703 HVAC permits were issued in Worcester, October 2024 through September 2026: about 352 a year and 3% of all permits. 392 HVAC permits in the last 12 months (Oct 2025–Sep 2026), 26% more than the 311 in the 12 months before. The busiest month is September. 01604 has the most, 128.

703permits issued
392last 12 months
Sepbusiest month
39%finished
Sep 2026records through

HVAC permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 30Oct2024Nov 2024: 25Dec 2024: 23Jan 2025: 22Jan2025Feb 2025: 16Mar 2025: 26Apr 2025: 17May 2025: 29Jun 2025: 39Jul 2025: 34JulAug 2025: 19Sep 2025: 31Oct 2025: 25Nov 2025: 37Dec 2025: 18Jan 2026: 26Jan2026Feb 2026: 23Mar 2026: 24Apr 2026: 40May 2026: 34Jun 2026: 37Jul 2026: 41JulAug 2026: 39Sep 2026: 48
The same numbers as a table
MonthPermits
Oct 202430
Nov 202425
Dec 202423
Jan 202522
Feb 202516
Mar 202526
Apr 202517
May 202529
Jun 202539
Jul 202534
Aug 202519
Sep 202531
Oct 202525
Nov 202537
Dec 202518
Jan 202626
Feb 202623
Mar 202624
Apr 202640
May 202634
Jun 202637
Jul 202641
Aug 202639
Sep 202648

Download this table (CSV)

When HVAC permits are filed

By calendar month, 100 = an average month (the thin line). September is the busiest (135), February the quietest (67). A busy month at the permit counter usually means a longer wait for a contractor.

January: 82 (100 = an average month)February: 67 (100 = an average month)March: 85 (100 = an average month)April: 97 (100 = an average month)May: 108 (100 = an average month)June: 130 (100 = an average month)July: 128 (100 = an average month)August: 99 (100 = an average month)September: 135 (100 = an average month)135October: 94 (100 = an average month)November: 106 (100 = an average month)December: 70 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January82
February67
March85
April97
May108
June130
July128
August99
September135
October94
November106
December70

Download this table (CSV)

How many HVAC permits get finished

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Oct 2024–Sep 2025311
Finished39.2%

Download this table (CSV)

ZIP codes with the most HVAC permits

Counted at the property's ZIP code. Share is the part of the city's 703 HVAC permits.

ZIP codePermitsShare
0160412818%
0160212418%
0160612117%
0160911516%
016058913%
01603609%
01607385%
01610254%
016081under 1%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Mechanical: Mechanical: All Others63791%
Building: New Stove Wood/Pellet548%
Mechanical: Miscellaneous Mechanical Repairs122%

Download this table (CSV)

How Worcester compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

HVAC permits for other places in Boston. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Worcester, Informing Worcester open data: Building, Electrical, Gas, Plumbing and Mechanical Permits (ArcGIS layers), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Residential permits the City of Worcester's Department of Inspectional Services issues inside the city: building, electrical, gas, plumbing and mechanical permits for houses, two-families and triple-deckers and other apartment buildings. Commercial, mixed-use, school and municipal permits in the same files are not counted. Shrewsbury, Auburn and the other towns around Worcester run their own permit offices and are not in these files.

  • We don't use the contractor names in the city's files. They are a mix of license holders' personal names and company names with no license number, so we can't match them to firms reliably. There are no contractor lists, rankings or firm pages for Worcester.
  • The files have no declared job value, so we show no costs.
  • The files have no final inspection date, so there is no time-to-final here. A permit counts as finished when the city marks it Complete; every other permit is open. The city has no separate expired status.
  • Permits on buildings with three or more units count in the totals but not as homes.
  • Insulation and siding permits count as remodels and repairs. Decks, and building permits the city files with no stated purpose, count under Other.
  • A new house gets separate building, electrical, gas and plumbing permits, so one project can count several times, once under each kind of work.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "HVAC permits in Worcester, MA", https://contractorrecords.com/worcester/hvac-permits, data through September 2026, from the City of Worcester Department of Inspectional Services building-permit records.

Link to a table: By month · Season · How many get finished · By ZIP code · Permit types.

Download the tables (CSV): HVAC permits by month · HVAC permits by calendar month (index) · HVAC permits: finished share · HVAC permits by ZIP code · HVAC permits by permit type.

Common questions

  • How many HVAC permits does Worcester issue a year?About 352 a year in Worcester: 703 permits issued October 2024 through September 2026, 392 of them in the last 12 months.
  • When do people in Worcester file the most HVAC permits?September (135 against an average month of 100); February is the quietest (67). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most HVAC permits in Worcester?01604, with 128 of the 703 (18%); then 01602 (124).