278 garage, shed and shade structure permits were issued in the City of Rockford, October 2024 through September 2026: about 139 a year and 1% of all permits. 138 garage, shed and shade structure permits in the last 12 months (Oct 2025–Sep 2026), about the same as the 140 in the 12 months before. The busiest month is June.

278permits issued
138last 12 months
Junbusiest month
$8,000usual declared value
Sep 2026records through

Garage, shed and shade structure permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 18Oct2024Nov 2024: 6Dec 2024: 7Jan 2025: 0Jan2025Feb 2025: 0Mar 2025: 4Apr 2025: 19May 2025: 23Jun 2025: 23Jul 2025: 12JulAug 2025: 16Sep 2025: 12Oct 2025: 16Nov 2025: 13Dec 2025: 1Jan 2026: 5Jan2026Feb 2026: 2Mar 2026: 8Apr 2026: 12May 2026: 13Jun 2026: 16Jul 2026: 25JulAug 2026: 11Sep 2026: 16
The same numbers as a table
MonthPermits
Oct 202418
Nov 20246
Dec 20247
Jan 20250
Feb 20250
Mar 20254
Apr 202519
May 202523
Jun 202523
Jul 202512
Aug 202516
Sep 202512
Oct 202516
Nov 202513
Dec 20251
Jan 20265
Feb 20262
Mar 20268
Apr 202612
May 202613
Jun 202616
Jul 202625
Aug 202611
Sep 202616

Download this table (CSV)

When garage, shed and shade structure permits are filed

By calendar month, 100 = an average month (the thin line). June is the busiest (168), February the quietest (9). A busy month at the permit counter usually means a longer wait for a contractor.

January: 22 (100 = an average month)February: 9 (100 = an average month)March: 52 (100 = an average month)April: 134 (100 = an average month)May: 155 (100 = an average month)June: 168 (100 = an average month)168July: 160 (100 = an average month)August: 117 (100 = an average month)September: 121 (100 = an average month)October: 147 (100 = an average month)November: 82 (100 = an average month)December: 35 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January22
February9
March52
April134
May155
June168
July160
August117
September121
October147
November82
December35

Download this table (CSV)

What a garage, shed and shade structure permit is declared at

The value written on the permit at application, from 277 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$8,000
Middle half$3,440–$16,300

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Single Family Dwelling: DECK17663%
Single Family Dwelling: ACCDETACH10237%

Download this table (CSV)

How these numbers are made

Source: City of Rockford Building Permits (Illinois EDP open data, dataset 3k8p-pkx8), read 21 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out. The city's file lists permits when they are issued and has no status or final inspection date, so no finished share is shown.

Building and trade permits the City of Rockford issues inside the city limits only. Loves Park, Machesney Park, Cherry Valley and unincorporated Winnebago County issue their own permits and are not in this file.

  • The city's file names the contracting company on about half the permits. We show only how many permits the most active of them filed; that is volume, not quality.
  • The file lists permits when they are issued and has no status or final inspection date, so these pages cannot show which permits finished or how long a permit takes; every permit is listed as open.
  • The file starts in September 2024 and has no ZIP code, so there are no ZIP pages and no comparison before October 2024.
  • Gas-line permits are counted under plumbing. Siding and townhouse buildings are counted under other.
  • The value is the valuation on the permit, which sets the fee. It is not a final cost.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Garage, shed and shade structure permits in the City of Rockford, IL", https://contractorrecords.com/rockford/accessory-permits, data through September 2026, from the City of Rockford Community & Economic Development department building-permit records.

Link to a table: By month · Season · Declared value · Permit types.

Download the tables (CSV): Garages, sheds & shade structures permits by month · Garages, sheds & shade structures permits by calendar month (index) · Garages, sheds & shade structures permits: declared value · Garages, sheds & shade structures permits by permit type.

Common questions

  • How many garage, shed and shade structure permits does Rockford issue a year?About 139 a year in the City of Rockford: 278 permits issued October 2024 through September 2026, 138 of them in the last 12 months.
  • When do people in Rockford file the most garage, shed and shade structure permits?June (168 against an average month of 100); February is the quietest (9). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.