Plumbing permits in the City of San Marcos, TX

Data through September 2026 · updated 20 Oct 2026

396 plumbing permits were issued in the City of San Marcos, October 2024 through September 2026: about 198 a year and 10% of all permits. 190 plumbing permits in the last 12 months (Oct 2025–Sep 2026), 8% fewer than the 206 in the 12 months before. The busiest month is October.

396permits issued
190last 12 months
Octbusiest month
66%finished
Sep 2026records through

Plumbing permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 16Oct2024Nov 2024: 19Dec 2024: 16Jan 2025: 21Jan2025Feb 2025: 19Mar 2025: 15Apr 2025: 11May 2025: 19Jun 2025: 12Jul 2025: 28JulAug 2025: 13Sep 2025: 17Oct 2025: 28Nov 2025: 18Dec 2025: 26Jan 2026: 17Jan2026Feb 2026: 7Mar 2026: 18Apr 2026: 8May 2026: 16Jun 2026: 14Jul 2026: 13JulAug 2026: 7Sep 2026: 18
The same numbers as a table
MonthPermits
Oct 202416
Nov 202419
Dec 202416
Jan 202521
Feb 202519
Mar 202515
Apr 202511
May 202519
Jun 202512
Jul 202528
Aug 202513
Sep 202517
Oct 202528
Nov 202518
Dec 202526
Jan 202617
Feb 20267
Mar 202618
Apr 20268
May 202616
Jun 202614
Jul 202613
Aug 20267
Sep 202618

Download this table (CSV)

When plumbing permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (133), April the quietest (58). A busy month at the permit counter usually means a longer wait for a contractor.

January: 115 (100 = an average month)February: 79 (100 = an average month)March: 100 (100 = an average month)April: 58 (100 = an average month)May: 106 (100 = an average month)June: 79 (100 = an average month)July: 124 (100 = an average month)August: 61 (100 = an average month)September: 106 (100 = an average month)October: 133 (100 = an average month)133November: 112 (100 = an average month)December: 127 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January115
February79
March100
April58
May106
June79
July124
August61
September106
October133
November112
December127

Download this table (CSV)

How many plumbing permits get finished

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Oct 2024–Sep 2025206
Finished66.0%
Expired1.0%

Download this table (CSV)

How San Marcos compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Plumbing permits for other places in Austin and San Antonio. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of San Marcos GIS: CoSM BuildingPermits (Planning/CoSM_BuildingPermits FeatureServer layer 0, from MyPermitNow), read 20 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building and trade permits the City of San Marcos, Texas issues inside city limits: new homes and commercial buildings, remodels, additions, pools, fences, decks, solar, demolition, plumbing, mechanical, electrical, sign and fire-system permits. Lawn irrigation, right-of-way, road closure, special event, watershed, site and grading permits, Texas State University and city projects, and certificates of occupancy in the same file are not counted. Kyle, Buda, New Braunfels and unincorporated Hays, Caldwell and Guadalupe counties run their own permit offices and are not in this file, and neither is San Marcos, California.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for San Marcos.
  • The file has no final inspection date, so we show no time to final. A permit counts as finished when the city marks it completed; a dormant permit counts as expired.
  • The file has no job value and no ZIP code we can publish, so we show no costs and no ZIP code pages.
  • New homes are the city's new residential permits for single-family homes, duplexes and townhouses; separate foundation-only permits for the same houses count as other, and so do new apartment buildings.
  • Lawn irrigation permits (about one per new house) are not counted. Roofing permits are rare in the file.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Plumbing permits in the City of San Marcos, TX", https://contractorrecords.com/san-marcos/plumbing-permits, data through September 2026, from City of San Marcos Planning & Development Services, Building Division building-permit records.

Link to a table: By month · Season · How many get finished.

Download the tables (CSV): Plumbing permits by month · Plumbing permits by calendar month (index) · Plumbing permits: finished share.

Common questions

  • How many plumbing permits does San Marcos issue a year?About 198 a year in the City of San Marcos: 396 permits issued October 2024 through September 2026, 190 of them in the last 12 months.
  • When do people in San Marcos file the most plumbing permits?October (133 against an average month of 100); April is the quietest (58). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.