Contractor Records
Home › Worcester › Remodels & repairs

Remodel and repair permits in Worcester, MA

Data through September 2026 · updated 19 Oct 2026

4,623 remodel and repair permits were issued in Worcester, October 2024 through September 2026: about 2,312 a year and 22% of all permits. 1,819 remodel and repair permits in the last 12 months (Oct 2025–Sep 2026), 35% fewer than the 2,804 in the 12 months before. The busiest month is October. 01604 has the most, 970.

4,623permits issued
1,819last 12 months
Octbusiest month
43%finished
Sep 2026records through

Remodel and repair permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 289Oct2024Nov 2024: 235Dec 2024: 194Jan 2025: 219Jan2025Feb 2025: 221Mar 2025: 254Apr 2025: 268May 2025: 204Jun 2025: 161Jul 2025: 175JulAug 2025: 317Sep 2025: 267Oct 2025: 264Nov 2025: 265Dec 2025: 289Jan 2026: 203Jan2026Feb 2026: 201Mar 2026: 194Apr 2026: 220May 2026: 144Jun 2026: 23Jul 2026: 9JulAug 2026: 5Sep 2026: 2
The same numbers as a table
MonthPermits
Oct 2024289
Nov 2024235
Dec 2024194
Jan 2025219
Feb 2025221
Mar 2025254
Apr 2025268
May 2025204
Jun 2025161
Jul 2025175
Aug 2025317
Sep 2025267
Oct 2025264
Nov 2025265
Dec 2025289
Jan 2026203
Feb 2026201
Mar 2026194
Apr 2026220
May 2026144
Jun 202623
Jul 20269
Aug 20265
Sep 20262

Download this table (CSV)

When remodel and repair permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (144), June the quietest (48). A busy month at the permit counter usually means a longer wait for a contractor.

January: 110 (100 = an average month)February: 110 (100 = an average month)March: 116 (100 = an average month)April: 127 (100 = an average month)May: 90 (100 = an average month)June: 48 (100 = an average month)July: 48 (100 = an average month)August: 84 (100 = an average month)September: 70 (100 = an average month)October: 144 (100 = an average month)144November: 130 (100 = an average month)December: 125 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January110
February110
March116
April127
May90
June48
July48
August84
September70
October144
November130
December125

Download this table (CSV)

How many remodel and repair permits get finished

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Oct 2024–Sep 20252,804
Finished43.4%

Download this table (CSV)

ZIP codes with the most remodel and repair permits

Counted at the property's ZIP code. Share is the part of the city's 4,623 remodel and repair permits.

ZIP codePermitsShare
0160497021%
0160289419%
0160688219%
0160558113%
0160353712%
016093888%
016071894%
016101593%
016084under 1%
016111under 1%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Building: Alteration Renovations Repairs2,74859%
Building: Insulation1,71137%
Building: Siding1303%
Building: Restore After Fire22under 1%
Building: Foundation12under 1%

Download this table (CSV)

How Worcester compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Remodel and repair permits for other places in Boston. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Worcester, Informing Worcester open data: Building, Electrical, Gas, Plumbing and Mechanical Permits (ArcGIS layers), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Residential permits the City of Worcester's Department of Inspectional Services issues inside the city: building, electrical, gas, plumbing and mechanical permits for houses, two-families and triple-deckers and other apartment buildings. Commercial, mixed-use, school and municipal permits in the same files are not counted. Shrewsbury, Auburn and the other towns around Worcester run their own permit offices and are not in these files.

  • We don't use the contractor names in the city's files. They are a mix of license holders' personal names and company names with no license number, so we can't match them to firms reliably. There are no contractor lists, rankings or firm pages for Worcester.
  • The files have no declared job value, so we show no costs.
  • The files have no final inspection date, so there is no time-to-final here. A permit counts as finished when the city marks it Complete; every other permit is open. The city has no separate expired status.
  • Permits on buildings with three or more units count in the totals but not as homes.
  • Insulation and siding permits count as remodels and repairs. Decks, and building permits the city files with no stated purpose, count under Other.
  • A new house gets separate building, electrical, gas and plumbing permits, so one project can count several times, once under each kind of work.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Remodel and repair permits in Worcester, MA", https://contractorrecords.com/worcester/remodel-permits, data through September 2026, from the City of Worcester Department of Inspectional Services building-permit records.

Link to a table: By month · Season · How many get finished · By ZIP code · Permit types.

Download the tables (CSV): Remodels & repairs permits by month · Remodels & repairs permits by calendar month (index) · Remodels & repairs permits: finished share · Remodels & repairs permits by ZIP code · Remodels & repairs permits by permit type.

Common questions

  • How many remodel and repair permits does Worcester issue a year?About 2,312 a year in Worcester: 4,623 permits issued October 2024 through September 2026, 1,819 of them in the last 12 months.
  • When do people in Worcester file the most remodel and repair permits?October (144 against an average month of 100); June is the quietest (48). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most remodel and repair permits in Worcester?01604, with 970 of the 4,623 (21%); then 01602 (894).