Plumbing permits in New Braunfels, TX

Data through September 2026 · updated 19 Oct 2026

1,930 plumbing permits were issued in New Braunfels, October 2024 through September 2026: about 965 a year and 15% of all permits. 921 plumbing permits in the last 12 months (Oct 2025–Sep 2026), 9% fewer than the 1,009 in the 12 months before. The busiest month is October. The usual one took 23 days from issue to the city's final. 78130 has the most, 967.

1,930permits issued
921last 12 months
Octbusiest month
23days, usual issue to final
73%finished
Sep 2026records through

Plumbing permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 101Oct2024Nov 2024: 84Dec 2024: 62Jan 2025: 103Jan2025Feb 2025: 105Mar 2025: 84Apr 2025: 80May 2025: 90Jun 2025: 75Jul 2025: 75JulAug 2025: 69Sep 2025: 81Oct 2025: 90Nov 2025: 44Dec 2025: 83Jan 2026: 74Jan2026Feb 2026: 75Mar 2026: 67Apr 2026: 101May 2026: 80Jun 2026: 81Jul 2026: 78JulAug 2026: 66Sep 2026: 82
The same numbers as a table
MonthPermits
Oct 2024101
Nov 202484
Dec 202462
Jan 2025103
Feb 2025105
Mar 202584
Apr 202580
May 202590
Jun 202575
Jul 202575
Aug 202569
Sep 202581
Oct 202590
Nov 202544
Dec 202583
Jan 202674
Feb 202675
Mar 202667
Apr 2026101
May 202680
Jun 202681
Jul 202678
Aug 202666
Sep 202682

Download this table (CSV)

When plumbing permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (119), November the quietest (80). A busy month at the permit counter usually means a longer wait for a contractor.

January: 110 (100 = an average month)February: 112 (100 = an average month)March: 94 (100 = an average month)April: 113 (100 = an average month)May: 106 (100 = an average month)June: 97 (100 = an average month)July: 95 (100 = an average month)August: 84 (100 = an average month)September: 101 (100 = an average month)October: 119 (100 = an average month)119November: 80 (100 = an average month)December: 90 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January110
February112
March94
April113
May106
June97
July95
August84
September101
October119
November80
December90

Download this table (CSV)

How long a plumbing permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 734 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 20251,009
Finished72.7%
Expired0.0%
Usual days, issue to final23
Middle half, days6–109

Download this table (CSV)

ZIP codes with the most plumbing permits

Counted at the property's ZIP code. Share is the part of the city's 1,930 plumbing permits.

ZIP codePermitsShare
7813096750%
781321739%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Residential - Plumbing1,55380%
Commercial - Plumbing37720%

Download this table (CSV)

Most active contractors by permits filed

The contractors named on the most plumbing permits in the City of New Braunfels Open Data file, October 2024 through September 2026, with 5 or more each. Share is the part of all 1,930 plumbing permits; 99% of them name a contractor we can show. This is volume, not quality: more permits doesn't mean better work. Individuals' names, owner-builders and blanks are left out.

ContractorPermitsShare
Ott Plumbing Co23712%
Will Fix It American Residential Services LLC1045%
Local Plumbing965%
Connally Plumbing Inc663%
Jon Wayne Heating & Air663%
Culpepper Plumbing Services Inc503%
The Bearded Plumber482%
Mai VU Plumbing & Construction LLC452%
Simple Water Softeners392%
A&A Plumbing Heating & Cooling332%

Download this table (CSV)

How New Braunfels compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Plumbing permits for other places in Austin and San Antonio. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of New Braunfels Open Data, OpenData/PlanningZoning MapServer layer 10 (Permits), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building, electrical, plumbing, mechanical, irrigation, roofing and other construction permits the City of New Braunfels Development Services issues inside city limits, in both Comal and Guadalupe counties. Planning, platting, engineering, floodplain and inspection-request records are not counted.

  • The city's file lists the contractor on most permits. The contractor table counts permits filed per firm; it does not rate, rank or compare their work, and there are no firm pages for New Braunfels.
  • The file has no declared job value, so we show no costs.
  • A final date is the date the city closed the permit. A permit the city left at Issued counts as open.
  • Lawn-irrigation permits, driveways, flatwork and signs count as other. Foundation repairs count as remodels and repairs.
  • The file has no ZIP column; ZIP codes come from the address where it ends in one (about 60% of permits).

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Plumbing permits in New Braunfels, TX", https://contractorrecords.com/new-braunfels/plumbing-permits, data through September 2026, from City of New Braunfels Development Services building-permit records.

Link to a table: By month · Season · Days to final · By ZIP code · Permit types · Most active contractors by permits filed.

Download the tables (CSV): Plumbing permits by month · Plumbing permits by calendar month (index) · Plumbing permits: days to final · Plumbing permits by ZIP code · Plumbing permits by permit type · Most active contractors by permits filed.

Common questions

  • How many plumbing permits does New Braunfels issue a year?About 965 a year in New Braunfels: 1,930 permits issued October 2024 through September 2026, 921 of them in the last 12 months.
  • How long does a plumbing permit take in New Braunfels?The usual one took 23 days from issue to the city's final inspection, and the middle half took 6 to 109 days (734 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in New Braunfels file the most plumbing permits?October (119 against an average month of 100); November is the quietest (80). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most plumbing permits in New Braunfels?78130, with 967 of the 1,930 (50%); then 78132 (173).