Contractor Records
Home › Aurora › Electrical

Electrical permits in Aurora, CO

Data through September 2026 · updated 19 Oct 2026

3,259 electrical permits were issued in Aurora, October 2024 through September 2026: about 1,630 a year and 10% of all permits. 1,558 electrical permits in the last 12 months (Oct 2025–Sep 2026), 8% fewer than the 1,701 in the 12 months before. The busiest month is August.

3,259permits issued
1,558last 12 months
Augbusiest month
$3,800usual declared value
Sep 2026records through

Electrical permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 175Oct2024Nov 2024: 124Dec 2024: 141Jan 2025: 120Jan2025Feb 2025: 129Mar 2025: 137Apr 2025: 137May 2025: 140Jun 2025: 161Jul 2025: 150JulAug 2025: 144Sep 2025: 143Oct 2025: 138Nov 2025: 103Dec 2025: 101Jan 2026: 120Jan2026Feb 2026: 90Mar 2026: 128Apr 2026: 136May 2026: 131Jun 2026: 145Jul 2026: 164JulAug 2026: 177Sep 2026: 125
The same numbers as a table
MonthPermits
Oct 2024175
Nov 2024124
Dec 2024141
Jan 2025120
Feb 2025129
Mar 2025137
Apr 2025137
May 2025140
Jun 2025161
Jul 2025150
Aug 2025144
Sep 2025143
Oct 2025138
Nov 2025103
Dec 2025101
Jan 2026120
Feb 202690
Mar 2026128
Apr 2026136
May 2026131
Jun 2026145
Jul 2026164
Aug 2026177
Sep 2026125

Download this table (CSV)

When electrical permits are filed

By calendar month, 100 = an average month (the thin line). August is the busiest (118), February the quietest (81). A busy month at the permit counter usually means a longer wait for a contractor.

January: 88 (100 = an average month)February: 81 (100 = an average month)March: 98 (100 = an average month)April: 101 (100 = an average month)May: 100 (100 = an average month)June: 113 (100 = an average month)July: 116 (100 = an average month)August: 118 (100 = an average month)118September: 99 (100 = an average month)October: 115 (100 = an average month)November: 84 (100 = an average month)December: 89 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January88
February81
March98
April101
May100
June113
July116
August118
September99
October115
November84
December89

Download this table (CSV)

What an electrical permit is declared at

The value written on the permit at application, from 3,239 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$3,800
Middle half$1,750–$7,470

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Electrical Permit3,22299%
Residential Miscellaneous371%

Download this table (CSV)

Nearby permit data

Electrical permits for other places in Denver and Boulder. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Aurora OpenData MapServer layer 44 (Building Permits), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out. The file carries no usable permit status, so it can't say which permits were finished, so no finished share is shown.

Building permits the City of Aurora Building Division issued inside the city (parts of Arapahoe, Adams and Douglas counties). Plan reviews, master plans, right-of-way permits and tree mitigation in the same feed are not counted. Unincorporated Arapahoe and Adams County and the neighbouring cities issue their own permits.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Aurora.
  • The file has no status and no final date, so we cannot show which permits finished or how long they took.
  • The file has no ZIP code, so there are no ZIP code pages.
  • Job value is the valuation declared on the permit.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Electrical permits in Aurora, CO", https://contractorrecords.com/aurora-co/electrical-permits, data through September 2026, from City of Aurora Building Division building-permit records.

Link to a table: By month · Season · Declared value · Permit types.

Download the tables (CSV): Electrical permits by month · Electrical permits by calendar month (index) · Electrical permits: declared value · Electrical permits by permit type.

Common questions

  • How many electrical permits does Aurora issue a year?About 1,630 a year in Aurora: 3,259 permits issued October 2024 through September 2026, 1,558 of them in the last 12 months.
  • When do people in Aurora file the most electrical permits?August (118 against an average month of 100); February is the quietest (81). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.