Data through September 2026 · updated 21 Oct 2026

2,647 HVAC permits were issued in the City of Rockford, October 2024 through September 2026: about 1,324 a year and 14% of all permits. 1,229 HVAC permits in the last 12 months (Oct 2025–Sep 2026), 13% fewer than the 1,418 in the 12 months before. The busiest month is October.

2,647permits issued
1,229last 12 months
Octbusiest month
$6,558usual declared value
Sep 2026records through

HVAC permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 175Oct2024Nov 2024: 122Dec 2024: 146Jan 2025: 82Jan2025Feb 2025: 105Mar 2025: 72Apr 2025: 124May 2025: 66Jun 2025: 107Jul 2025: 100JulAug 2025: 209Sep 2025: 110Oct 2025: 124Nov 2025: 106Dec 2025: 105Jan 2026: 98Jan2026Feb 2026: 85Mar 2026: 70Apr 2026: 67May 2026: 120Jun 2026: 186Jul 2026: 115JulAug 2026: 79Sep 2026: 74
The same numbers as a table
MonthPermits
Oct 2024175
Nov 2024122
Dec 2024146
Jan 202582
Feb 2025105
Mar 202572
Apr 2025124
May 202566
Jun 2025107
Jul 2025100
Aug 2025209
Sep 2025110
Oct 2025124
Nov 2025106
Dec 2025105
Jan 202698
Feb 202685
Mar 202670
Apr 202667
May 2026120
Jun 2026186
Jul 2026115
Aug 202679
Sep 202674

Download this table (CSV)

When HVAC permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (136), March the quietest (64). A busy month at the permit counter usually means a longer wait for a contractor.

January: 82 (100 = an average month)February: 86 (100 = an average month)March: 64 (100 = an average month)April: 87 (100 = an average month)May: 84 (100 = an average month)June: 133 (100 = an average month)July: 97 (100 = an average month)August: 131 (100 = an average month)September: 83 (100 = an average month)October: 136 (100 = an average month)136November: 103 (100 = an average month)December: 114 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January82
February86
March64
April87
May84
June133
July97
August131
September83
October136
November103
December114

Download this table (CSV)

What an HVAC permit is declared at

The value written on the permit at application, from 2,595 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$6,558
Middle half$4,800–$12,000

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Mechanical Permits: FURNACRES1,60361%
Mechanical Permits: FURNACCOM56821%
Mechanical Permits: REMALTCOMM1285%
Mechanical Permits: REMALT1974%
Mechanical Permits: NEW1853%
Mechanical Permits: NEWTOWN673%
Mechanical Permits: NEWCOMM22under 1%
Mechanical Permits: HOOD19under 1%
Mechanical Permits: ADDCOMM12under 1%
Mechanical Permits: REMALTMULT12under 1%

Download this table (CSV)

Most active contractors by permits filed

The contractors named on the most HVAC permits in the City of Rockford building permit file, October 2024 through September 2026, with 5 or more each. Share is the part of all 2,647 HVAC permits; 74% of them name a contractor we can show. This is volume, not quality: more permits doesn't mean better work. Individuals' names, owner-builders and blanks are left out.

ContractorPermitsShare
Pearson Plumbing & Heating27410%
Total Plumbing & Heating Ltd2519%
Jansen Heating A/C & Electrical2118%
Peason Plumbing & Heating1385%
Black Diamond Plumbing & Mechanical1194%
Greenlink Solar Solutions1174%
Allen Heating & Cooling Inc/Bomar964%
Miller Engineering Co.723%
Latino Heating & Cooling713%
Evergreen Irrigation Inc.632%

Download this table (CSV)

How these numbers are made

Source: City of Rockford Building Permits (Illinois EDP open data, dataset 3k8p-pkx8), read 21 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out. The city's file lists permits when they are issued and has no status or final inspection date, so no finished share is shown.

Building and trade permits the City of Rockford issues inside the city limits only. Loves Park, Machesney Park, Cherry Valley and unincorporated Winnebago County issue their own permits and are not in this file.

  • The city's file names the contracting company on about half the permits. We show only how many permits the most active of them filed; that is volume, not quality.
  • The file lists permits when they are issued and has no status or final inspection date, so these pages cannot show which permits finished or how long a permit takes; every permit is listed as open.
  • The file starts in September 2024 and has no ZIP code, so there are no ZIP pages and no comparison before October 2024.
  • Gas-line permits are counted under plumbing. Siding and townhouse buildings are counted under other.
  • The value is the valuation on the permit, which sets the fee. It is not a final cost.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "HVAC permits in the City of Rockford, IL", https://contractorrecords.com/rockford/hvac-permits, data through September 2026, from the City of Rockford Community & Economic Development department building-permit records.

Link to a table: By month · Season · Declared value · Permit types · Most active contractors by permits filed.

Download the tables (CSV): HVAC permits by month · HVAC permits by calendar month (index) · HVAC permits: declared value · HVAC permits by permit type · Most active contractors by permits filed.

Common questions

  • How many HVAC permits does Rockford issue a year?About 1,324 a year in the City of Rockford: 2,647 permits issued October 2024 through September 2026, 1,229 of them in the last 12 months.