Electrical permits in Worcester, MA

Data through September 2026 · updated 19 Oct 2026

4,744 electrical permits were issued in Worcester, October 2024 through September 2026: about 2,372 a year and 22% of all permits. 2,453 electrical permits in the last 12 months (Oct 2025–Sep 2026), 7% more than the 2,291 in the 12 months before. The busiest month is October. 01604 has the most, 1,011.

4,744permits issued
2,453last 12 months
Octbusiest month
99%finished
Sep 2026records through

Electrical permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 206Oct2024Nov 2024: 179Dec 2024: 177Jan 2025: 242Jan2025Feb 2025: 175Mar 2025: 174Apr 2025: 195May 2025: 194Jun 2025: 190Jul 2025: 181JulAug 2025: 191Sep 2025: 187Oct 2025: 270Nov 2025: 174Dec 2025: 192Jan 2026: 191Jan2026Feb 2026: 157Mar 2026: 202Apr 2026: 199May 2026: 186Jun 2026: 211Jul 2026: 255JulAug 2026: 199Sep 2026: 217
The same numbers as a table
MonthPermits
Oct 2024206
Nov 2024179
Dec 2024177
Jan 2025242
Feb 2025175
Mar 2025174
Apr 2025195
May 2025194
Jun 2025190
Jul 2025181
Aug 2025191
Sep 2025187
Oct 2025270
Nov 2025174
Dec 2025192
Jan 2026191
Feb 2026157
Mar 2026202
Apr 2026199
May 2026186
Jun 2026211
Jul 2026255
Aug 2026199
Sep 2026217

Download this table (CSV)

When electrical permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (120), February the quietest (84). A busy month at the permit counter usually means a longer wait for a contractor.

January: 110 (100 = an average month)February: 84 (100 = an average month)March: 95 (100 = an average month)April: 100 (100 = an average month)May: 96 (100 = an average month)June: 101 (100 = an average month)July: 110 (100 = an average month)August: 99 (100 = an average month)September: 102 (100 = an average month)October: 120 (100 = an average month)120November: 89 (100 = an average month)December: 93 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January110
February84
March95
April100
May96
June101
July110
August99
September102
October120
November89
December93

Download this table (CSV)

How many electrical permits get finished

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Oct 2024–Sep 20252,291
Finished99.1%

Download this table (CSV)

ZIP codes with the most electrical permits

Counted at the property's ZIP code. Share is the part of the city's 4,744 electrical permits.

ZIP codePermitsShare
016041,01121%
0160283318%
0160668414%
0160961113%
0160557412%
0160349210%
016102816%
016072265%
0160812under 1%
016111under 1%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Electrical: Residential Additions Renovations Alterations Demolition2,42751%
Electrical: Boilers HVAC Water Heaters1,24526%
Electrical: Service Upgrade67814%
Electrical: New Construction -Residential Electrical2405%
Electrical: Service Upgrade - Underground38under 1%
Electrical: Pool - Above Ground25under 1%
Electrical: Residential Generator Wiring25under 1%
Electrical: Temporary Service23under 1%
Electrical: Smoke and CO Alarm22under 1%
Electrical: Pool - Inground11under 1%

Download this table (CSV)

How Worcester compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Electrical permits for other places in Boston. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Worcester, Informing Worcester open data: Building, Electrical, Gas, Plumbing and Mechanical Permits (ArcGIS layers), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Residential permits the City of Worcester's Department of Inspectional Services issues inside the city: building, electrical, gas, plumbing and mechanical permits for houses, two-families and triple-deckers and other apartment buildings. Commercial, mixed-use, school and municipal permits in the same files are not counted. Shrewsbury, Auburn and the other towns around Worcester run their own permit offices and are not in these files.

  • We don't use the contractor names in the city's files. They are a mix of license holders' personal names and company names with no license number, so we can't match them to firms reliably. There are no contractor lists, rankings or firm pages for Worcester.
  • The files have no declared job value, so we show no costs.
  • The files have no final inspection date, so there is no time-to-final here. A permit counts as finished when the city marks it Complete; every other permit is open. The city has no separate expired status.
  • Permits on buildings with three or more units count in the totals but not as homes.
  • Insulation and siding permits count as remodels and repairs. Decks, and building permits the city files with no stated purpose, count under Other.
  • A new house gets separate building, electrical, gas and plumbing permits, so one project can count several times, once under each kind of work.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Electrical permits in Worcester, MA", https://contractorrecords.com/worcester/electrical-permits, data through September 2026, from the City of Worcester Department of Inspectional Services building-permit records.

Link to a table: By month · Season · How many get finished · By ZIP code · Permit types.

Download the tables (CSV): Electrical permits by month · Electrical permits by calendar month (index) · Electrical permits: finished share · Electrical permits by ZIP code · Electrical permits by permit type.

Common questions

  • How many electrical permits does Worcester issue a year?About 2,372 a year in Worcester: 4,744 permits issued October 2024 through September 2026, 2,453 of them in the last 12 months.
  • When do people in Worcester file the most electrical permits?October (120 against an average month of 100); February is the quietest (84). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most electrical permits in Worcester?01604, with 1,011 of the 4,744 (21%); then 01602 (833).