New home permits in the City of Thornton, CO

Data through September 2026 · updated 20 Oct 2026

738 new home permits were issued in the City of Thornton, October 2024 through September 2026: about 369 a year and 10% of all permits. 327 new home permits in the last 12 months (Oct 2025–Sep 2026), 20% fewer than the 411 in the 12 months before. The busiest month is February. 80602 has the most, 708.

What this file covers: Re-roof, fence and backflow permits are left out of every month: the city's published file stops carrying them after July 2025.

738permits issued
327last 12 months
Febbusiest month
97%finished
$410,920usual declared value
Sep 2026records through

New home permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 19Oct2024Nov 2024: 9Dec 2024: 24Jan 2025: 59Jan2025Feb 2025: 75Mar 2025: 58Apr 2025: 32May 2025: 39Jun 2025: 38Jul 2025: 9JulAug 2025: 14Sep 2025: 35Oct 2025: 14Nov 2025: 14Dec 2025: 32Jan 2026: 17Jan2026Feb 2026: 10Mar 2026: 15Apr 2026: 35May 2026: 35Jun 2026: 43Jul 2026: 52JulAug 2026: 37Sep 2026: 23
The same numbers as a table
MonthPermits
Oct 202419
Nov 20249
Dec 202424
Jan 202559
Feb 202575
Mar 202558
Apr 202532
May 202539
Jun 202538
Jul 20259
Aug 202514
Sep 202535
Oct 202514
Nov 202514
Dec 202532
Jan 202617
Feb 202610
Mar 202615
Apr 202635
May 202635
Jun 202643
Jul 202652
Aug 202637
Sep 202623

Download this table (CSV)

When new home permits are filed

By calendar month, 100 = an average month (the thin line). February is the busiest (138), November the quietest (37). A busy month at the permit counter usually means a longer wait for a contractor.

January: 124 (100 = an average month)February: 138 (100 = an average month)138March: 119 (100 = an average month)April: 109 (100 = an average month)May: 120 (100 = an average month)June: 132 (100 = an average month)July: 99 (100 = an average month)August: 83 (100 = an average month)September: 94 (100 = an average month)October: 54 (100 = an average month)November: 37 (100 = an average month)December: 91 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January124
February138
March119
April109
May120
June132
July99
August83
September94
October54
November37
December91

Download this table (CSV)

How many new home permits get finished

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Oct 2024–Sep 2025411
Finished96.8%
Expired0.0%

Download this table (CSV)

What a new home permit is declared at

The value written on the permit at application, from 619 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$410,920
Middle half$363,946–$513,687

Download this table (CSV)

ZIP codes with the most new home permits

Counted at the property's ZIP code. Share is the part of the city's 738 new home permits.

ZIP codePermitsShare
8060270896%
80229213%
8026081%
802411under 1%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Residential New - Boilerplate57378%
Residential New - Townhome Unit11916%
Residential New - Shell Building294%
Residential Miscellaneous - Manufactured Home122%
Residential New - Custom Home5under 1%

Download this table (CSV)

How Thornton compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

New home permits for other places in Denver and Boulder. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Thornton Permits map service, layer Building Permits (2017-present), read 20 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building and trade permits the City of Thornton issues inside the city limits, including the part of Thornton in Weld County, except re-roof, fence and backflow/irrigation permits, which the city's published file stops carrying after July 2025 and are left out of every month. Unincorporated Adams County, Northglenn, Westminster and Federal Heights issue their own permits and are not in this file. Right-of-way permits are left out.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Thornton.
  • Re-roof, fence and backflow permits are not counted: the city's published file drops them after July 2025 (re-roofs went from hundreds a month to almost none), so counting the earlier ones would show a collapse that did not happen. Roofing is not covered on these pages for that reason.
  • The file has a status but no final date, so we can say how many permits finished but not how long they took.
  • Value is the valuation declared on the permit application, not the final cost of the job.
  • Status Closed counts as finished; Expired and Expired Closed count as expired.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "New home permits in the City of Thornton, CO", https://contractorrecords.com/thornton/new-home-permits, data through September 2026, from the City of Thornton Development Department building-permit records.

Link to a table: By month · Season · How many get finished · Declared value · By ZIP code · Permit types.

Download the tables (CSV): New homes permits by month · New homes permits by calendar month (index) · New homes permits: finished share · New homes permits: declared value · New homes permits by ZIP code · New homes permits by permit type.

Common questions

  • How many new home permits does Thornton issue a year?About 369 a year in the City of Thornton: 738 permits issued October 2024 through September 2026, 327 of them in the last 12 months.
  • When do people in Thornton file the most new home permits?February (138 against an average month of 100); November is the quietest (37). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most new home permits in Thornton?80602, with 708 of the 738 (96%); then 80229 (21).