other2735%13%

Download this table (CSV)

Permits in 97206 by year

Permits issued in each calendar year of the window.

YearMonthsPermitsPer year
2024 (from October)36082,432
2025122,5902,590
2026 (through September)92,0302,707

Download this table (CSV)

How permits in 97206 finish

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

Measure97206Citywide
Permits issued Oct 2024–Sep 20252,51137,776
Finished94.2%93.3%
Expired1.1%1.5%
Usual days, issue to final3944

Download this table (CSV)

How these numbers are made

Source: City of Portland, PortlandMaps Public/BDS_Permit FeatureServer layer 22 (All Permits), read 18 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building and trade permits that Portland Permitting & Development (formerly the Bureau of Development Services) issued for property inside the City of Portland. Permits the bureau handles for places outside the city limits, and tree, nuisance, noise, land-use and right-of-way cases in the same file, are not counted. Gresham, Beaverton, Lake Oswego and the rest of the metro area run their own permit offices.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Portland.
  • Electrical, mechanical and plumbing permits are trade permits filed on their own, so one job (a remodel, say) can show up as a building permit plus several trade permits.
  • Job value is the value declared on building permits only; electrical, mechanical and plumbing permits carry no value, so costs are shown only for kinds of work filed as building permits.
  • A final date is the city's finaled date. A permit that expired or was cancelled is not counted as finished even when the file gives it a closing date.
  • The ZIP code comes from the county tax lot the permit is filed on; permits not tied to a tax lot have no ZIP code.
  • Roofing and solar jobs are picked out of residential building permits by their descriptions; a reroof that needs no structural work needs no permit in Portland, so roofing counts are low.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Building permits in 97206, Portland", https://contractorrecords.com/portland/zip/97206, data through September 2026, from Portland Permitting & Development building-permit records.

Link to a table: By kind of work · By year · How permits finish.

Download the tables (CSV): Permits in 97206 by kind of work · Permits in 97206 by year · Permits in 97206: finished and days to final.

Common questions

  • How many building permits were issued in 97206?5,228 permits issued by the city in ZIP code 97206, October 2024 through September 2026: 1,467 electrical, 1,185 plumbing, 1,175 HVAC. 2,717 were in the last 12 months.
  • What is built most in 97206?Electrical: 1,467 of the 5,228 permits (28%), against 31% citywide.
  • How long does a permit take in 97206?The usual permit issued here Oct 2024–Sep 2025 took 39 days from issue to final (2,338 permits with a final date), against 44 days citywide.
  • Who did the work in 97206?The city's file doesn't name contractors, so we can't say. Ask a contractor for the permit numbers of past jobs and check them with the city.