Contractor Records
Home › Sacramento › Additions

Home addition permits in the City of Sacramento, CA

Data through September 2026 · updated 18 Oct 2026

419 home addition permits were issued in the City of Sacramento, October 2024 through September 2026: about 210 a year and 1% of all permits. 202 home addition permits in the last 12 months (Oct 2025–Sep 2026), 7% fewer than the 217 in the 12 months before. The busiest month is June. 95819 has the most, 61.

419permits issued
202last 12 months
Junbusiest month
82%finished
$27,000usual declared value
Sep 2026records through

Home addition permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 24Oct2024Nov 2024: 16Dec 2024: 15Jan 2025: 18Jan2025Feb 2025: 19Mar 2025: 17Apr 2025: 22May 2025: 18Jun 2025: 25Jul 2025: 17JulAug 2025: 12Sep 2025: 14Oct 2025: 20Nov 2025: 12Dec 2025: 12Jan 2026: 11Jan2026Feb 2026: 16Mar 2026: 18Apr 2026: 16May 2026: 21Jun 2026: 22Jul 2026: 22JulAug 2026: 15Sep 2026: 17
The same numbers as a table
MonthPermits
Oct 202424
Nov 202416
Dec 202415
Jan 202518
Feb 202519
Mar 202517
Apr 202522
May 202518
Jun 202525
Jul 202517
Aug 202512
Sep 202514
Oct 202520
Nov 202512
Dec 202512
Jan 202611
Feb 202616
Mar 202618
Apr 202616
May 202621
Jun 202622
Jul 202622
Aug 202615
Sep 202617

Download this table (CSV)

When home addition permits are filed

By calendar month, 100 = an average month (the thin line). June is the busiest (135), August the quietest (77). A busy month at the permit counter usually means a longer wait for a contractor.

January: 83 (100 = an average month)February: 100 (100 = an average month)March: 100 (100 = an average month)April: 109 (100 = an average month)May: 112 (100 = an average month)June: 135 (100 = an average month)135July: 112 (100 = an average month)August: 77 (100 = an average month)September: 89 (100 = an average month)October: 126 (100 = an average month)November: 80 (100 = an average month)December: 77 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January83
February100
March100
April109
May112
June135
July112
August77
September89
October126
November80
December77

Download this table (CSV)

How many home addition permits get finished

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Oct 2024–Sep 2025217
Finished82.0%
Expired12.4%

Download this table (CSV)

What a home addition permit is declared at

The value written on the permit at application, from 419 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$27,000
Middle half$10,120–$90,788

Download this table (CSV)

ZIP codes with the most home addition permits

Counted at the property's ZIP code. Share is the part of the city's 419 home addition permits.

ZIP codePermitsShare
958196115%
958185413%
958224310%
95835338%
95831338%
95816307%
95834307%
95820276%
95838184%
95817174%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Residential Addition41198%
Residential Housing Dept Permit72%
Residential Remodel1under 1%

Download this table (CSV)

Most active contractors by permits filed

The contractors named on the most home addition permits in the City of Sacramento Building Division file, October 2024 through September 2026, with 5 or more each. Share is the part of all 419 home addition permits; 72% of them name a contractor we can show. This is volume, not quality: more permits doesn't mean better work. Individuals' names, owner-builders and blanks are left out.

ContractorPermitsShare
P B C Enterprises164%
Clark Wagaman Designs123%
Pacific Builders102%
River City Patio Covers102%
West Coast Awnings Services Inc92%
R A L Builders82%
AAA Services Inc72%
California Custom Sunrooms & Patio Covers Inc72%
Exterior Improvement Incorporated61%
New Dawn Awning Corporation61%

Download this table (CSV)

Nearby permit data

Home addition permits for other places in Sacramento. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Sacramento Building Division, issued building permits (ArcGIS: BldgPermitIssued_Archive and BldgPermitIssued_CurrentYear), read 18 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building permits the City of Sacramento issues inside city limits. Unincorporated Sacramento County (Arden-Arcade, Carmichael, Fair Oaks and similar places) has its own county permit office and its own pages on this site; Elk Grove, Citrus Heights, Folsom and Rancho Cordova run their own permit offices too. None of those are in this file.

  • These pages count and sort permits. The contractor table counts permits filed per firm; it does not rate, rank or compare their work.
  • The file gives each permit's current status (finaled, issued, expired) but not the date it finaled, so we show how many permits finish but not how long they take.
  • The value is the job valuation on the permit, as filed with the city.
  • Most home permits are online e-permits that the file files under one type (Web-Minor); we sort them into roofing, HVAC, plumbing, electrical and solar from the e-permit's own wording.
  • Withdrawn, void and revoked permits are not counted.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Home addition permits in the City of Sacramento, CA", https://contractorrecords.com/sacramento/addition-permits, data through September 2026, from the City of Sacramento Community Development Department, Building Division building-permit records.

Link to a table: By month · Season · How many get finished · Declared value · By ZIP code · Permit types · Most active contractors by permits filed.

Download the tables (CSV): Additions permits by month · Additions permits by calendar month (index) · Additions permits: finished share · Additions permits: declared value · Additions permits by ZIP code · Additions permits by permit type · Most active contractors by permits filed.

Common questions

  • How many home addition permits does Sacramento issue a year?About 210 a year in the City of Sacramento: 419 permits issued October 2024 through September 2026, 202 of them in the last 12 months.
  • When do people in Sacramento file the most home addition permits?June (135 against an average month of 100); August is the quietest (77). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most home addition permits in Sacramento?95819, with 61 of the 419 (15%); then 95818 (54).