Home addition permits in unincorporated Wake County and the towns of Knightdale, Wendell, Zebulon and Rolesville, NC

Data through September 2026 · updated 20 Oct 2026

588 home addition permits were issued in unincorporated Wake County and the towns of Knightdale, Wendell, Zebulon and Rolesville, October 2024 through September 2026: about 294 a year and 5% of all permits. 306 home addition permits in the last 12 months (Oct 2025–Sep 2026), 9% more than the 282 in the 12 months before. The busiest month is July. The usual one took 171 days from issue to the county's final. 27587 has the most, 96.

588permits issued
306last 12 months
Julbusiest month
171days, usual issue to final
81%finished
$50,000usual declared value
Sep 2026records through

Home addition permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 17Oct2024Nov 2024: 14Dec 2024: 19Jan 2025: 24Jan2025Feb 2025: 20Mar 2025: 25Apr 2025: 25May 2025: 27Jun 2025: 24Jul 2025: 29JulAug 2025: 31Sep 2025: 27Oct 2025: 25Nov 2025: 15Dec 2025: 16Jan 2026: 25Jan2026Feb 2026: 24Mar 2026: 25Apr 2026: 29May 2026: 29Jun 2026: 37Jul 2026: 33JulAug 2026: 27Sep 2026: 21
The same numbers as a table
MonthPermits
Oct 202417
Nov 202414
Dec 202419
Jan 202524
Feb 202520
Mar 202525
Apr 202525
May 202527
Jun 202524
Jul 202529
Aug 202531
Sep 202527
Oct 202525
Nov 202515
Dec 202516
Jan 202625
Feb 202624
Mar 202625
Apr 202629
May 202629
Jun 202637
Jul 202633
Aug 202627
Sep 202621

Download this table (CSV)

When home addition permits are filed

By calendar month, 100 = an average month (the thin line). July is the busiest (127), November the quietest (59). A busy month at the permit counter usually means a longer wait for a contractor.

January: 100 (100 = an average month)February: 90 (100 = an average month)March: 102 (100 = an average month)April: 110 (100 = an average month)May: 114 (100 = an average month)June: 124 (100 = an average month)July: 127 (100 = an average month)127August: 118 (100 = an average month)September: 98 (100 = an average month)October: 86 (100 = an average month)November: 59 (100 = an average month)December: 71 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January100
February90
March102
April110
May114
June124
July127
August118
September98
October86
November59
December71

Download this table (CSV)

How long a home addition permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 226 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025282
Finished81.2%
Expired2.1%
Usual days, issue to final171
Middle half, days100–338

Download this table (CSV)

What a home addition permit is declared at

The value written on the permit at application, from 584 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$50,000
Middle half$28,920–$113,350

Download this table (CSV)

ZIP codes with the most home addition permits

Counted at the property's ZIP code. Share is the part of the county's 588 home addition permits.

ZIP codePermitsShare
275879616%
276146010%
276036010%
276135910%
27591529%
27545417%
27606397%
27597346%
27539285%
27615264%

Download this table (CSV)

Nearby permit data

Home addition permits for other places in Raleigh–Durham. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Wake County Inspections, Development & Permits, Building Permits (ArcGIS MapServer, Wake County Open Data), read 20 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building permits Wake County Permits and Inspections issues: unincorporated Wake County, plus the towns of Knightdale, Wendell, Zebulon and Rolesville, which use the county's inspections office. Raleigh and Cary run their own permit offices and have their own pages on this site; the few county-inspected parcels inside them are left out. Apex, Wake Forest, Garner, Holly Springs, Fuquay-Varina and Morrisville also issue their own permits and appear here only for a handful of county-inspected parcels.

  • The county's file has a contractor column but it is empty on every permit, so there are no contractor lists, rankings or firm pages for Wake County.
  • The county publishes building permits only: new homes, additions, alterations, accessory buildings, pools, decks and commercial work. Separate electrical, plumbing, HVAC and roofing permits are not in the file, so those kinds of work do not appear here.
  • The value is the construction valuation declared on the permit, which sets the fee. It is not a final cost.
  • Garages, sheds and decks are counted together. Home alterations are counted as remodels and repairs unless the description says solar or a reroof.
  • A final date is the date the permit was finaled.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Home addition permits in unincorporated Wake County and the towns of Knightdale, Wendell, Zebulon and Rolesville, NC", https://contractorrecords.com/wake-county/addition-permits, data through September 2026, from Wake County Permits and Inspections building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code.

Download the tables (CSV): Additions permits by month · Additions permits by calendar month (index) · Additions permits: days to final · Additions permits: declared value · Additions permits by ZIP code.

Common questions

  • How many home addition permits does Wake County issue a year?About 294 a year in unincorporated Wake County and the towns of Knightdale, Wendell, Zebulon and Rolesville: 588 permits issued October 2024 through September 2026, 306 of them in the last 12 months.
  • How long does a home addition permit take in Wake County?The usual one took 171 days from issue to the county's final inspection, and the middle half took 100 to 338 days (226 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Wake County file the most home addition permits?July (127 against an average month of 100); November is the quietest (59). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most home addition permits in Wake County?27587, with 96 of the 588 (16%); then 27614 (60).