Solar permits in Rochester, MN

Data through September 2026 · updated 19 Oct 2026

482 solar permits were issued in Rochester, October 2024 through September 2026: about 241 a year and 2% of all permits. 172 solar permits in the last 12 months (Oct 2025–Sep 2026), 45% fewer than the 310 in the 12 months before. The busiest month is August. 55901 has the most, 192.

482permits issued
172last 12 months
Augbusiest month
$10,245usual declared value
Sep 2026records through

Solar permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 22Oct2024Nov 2024: 9Dec 2024: 13Jan 2025: 14Jan2025Feb 2025: 6Mar 2025: 14Apr 2025: 6May 2025: 16Jun 2025: 7Jul 2025: 24JulAug 2025: 135Sep 2025: 44Oct 2025: 21Nov 2025: 18Dec 2025: 9Jan 2026: 8Jan2026Feb 2026: 7Mar 2026: 12Apr 2026: 53May 2026: 10Jun 2026: 13Jul 2026: 9JulAug 2026: 8Sep 2026: 4
The same numbers as a table
MonthPermits
Oct 202422
Nov 20249
Dec 202413
Jan 202514
Feb 20256
Mar 202514
Apr 20256
May 202516
Jun 20257
Jul 202524
Aug 2025135
Sep 202544
Oct 202521
Nov 202518
Dec 20259
Jan 20268
Feb 20267
Mar 202612
Apr 202653
May 202610
Jun 202613
Jul 20269
Aug 20268
Sep 20264

Download this table (CSV)

When solar permits are filed

By calendar month, 100 = an average month (the thin line). August is the busiest (356), February the quietest (32). A busy month at the permit counter usually means a longer wait for a contractor.

January: 55 (100 = an average month)February: 32 (100 = an average month)March: 65 (100 = an average month)April: 147 (100 = an average month)May: 65 (100 = an average month)June: 50 (100 = an average month)July: 82 (100 = an average month)August: 356 (100 = an average month)356September: 120 (100 = an average month)October: 107 (100 = an average month)November: 67 (100 = an average month)December: 55 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January55
February32
March65
April147
May65
June50
July82
August356
September120
October107
November67
December55

Download this table (CSV)

What a solar permit is declared at

The value written on the permit at application, from 482 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$10,245
Middle half$4,914–$23,750

Download this table (CSV)

ZIP codes with the most solar permits

Counted at the property's ZIP code. Share is the part of the city's 482 solar permits.

ZIP codePermitsShare
5590119240%
5590610622%
559049620%
559028818%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Residential Trade: Electrical22146%
Residential Bldg: Alteration20242%
Commercial Trade: Electrical296%
Commercial Bldg: Alteration214%
Multi-Family Bldg: Alteration4under 1%
Multi-Family Trade: Electrical4under 1%
Residential Trade: Electrical (Temp. Service)1under 1%

Download this table (CSV)

Most active contractors by permits filed

The contractors named on the most solar permits in the City of Rochester building permit report file, October 2024 through September 2026, with 5 or more each. Share is the part of all 482 solar permits; 99% of them name a contractor we can show. This is volume, not quality: more permits doesn't mean better work. Individuals' names, owner-builders and blanks are left out.

ContractorPermitsShare
Everlight Solar15532%
Solar Connection Inc13127%
All Energy Solar265%
Purelight Power Newco LLC225%
Innovative Renewable Energy dba Champion Solar174%
Wolf River (LTL Lec LLC)174%
Wolf River Electric (LTL Lec LLC)174%
Freedom Forever Minnesota LLC163%
Olson Solar Energy LLC122%
Cedar Creek Energy Corporation102%

Download this table (CSV)

How these numbers are made

Source: City of Rochester, Building Permit Reports: monthly Detail Report spreadsheets (Laserfiche WebLink public repository), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out. The city's reports list permits when they are issued and say nothing about what happened after, so no finished share is shown.

Building, trade, sign and demolition permits the City of Rochester Community Development department issues inside the city. Grading permits are not counted, and neither are permits Olmsted County issues for rural townships or the neighbouring cities such as Byron, Stewartville and Kasson.

  • The city's reports list a contractor on most permits. We show only how many permits each of the most active firms filed; that is volume, not quality, and we have not matched the names to state license records.
  • The reports list permits when they are issued and say nothing about what happened after, so there is no finished share and no time to final; every permit is listed as open.
  • The value is the valuation written on the permit at issue.
  • A footing-and-foundation permit issued ahead of a new house is counted under other, so the house is counted once under new homes. Commercial and apartment building work is counted under other; their electrical, plumbing and heating permits count under those trades.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Solar permits in Rochester, MN", https://contractorrecords.com/rochester-mn/solar-permits, data through September 2026, from the City of Rochester Community Development department building-permit records.

Link to a table: By month · Season · Declared value · By ZIP code · Permit types · Most active contractors by permits filed.

Download the tables (CSV): Solar permits by month · Solar permits by calendar month (index) · Solar permits: declared value · Solar permits by ZIP code · Solar permits by permit type · Most active contractors by permits filed.

Common questions

  • How many solar permits does Rochester issue a year?About 241 a year in Rochester: 482 permits issued October 2024 through September 2026, 172 of them in the last 12 months.
  • When do people in Rochester file the most solar permits?August (356 against an average month of 100); February is the quietest (32). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most solar permits in Rochester?55901, with 192 of the 482 (40%); then 55906 (106).