Electrical permits in the City of Centennial, CO

Data through September 2026 · updated 20 Oct 2026

1,216 electrical permits were issued in the City of Centennial, October 2024 through September 2026: about 608 a year and 9% of all permits. 558 electrical permits in the last 12 months (Oct 2025–Sep 2026), 15% fewer than the 658 in the 12 months before. The busiest month is October. The usual one took 18 days from issue to the city's final. 80122 has the most, 398.

1,216permits issued
558last 12 months
Octbusiest month
18days, usual issue to final
78%finished
$3,500usual declared value
Sep 2026records through

Electrical permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 74Oct2024Nov 2024: 42Dec 2024: 38Jan 2025: 57Jan2025Feb 2025: 43Mar 2025: 54Apr 2025: 70May 2025: 49Jun 2025: 57Jul 2025: 53JulAug 2025: 49Sep 2025: 72Oct 2025: 60Nov 2025: 35Dec 2025: 49Jan 2026: 46Jan2026Feb 2026: 45Mar 2026: 50Apr 2026: 49May 2026: 35Jun 2026: 39Jul 2026: 55JulAug 2026: 49Sep 2026: 46
The same numbers as a table
MonthPermits
Oct 202474
Nov 202442
Dec 202438
Jan 202557
Feb 202543
Mar 202554
Apr 202570
May 202549
Jun 202557
Jul 202553
Aug 202549
Sep 202572
Oct 202560
Nov 202535
Dec 202549
Jan 202646
Feb 202645
Mar 202650
Apr 202649
May 202635
Jun 202639
Jul 202655
Aug 202649
Sep 202646

Download this table (CSV)

When electrical permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (132), November the quietest (76). A busy month at the permit counter usually means a longer wait for a contractor.

January: 102 (100 = an average month)February: 87 (100 = an average month)March: 103 (100 = an average month)April: 117 (100 = an average month)May: 83 (100 = an average month)June: 95 (100 = an average month)July: 107 (100 = an average month)August: 97 (100 = an average month)September: 116 (100 = an average month)October: 132 (100 = an average month)132November: 76 (100 = an average month)December: 86 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January102
February87
March103
April117
May83
June95
July107
August97
September116
October132
November76
December86

Download this table (CSV)

How long an electrical permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 514 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025658
Finished78.4%
Expired20.7%
Usual days, issue to final18
Middle half, days7–47

Download this table (CSV)

What an electrical permit is declared at

The value written on the permit at application, from 1,214 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$3,500
Middle half$1,500–$5,880

Download this table (CSV)

ZIP codes with the most electrical permits

Counted at the property's ZIP code. Share is the part of the city's 1,216 electrical permits.

ZIP codePermitsShare
8012239833%
8011230225%
8001521318%
8012117915%
80111726%
80016524%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Electrical Service Change67155%
Misc54545%

Download this table (CSV)

How Centennial compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Electrical permits for other places in Denver and Boulder. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Centennial ArcGIS Server, EPL_Permit (EnerGov permit table), read 20 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building, trade, fence and sign permits the City of Centennial issues inside the city limits only. Homes with a Centennial mailing address in unincorporated Arapahoe County, and the neighbouring cities of Greenwood Village, Littleton, Englewood, Lone Tree and Aurora, get their permits elsewhere and are not in this file.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Centennial.
  • The value is the valuation declared on the permit, which sets the fee. Many over-the-counter home permits list none or a nominal figure, so values are a guide, not a cost.
  • Hailstorms drive roofing: a storm season can double a month's permits, so roofing counts swing from year to year.
  • The city's broad 'Misc' class (EV circuits, sewer repairs, furnace swaps, siding) is sorted into trades from the short work description; anything left is a remodel or repair.
  • Homes are permits the city files as residential. Multi-family buildings and commercial work count as other.
  • A final date is the date the permit was finaled. Right-of-way, temporary use and development permits are left out.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Electrical permits in the City of Centennial, CO", https://contractorrecords.com/centennial/electrical-permits, data through September 2026, from the City of Centennial Building Services building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Electrical permits by month · Electrical permits by calendar month (index) · Electrical permits: days to final · Electrical permits: declared value · Electrical permits by ZIP code · Electrical permits by permit type.

Common questions

  • How many electrical permits does Centennial issue a year?About 608 a year in the City of Centennial: 1,216 permits issued October 2024 through September 2026, 558 of them in the last 12 months.
  • How long does an electrical permit take in Centennial?The usual one took 18 days from issue to the city's final inspection, and the middle half took 7 to 47 days (514 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Centennial file the most electrical permits?October (132 against an average month of 100); November is the quietest (76). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most electrical permits in Centennial?80122, with 398 of the 1,216 (33%); then 80112 (302).