Contractor Records
Home › Rockford › Remodels & repairs

Remodel and repair permits in the City of Rockford, IL

Data through September 2026 · updated 21 Oct 2026

635 remodel and repair permits were issued in the City of Rockford, October 2024 through September 2026: about 318 a year and 3% of all permits. 316 remodel and repair permits in the last 12 months (Oct 2025–Sep 2026), about the same as the 319 in the 12 months before. The busiest month is June.

635permits issued
316last 12 months
Junbusiest month
$11,763usual declared value
Sep 2026records through

Remodel and repair permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 30Oct2024Nov 2024: 16Dec 2024: 18Jan 2025: 14Jan2025Feb 2025: 14Mar 2025: 18Apr 2025: 23May 2025: 27Jun 2025: 52Jul 2025: 37JulAug 2025: 36Sep 2025: 34Oct 2025: 27Nov 2025: 25Dec 2025: 16Jan 2026: 15Jan2026Feb 2026: 20Mar 2026: 21Apr 2026: 20May 2026: 27Jun 2026: 33Jul 2026: 45JulAug 2026: 38Sep 2026: 29
The same numbers as a table
MonthPermits
Oct 202430
Nov 202416
Dec 202418
Jan 202514
Feb 202514
Mar 202518
Apr 202523
May 202527
Jun 202552
Jul 202537
Aug 202536
Sep 202534
Oct 202527
Nov 202525
Dec 202516
Jan 202615
Feb 202620
Mar 202621
Apr 202620
May 202627
Jun 202633
Jul 202645
Aug 202638
Sep 202629

Download this table (CSV)

When remodel and repair permits are filed

By calendar month, 100 = an average month (the thin line). June is the busiest (161), January the quietest (55). A busy month at the permit counter usually means a longer wait for a contractor.

January: 55 (100 = an average month)February: 64 (100 = an average month)March: 74 (100 = an average month)April: 81 (100 = an average month)May: 102 (100 = an average month)June: 161 (100 = an average month)161July: 155 (100 = an average month)August: 140 (100 = an average month)September: 119 (100 = an average month)October: 108 (100 = an average month)November: 77 (100 = an average month)December: 64 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January55
February64
March74
April81
May102
June161
July155
August140
September119
October108
November77
December64

Download this table (CSV)

What a remodel and repair permit is declared at

The value written on the permit at application, from 635 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$11,763
Middle half$3,500–$28,000

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Single Family Dwelling: REMALT158292%
Single Family Dwelling: REMALT2366%
Single Family Dwelling: INTDEMO173%

Download this table (CSV)

Most active contractors by permits filed

The contractors named on the most remodel and repair permits in the City of Rockford building permit file, October 2024 through September 2026, with 5 or more each. Share is the part of all 635 remodel and repair permits; 6% of them name a contractor we can show. This is volume, not quality: more permits doesn't mean better work. Individuals' names, owner-builders and blanks are left out.

ContractorPermitsShare
Sullivans Home Improvement Solution6under 1%

Download this table (CSV)

How these numbers are made

Source: City of Rockford Building Permits (Illinois EDP open data, dataset 3k8p-pkx8), read 21 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out. The city's file lists permits when they are issued and has no status or final inspection date, so no finished share is shown.

Building and trade permits the City of Rockford issues inside the city limits only. Loves Park, Machesney Park, Cherry Valley and unincorporated Winnebago County issue their own permits and are not in this file.

  • The city's file names the contracting company on about half the permits. We show only how many permits the most active of them filed; that is volume, not quality.
  • The file lists permits when they are issued and has no status or final inspection date, so these pages cannot show which permits finished or how long a permit takes; every permit is listed as open.
  • The file starts in September 2024 and has no ZIP code, so there are no ZIP pages and no comparison before October 2024.
  • Gas-line permits are counted under plumbing. Siding and townhouse buildings are counted under other.
  • The value is the valuation on the permit, which sets the fee. It is not a final cost.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Remodel and repair permits in the City of Rockford, IL", https://contractorrecords.com/rockford/remodel-permits, data through September 2026, from the City of Rockford Community & Economic Development department building-permit records.

Link to a table: By month · Season · Declared value · Permit types · Most active contractors by permits filed.

Download the tables (CSV): Remodels & repairs permits by month · Remodels & repairs permits by calendar month (index) · Remodels & repairs permits: declared value · Remodels & repairs permits by permit type · Most active contractors by permits filed.

Common questions

  • How many remodel and repair permits does Rockford issue a year?About 318 a year in the City of Rockford: 635 permits issued October 2024 through September 2026, 316 of them in the last 12 months.
  • When do people in Rockford file the most remodel and repair permits?June (161 against an average month of 100); January is the quietest (55). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.