295 new home permits were issued in the City of Centennial, October 2024 through September 2026: about 148 a year and 2% of all permits. 114 new home permits in the last 12 months (Oct 2025–Sep 2026), 37% fewer than the 181 in the 12 months before. The busiest month is July. The usual one took 224 days from issue to the city's final. 80016 has the most, 226.

295permits issued
114last 12 months
Julbusiest month
224days, usual issue to final
90%finished
$250,643usual declared value
Sep 2026records through

New home permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 4Oct2024Nov 2024: 6Dec 2024: 5Jan 2025: 12Jan2025Feb 2025: 10Mar 2025: 38Apr 2025: 32May 2025: 7Jun 2025: 40Jul 2025: 7JulAug 2025: 15Sep 2025: 5Oct 2025: 8Nov 2025: 5Dec 2025: 15Jan 2026: 0Jan2026Feb 2026: 2Mar 2026: 1Apr 2026: 1May 2026: 19Jun 2026: 3Jul 2026: 38JulAug 2026: 15Sep 2026: 7
The same numbers as a table
MonthPermits
Oct 20244
Nov 20246
Dec 20245
Jan 202512
Feb 202510
Mar 202538
Apr 202532
May 20257
Jun 202540
Jul 20257
Aug 202515
Sep 20255
Oct 20258
Nov 20255
Dec 202515
Jan 20260
Feb 20262
Mar 20261
Apr 20261
May 202619
Jun 20263
Jul 202638
Aug 202615
Sep 20267

Download this table (CSV)

When new home permits are filed

By calendar month, 100 = an average month (the thin line). July is the busiest (183), November the quietest (45). A busy month at the permit counter usually means a longer wait for a contractor.

January: 49 (100 = an average month)February: 49 (100 = an average month)March: 159 (100 = an average month)April: 134 (100 = an average month)May: 106 (100 = an average month)June: 175 (100 = an average month)July: 183 (100 = an average month)183August: 122 (100 = an average month)September: 49 (100 = an average month)October: 49 (100 = an average month)November: 45 (100 = an average month)December: 81 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January49
February49
March159
April134
May106
June175
July183
August122
September49
October49
November45
December81

Download this table (CSV)

How long a new home permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 162 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025181
Finished89.5%
Expired5.5%
Usual days, issue to final224
Middle half, days202–256

Download this table (CSV)

What a new home permit is declared at

The value written on the permit at application, from 294 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$250,643
Middle half$200,256–$340,826

Download this table (CSV)

ZIP codes with the most new home permits

Counted at the property's ZIP code. Share is the part of the city's 295 new home permits.

ZIP codePermitsShare
8001622677%
801126020%
8012183%
801221under 1%

Download this table (CSV)

How Centennial compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

New home permits for other places in Denver and Boulder. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Centennial ArcGIS Server, EPL_Permit (EnerGov permit table), read 20 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building, trade, fence and sign permits the City of Centennial issues inside the city limits only. Homes with a Centennial mailing address in unincorporated Arapahoe County, and the neighbouring cities of Greenwood Village, Littleton, Englewood, Lone Tree and Aurora, get their permits elsewhere and are not in this file.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Centennial.
  • The value is the valuation declared on the permit, which sets the fee. Many over-the-counter home permits list none or a nominal figure, so values are a guide, not a cost.
  • Hailstorms drive roofing: a storm season can double a month's permits, so roofing counts swing from year to year.
  • The city's broad 'Misc' class (EV circuits, sewer repairs, furnace swaps, siding) is sorted into trades from the short work description; anything left is a remodel or repair.
  • Homes are permits the city files as residential. Multi-family buildings and commercial work count as other.
  • A final date is the date the permit was finaled. Right-of-way, temporary use and development permits are left out.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "New home permits in the City of Centennial, CO", https://contractorrecords.com/centennial/new-home-permits, data through September 2026, from the City of Centennial Building Services building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code.

Download the tables (CSV): New homes permits by month · New homes permits by calendar month (index) · New homes permits: days to final · New homes permits: declared value · New homes permits by ZIP code.

Common questions

  • How many new home permits does Centennial issue a year?About 148 a year in the City of Centennial: 295 permits issued October 2024 through September 2026, 114 of them in the last 12 months.
  • How long does a new home permit take in Centennial?The usual one took 224 days from issue to the city's final inspection, and the middle half took 202 to 256 days (162 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Centennial file the most new home permits?July (183 against an average month of 100); November is the quietest (45). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most new home permits in Centennial?80016, with 226 of the 295 (77%); then 80112 (60).