Pool and spa permits in unincorporated Wake County and the towns of Knightdale, Wendell, Zebulon and Rolesville, NC

Data through September 2026 · updated 20 Oct 2026

461 pool and spa permits were issued in unincorporated Wake County and the towns of Knightdale, Wendell, Zebulon and Rolesville, October 2024 through September 2026: about 230 a year and 4% of all permits. 235 pool and spa permits in the last 12 months (Oct 2025–Sep 2026), 4% more than the 226 in the 12 months before. The busiest month is April. The usual one took 202 days from issue to the county's final. 27587 has the most, 133.

461permits issued
235last 12 months
Aprbusiest month
202days, usual issue to final
78%finished
$103,000usual declared value
Sep 2026records through

Pool and spa permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 12Oct2024Nov 2024: 12Dec 2024: 19Jan 2025: 22Jan2025Feb 2025: 27Mar 2025: 20Apr 2025: 38May 2025: 11Jun 2025: 17Jul 2025: 19JulAug 2025: 10Sep 2025: 19Oct 2025: 19Nov 2025: 13Dec 2025: 14Jan 2026: 16Jan2026Feb 2026: 17Mar 2026: 17Apr 2026: 25May 2026: 25Jun 2026: 24Jul 2026: 23JulAug 2026: 14Sep 2026: 28
The same numbers as a table
MonthPermits
Oct 202412
Nov 202412
Dec 202419
Jan 202522
Feb 202527
Mar 202520
Apr 202538
May 202511
Jun 202517
Jul 202519
Aug 202510
Sep 202519
Oct 202519
Nov 202513
Dec 202514
Jan 202616
Feb 202617
Mar 202617
Apr 202625
May 202625
Jun 202624
Jul 202623
Aug 202614
Sep 202628

Download this table (CSV)

When pool and spa permits are filed

By calendar month, 100 = an average month (the thin line). April is the busiest (164), August the quietest (62). A busy month at the permit counter usually means a longer wait for a contractor.

January: 99 (100 = an average month)February: 115 (100 = an average month)March: 96 (100 = an average month)April: 164 (100 = an average month)164May: 94 (100 = an average month)June: 107 (100 = an average month)July: 109 (100 = an average month)August: 62 (100 = an average month)September: 122 (100 = an average month)October: 81 (100 = an average month)November: 65 (100 = an average month)December: 86 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January99
February115
March96
April164
May94
June107
July109
August62
September122
October81
November65
December86

Download this table (CSV)

How long a pool and spa permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 176 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025226
Finished78.3%
Expired1.8%
Usual days, issue to final202
Middle half, days125–330

Download this table (CSV)

What a pool and spa permit is declared at

The value written on the permit at application, from 457 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$103,000
Middle half$60,156–$160,000

Download this table (CSV)

ZIP codes with the most pool and spa permits

Counted at the property's ZIP code. Share is the part of the county's 461 pool and spa permits.

ZIP codePermitsShare
2758713329%
276147216%
27603398%
27613347%
27606235%
27591204%
27597184%
27571163%
27539153%
27615143%

Download this table (CSV)

The county's own permit types

How the county filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Pool33573%
Pool, Spa & Hot Tub12627%

Download this table (CSV)

Nearby permit data

Pool and spa permits for other places in Raleigh–Durham. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Wake County Inspections, Development & Permits, Building Permits (ArcGIS MapServer, Wake County Open Data), read 20 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building permits Wake County Permits and Inspections issues: unincorporated Wake County, plus the towns of Knightdale, Wendell, Zebulon and Rolesville, which use the county's inspections office. Raleigh and Cary run their own permit offices and have their own pages on this site; the few county-inspected parcels inside them are left out. Apex, Wake Forest, Garner, Holly Springs, Fuquay-Varina and Morrisville also issue their own permits and appear here only for a handful of county-inspected parcels.

  • The county's file has a contractor column but it is empty on every permit, so there are no contractor lists, rankings or firm pages for Wake County.
  • The county publishes building permits only: new homes, additions, alterations, accessory buildings, pools, decks and commercial work. Separate electrical, plumbing, HVAC and roofing permits are not in the file, so those kinds of work do not appear here.
  • The value is the construction valuation declared on the permit, which sets the fee. It is not a final cost.
  • Garages, sheds and decks are counted together. Home alterations are counted as remodels and repairs unless the description says solar or a reroof.
  • A final date is the date the permit was finaled.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Pool and spa permits in unincorporated Wake County and the towns of Knightdale, Wendell, Zebulon and Rolesville, NC", https://contractorrecords.com/wake-county/pool-permits, data through September 2026, from Wake County Permits and Inspections building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Pools & spas permits by month · Pools & spas permits by calendar month (index) · Pools & spas permits: days to final · Pools & spas permits: declared value · Pools & spas permits by ZIP code · Pools & spas permits by permit type.

Common questions

  • How many pool and spa permits does Wake County issue a year?About 230 a year in unincorporated Wake County and the towns of Knightdale, Wendell, Zebulon and Rolesville: 461 permits issued October 2024 through September 2026, 235 of them in the last 12 months.
  • How long does a pool and spa permit take in Wake County?The usual one took 202 days from issue to the county's final inspection, and the middle half took 125 to 330 days (176 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Wake County file the most pool and spa permits?April (164 against an average month of 100); August is the quietest (62). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most pool and spa permits in Wake County?27587, with 133 of the 461 (29%); then 27614 (72).