Sacramento County (unincorporated), CA building permit statistics

33,488 permits from 3,617 contractors across 14 kinds of work in unincorporated Sacramento County, October 2023 through September 2026: about 11,163 a year. HVAC is the biggest trade with 7,937 permits. The busiest month for filings is May.

33,488permits read
3,617contractors on record
14kinds of work
Maybusiest month
82%firms matched to an active license
Sep 2026records through

By trade

Firms are distinct business names on the file. A linked usual filed value opens what that work costs. Finished is the share of permits a year or more old that the county closed out. Days to finish run from issue to the county's completion date, not from application.

TradePermitsFirmsActive last 12 moUsual filed valueFinishedDays to finishBusiest month
HVAC7,937581321$15,26884.1%56July
Roofing5,397748420$16,57587.7%19April
Electrical & Panel4,054936488$3,80080.5%56September
Water Heater3,553365211$3,69571.5%38February
Remodel, Addition & Repair2,933864420$22,46490.1%85August
New Home2,3447243$444,771100.0%171May
Solar & Battery2,001236124$25,20084.4%50September
Windows & Doors1,58917686$13,11090.9%71June
Plumbing & Sewer1,50617587$9,00091.0%8April
EV Charger83911155$1,40093.9%25April
Patio Cover & Accessory Structure631231110$19,29488.0%86October
Pool & Spa3509548$68,90684.3%143September
ADU20713455$133,03993.0%254August
Demolition14710543$10,00089.7%115April

Permits by year

The file we publish splits exactly into the last 12 months on file and the 24 months before them, so these are 12-month periods ending September 2026, not calendar years. Per year scales each period to 12 months. Counts cover the 14 kinds of home work we track, not every permit Sacramento County (unincorporated) issues.

PeriodMonthsPermitsPer year
Oct 2023–Sep 20252420,73610,368
Oct 2025–Sep 2026 (last 12 months)1212,75212,752

By month

Share of filings by month, 100 = an average month (the thin line). The 11 biggest trades (every trade with 500 or more permits), October 2023 through September 2026. A tall bar is a busy month at the permit counter, which usually means a longer wait for a contractor.

HVAC

7,937 permits · busiest July, quietest November

January: 70 (100 = an average month)February: 77 (100 = an average month)March: 85 (100 = an average month)April: 114 (100 = an average month)May: 123 (100 = an average month)June: 140 (100 = an average month)July: 160 (100 = an average month)160August: 119 (100 = an average month)September: 93 (100 = an average month)October: 81 (100 = an average month)November: 62 (100 = an average month)December: 74 (100 = an average month)JFMAMJJASOND

Roofing

5,397 permits · busiest April, quietest December

January: 76 (100 = an average month)February: 87 (100 = an average month)March: 111 (100 = an average month)April: 126 (100 = an average month)126May: 116 (100 = an average month)June: 111 (100 = an average month)July: 106 (100 = an average month)August: 111 (100 = an average month)September: 117 (100 = an average month)October: 119 (100 = an average month)November: 67 (100 = an average month)December: 52 (100 = an average month)JFMAMJJASOND

Electrical & Panel

4,054 permits · busiest September, quietest November

January: 83 (100 = an average month)February: 99 (100 = an average month)March: 93 (100 = an average month)April: 113 (100 = an average month)May: 114 (100 = an average month)June: 111 (100 = an average month)July: 125 (100 = an average month)August: 123 (100 = an average month)September: 132 (100 = an average month)132October: 86 (100 = an average month)November: 60 (100 = an average month)December: 62 (100 = an average month)JFMAMJJASOND

Water Heater

3,553 permits · busiest February, quietest November

January: 113 (100 = an average month)February: 137 (100 = an average month)137March: 110 (100 = an average month)April: 108 (100 = an average month)May: 97 (100 = an average month)June: 106 (100 = an average month)July: 83 (100 = an average month)August: 95 (100 = an average month)September: 88 (100 = an average month)October: 101 (100 = an average month)November: 80 (100 = an average month)December: 82 (100 = an average month)JFMAMJJASOND

Remodel, Addition & Repair

2,933 permits · busiest August, quietest November

January: 92 (100 = an average month)February: 98 (100 = an average month)March: 94 (100 = an average month)April: 117 (100 = an average month)May: 111 (100 = an average month)June: 106 (100 = an average month)July: 116 (100 = an average month)August: 120 (100 = an average month)120September: 103 (100 = an average month)October: 101 (100 = an average month)November: 71 (100 = an average month)December: 72 (100 = an average month)JFMAMJJASOND

New Home

2,344 permits · busiest May, quietest November

January: 67 (100 = an average month)February: 82 (100 = an average month)March: 66 (100 = an average month)April: 76 (100 = an average month)May: 287 (100 = an average month)287June: 108 (100 = an average month)July: 108 (100 = an average month)August: 128 (100 = an average month)September: 114 (100 = an average month)October: 61 (100 = an average month)November: 44 (100 = an average month)December: 61 (100 = an average month)JFMAMJJASOND

Solar & Battery

2,001 permits · busiest September, quietest February

January: 70 (100 = an average month)February: 56 (100 = an average month)March: 64 (100 = an average month)April: 82 (100 = an average month)May: 67 (100 = an average month)June: 91 (100 = an average month)July: 154 (100 = an average month)August: 164 (100 = an average month)September: 216 (100 = an average month)216October: 78 (100 = an average month)November: 70 (100 = an average month)December: 88 (100 = an average month)JFMAMJJASOND

Windows & Doors

1,589 permits · busiest June, quietest December

January: 72 (100 = an average month)February: 85 (100 = an average month)March: 88 (100 = an average month)April: 122 (100 = an average month)May: 119 (100 = an average month)June: 137 (100 = an average month)137July: 112 (100 = an average month)August: 128 (100 = an average month)September: 96 (100 = an average month)October: 105 (100 = an average month)November: 72 (100 = an average month)December: 64 (100 = an average month)JFMAMJJASOND

Plumbing & Sewer

1,506 permits · busiest April, quietest December

January: 92 (100 = an average month)February: 96 (100 = an average month)March: 104 (100 = an average month)April: 128 (100 = an average month)128May: 96 (100 = an average month)June: 124 (100 = an average month)July: 97 (100 = an average month)August: 99 (100 = an average month)September: 112 (100 = an average month)October: 99 (100 = an average month)November: 78 (100 = an average month)December: 76 (100 = an average month)JFMAMJJASOND

EV Charger

839 permits · busiest April, quietest December

January: 67 (100 = an average month)February: 86 (100 = an average month)March: 76 (100 = an average month)April: 140 (100 = an average month)140May: 107 (100 = an average month)June: 106 (100 = an average month)July: 96 (100 = an average month)August: 122 (100 = an average month)September: 136 (100 = an average month)October: 134 (100 = an average month)November: 70 (100 = an average month)December: 60 (100 = an average month)JFMAMJJASOND

Patio Cover & Accessory Structure

631 permits · busiest October, quietest January

January: 59 (100 = an average month)February: 86 (100 = an average month)March: 68 (100 = an average month)April: 97 (100 = an average month)May: 129 (100 = an average month)June: 97 (100 = an average month)July: 139 (100 = an average month)August: 112 (100 = an average month)September: 108 (100 = an average month)October: 143 (100 = an average month)143November: 82 (100 = an average month)December: 80 (100 = an average month)JFMAMJJASOND
The same numbers as a table
TradeJanFebMarAprMayJunJulAugSepOctNovDec
HVAC70778511412314016011993816274
Roofing76871111261161111061111171196752
Electrical & Panel839993113114111125123132866062
Water Heater113137110108971068395881018082
Remodel, Addition & Repair9298941171111061161201031017172
New Home67826676287108108128114614461
Solar & Battery705664826791154164216787088
Windows & Doors728588122119137112128961057264
Plumbing & Sewer9296104128961249799112997876
EV Charger678676140107106961221361347060
Patio Cover & Accessory Structure59866897129971391121081438280

When Sacramento County (unincorporated) schedules each kind of work

For each trade, the month with the most permit filings and the month with the fewest, October 2023 through September 2026. Trades do not all peak together, so the busy season depends on the job. Busiest is not the same as best: these are counts of filings, not prices or weather, though a quiet month at the permit counter can mean contractors have more room in the schedule.

When is the busiest season for HVAC contractors in Sacramento County?

July: Sacramento County (unincorporated) HVAC permits peak in July (160 against an average month of 100, about 13% of a year's filings); November is the quietest (62). That is from 7,937 permits, October 2023 through September 2026. If you can choose when to schedule HVAC work, November has the fewest filings; the usual permit then takes 56 days from issue to sign-off. Busiest is not the same as best: this counts filings, not prices or weather, and we have no prices by month. See the HVAC chart →

When is the busiest season for roofers in Sacramento County?

April: Sacramento County (unincorporated) roofing permits peak in April (126 against an average month of 100, about 11% of a year's filings); December is the quietest (52). That is from 5,397 permits, October 2023 through September 2026. If you can choose when to schedule roofing work, December has the fewest filings; the usual permit then takes 19 days from issue to sign-off. Busiest is not the same as best: this counts filings, not prices or weather, and we have no prices by month. See the roofing chart →

When is the busiest season for electricians in Sacramento County?

September: Sacramento County (unincorporated) electrical & panel permits peak in September (132 against an average month of 100, about 11% of a year's filings); November is the quietest (60). That is from 4,054 permits, October 2023 through September 2026. If you can choose when to schedule electrical work, November has the fewest filings; the usual permit then takes 56 days from issue to sign-off. Busiest is not the same as best: this counts filings, not prices or weather, and we have no prices by month. See the electrical & panel chart →

When is the busiest season for water heater installers in Sacramento County?

February: Sacramento County (unincorporated) water heater permits peak in February (137 against an average month of 100, about 11% of a year's filings); November is the quietest (80). That is from 3,553 permits, October 2023 through September 2026. If you can choose when to schedule water heater replacement, November has the fewest filings; the usual permit then takes 38 days from issue to sign-off. Busiest is not the same as best: this counts filings, not prices or weather, and we have no prices by month. See the water heater chart →

When is the busiest season for remodeling contractors in Sacramento County?

August: Sacramento County (unincorporated) remodel, addition & repair permits peak in August (120 against an average month of 100, about 10% of a year's filings); November is the quietest (71). That is from 2,933 permits, October 2023 through September 2026. If you can choose when to schedule a home remodel, November has the fewest filings; the usual permit then takes 85 days from issue to sign-off. Busiest is not the same as best: this counts filings, not prices or weather, and we have no prices by month. See the remodel, addition & repair chart →

When is the busiest season for home builders in Sacramento County?

May: Sacramento County (unincorporated) new home permits peak in May (287 against an average month of 100, about 24% of a year's filings); November is the quietest (44). That is from 2,344 permits, October 2023 through September 2026. If you can choose when to schedule new home construction, November has the fewest filings; the usual permit then takes 171 days from issue to sign-off. Busiest is not the same as best: this counts filings, not prices or weather, and we have no prices by month. See the new home chart →

When is the busiest season for solar installers in Sacramento County?

September: Sacramento County (unincorporated) solar & battery permits peak in September (216 against an average month of 100, about 18% of a year's filings); February is the quietest (56). That is from 2,001 permits, October 2023 through September 2026. If you can choose when to schedule solar installation, February has the fewest filings; the usual permit then takes 50 days from issue to sign-off. Busiest is not the same as best: this counts filings, not prices or weather, and we have no prices by month. See the solar & battery chart →

When is the busiest season for window installers in Sacramento County?

June: Sacramento County (unincorporated) windows & doors permits peak in June (137 against an average month of 100, about 11% of a year's filings); December is the quietest (64). That is from 1,589 permits, October 2023 through September 2026. If you can choose when to schedule window replacement, December has the fewest filings; the usual permit then takes 71 days from issue to sign-off. Busiest is not the same as best: this counts filings, not prices or weather, and we have no prices by month. See the windows & doors chart →

When is the busiest season for plumbers in Sacramento County?

April: Sacramento County (unincorporated) plumbing & sewer permits peak in April (128 against an average month of 100, about 11% of a year's filings); December is the quietest (76). That is from 1,506 permits, October 2023 through September 2026. If you can choose when to schedule plumbing work, December has the fewest filings; the usual permit then takes 8 days from issue to sign-off. Busiest is not the same as best: this counts filings, not prices or weather, and we have no prices by month. See the plumbing & sewer chart →

When is the busiest season for EV charger installers in Sacramento County?

April: Sacramento County (unincorporated) EV charger permits peak in April (140 against an average month of 100, about 12% of a year's filings); December is the quietest (60). That is from 839 permits, October 2023 through September 2026. If you can choose when to schedule EV charger installation, December has the fewest filings; the usual permit then takes 25 days from issue to sign-off. Busiest is not the same as best: this counts filings, not prices or weather, and we have no prices by month. See the EV charger chart →

When is the busiest season for patio contractors in Sacramento County?

October: Sacramento County (unincorporated) patio cover & accessory structure permits peak in October (143 against an average month of 100, about 12% of a year's filings); January is the quietest (59). That is from 631 permits, October 2023 through September 2026. If you can choose when to schedule patio work, January has the fewest filings; the usual permit then takes 86 days from issue to sign-off. Busiest is not the same as best: this counts filings, not prices or weather, and we have no prices by month. See the patio cover & accessory structure chart →

When is the busiest season for pool builders in Sacramento County?

September: Sacramento County (unincorporated) pool & spa permits peak in September (134 against an average month of 100, about 11% of a year's filings); February is the quietest (69). That is from 350 permits, October 2023 through September 2026. If you can choose when to schedule a pool build, February has the fewest filings; the usual permit then takes 143 days from issue to sign-off. Busiest is not the same as best: this counts filings, not prices or weather, and we have no prices by month.

When is the busiest season for ADU builders in Sacramento County?

August: Sacramento County (unincorporated) ADU permits peak in August (186 against an average month of 100, about 15% of a year's filings); February is the quietest (64). That is from 207 permits, October 2023 through September 2026. If you can choose when to schedule ADU construction, February has the fewest filings; the usual permit then takes 254 days from issue to sign-off. Busiest is not the same as best: this counts filings, not prices or weather, and we have no prices by month.

When is the busiest season for demolition contractors in Sacramento County?

April: Sacramento County (unincorporated) demolition permits peak in April (139 against an average month of 100, about 12% of a year's filings); December is the quietest (33). That is from 147 permits, October 2023 through September 2026. If you can choose when to schedule demolition, December has the fewest filings; the usual permit then takes 115 days from issue to sign-off. Busiest is not the same as best: this counts filings, not prices or weather, and we have no prices by month.

Most active contractors in Sacramento County (unincorporated), last 12 months

Top 10 by permits pulled in the last 12 months, all trades. This is volume, not quality: a busy firm is not a careful one. Pick what you value on the compare page to build a ranking.

ContractorTradesLast 12 moAll permits
Bell Brother's Heating and Air IncHVAC, Electrical & Panel, Water Heater, Remodel, Addition & Repair, Windows & Doors, Plumbing & Sewer8372,253
Bonney Plumbing LLCHVAC, Electrical & Panel, Water Heater, Solar & Battery, Plumbing & Sewer, EV Charger4761,444
Lennar Homes of California LLCElectrical & Panel, New Home439864
ES Solar LLCRoofing, Electrical & Panel, Solar & Battery403504
Taylor Morrison Services IncNew Home, Plumbing & Sewer307725
Ilum SolarElectrical & Panel, Solar & Battery, EV Charger236241
Sierra Pacific Home & Comfort IncHVAC, Electrical & Panel, Water Heater, Solar & Battery, Windows & Doors, Plumbing & Sewer217446
Matulich ElectricElectrical & Panel, Water Heater217218
On-Time Air Conditioning & Heating LLCHVAC, Electrical & Panel, Water Heater, Remodel, Addition & Repair, Plumbing & Sewer206583
Sacramento Window & Door LLCRemodel, Addition & Repair, Windows & Doors189279

Permits by ZIP code

Each permit counted at its property's ZIP code, October 2023 through September 2026, for the 14 kinds of home work we track. The 10 busiest of 25 ZIP codes with 100 or more permits; each opens permits by trade and the most active contractors there.

ZIP codePermitsShareTop trade
956084,52514%HVAC
956283,69011%HVAC
958642,7328%HVAC
958292,6488%New Home
956622,4387%HVAC
958432,3627%HVAC
958212,0186%HVAC
958281,9856%HVAC
958261,5745%HVAC
958421,4074%HVAC

All 25 Sacramento County (unincorporated) ZIP codes →

How these numbers are made

Source: Sacramento County building permits on single-family, duplex and townhouse homes in the unincorporated county (the County's Accela permit layer). The window is October 2023 through September 2026; a permit filed after that isn't here yet.

A filed value is what the contractor wrote on the permit when they applied. It is not a quote and not the final bill.

Counts are permits, not jobs: one job can need several permits, and one permit can cover several visits. 81.9% of the 3,617 firms on the file match an active license at the California CSLB license master file, matched by business name because County permits record no license number; the match goes by name and can miss one.

Nobody paid to be on this page and nobody can. How the records work in Sacramento County (unincorporated) →

Common questions

  • How many building permits does Sacramento County (unincorporated) issue a year?About 11,163 a year for the 14 kinds of home work we track (33,488 permits over 36 months, October 2023 through September 2026); 12,752 in the last 12 months. That is not the county's count of every permit: it covers HVAC, roofing, electrical & panel, water heater, remodel, addition & repair, new home, solar & battery, windows & doors, plumbing & sewer, EV charger, patio cover & accessory structure, pool & spa, ADU, demolition, not commercial work or trades we don't read.
  • When should you schedule work in Sacramento County?If you can choose, book in a quiet month at the permit counter: for HVAC work, November (busiest July); for roofing work, December (busiest April); for electrical work, November (busiest September). Each trade has its own season; the questions above give every trade we track, with the usual days to sign-off.
  • Who are the most active contractors in Sacramento County (unincorporated)?By permits pulled in the last 12 months: Bell Brother's Heating and Air Inc (837); Bonney Plumbing LLC (476); Lennar Homes of California LLC (439). That is volume, not quality: compare finished share and filed values before you hire.
  • Which trade pulls the most permits in Sacramento County (unincorporated)?HVAC: 7,937 permits from 581 firms, with a usual filed value of $15,268.
  • What is the busiest month for permits in Sacramento County (unincorporated)?May, counting every trade. November is the quietest. The chart above shows each trade; they do not all peak together.
  • How many contractors are active in Sacramento County (unincorporated)?3,617 distinct business names appear on the file; 2,058 of them pulled at least one permit in the last 12 months. 81.9% of the 3,617 firms on the file match an active license at the California CSLB license master file, matched by business name because County permits record no license number; the match goes by name and can miss one.
  • How many permits get finished?For HVAC, 84.1% of permits a year or more old were closed out by the county. How long permits take in Sacramento County (unincorporated) →
  • Where does this data come from?Sacramento County building permits on single-family, duplex and townhouse homes in the unincorporated county (the County's Accela permit layer), read October 2026. How the records work in Sacramento County (unincorporated) →

Other cities: Nashville Orlando New York City Chicago Austin Raleigh Cincinnati Cleveland Pittsburgh Miami Minneapolis St. Louis Denver San Diego Colorado Springs Honolulu Albuquerque Boulder Greensboro Saint Paul Arlington, VA Scottsdale Henderson Cambridge Somerville Cary Mesa Naperville Bellevue Cape Coral Provo Palo Alto Bellingham Bend Ames Denton Sugar Land Burlington, VT Seattle San Francisco Medford Anaheim Elk Grove Wilmington, NC Bismarck Tyler, TX Columbus, OH Wheaton, IL San Diego County (unincorporated) Marin County (unincorporated) Citrus Heights, CA Waco, TX