Data through July 2026 · updated 21 Oct 2026

240 new home permits were issued in unincorporated Benton County, August 2024 through July 2026: about 120 a year and 17% of all permits. 121 new home permits in the last 12 months on file (Aug 2025–Jul 2026), about the same as the 119 in the 12 months before. The busiest month is May. 99338 has the most, 3.

240permits issued
121last 12 months on file
Maybusiest month
84%finished
$306,000usual declared value
Jul 2026records through

New home permits by month

Permits issued each month, August 2024 through July 2026.

Aug 2024: 12Aug2024Sep 2024: 5Oct 2024: 10Nov 2024: 10Dec 2024: 7Jan 2025: 9Jan2025Feb 2025: 10Mar 2025: 11Apr 2025: 13May 2025: 15Jun 2025: 8Jul 2025: 9JulAug 2025: 11Sep 2025: 12Oct 2025: 14Nov 2025: 7Dec 2025: 8Jan 2026: 8Jan2026Feb 2026: 6Mar 2026: 8Apr 2026: 11May 2026: 13Jun 2026: 9Jul 2026: 14Jul
The same numbers as a table
MonthPermits
Aug 202412
Sep 20245
Oct 202410
Nov 202410
Dec 20247
Jan 20259
Feb 202510
Mar 202511
Apr 202513
May 202515
Jun 20258
Jul 20259
Aug 202511
Sep 202512
Oct 202514
Nov 20257
Dec 20258
Jan 20268
Feb 20266
Mar 20268
Apr 202611
May 202613
Jun 20269
Jul 202614

Download this table (CSV)

When new home permits are filed

By calendar month, 100 = an average month (the thin line). May is the busiest (140), December the quietest (75). A busy month at the permit counter usually means a longer wait for a contractor.

January: 85 (100 = an average month)February: 80 (100 = an average month)March: 95 (100 = an average month)April: 120 (100 = an average month)May: 140 (100 = an average month)140June: 85 (100 = an average month)July: 115 (100 = an average month)August: 115 (100 = an average month)September: 85 (100 = an average month)October: 120 (100 = an average month)November: 85 (100 = an average month)December: 75 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January85
February80
March95
April120
May140
June85
July115
August115
September85
October120
November85
December75

Download this table (CSV)

How many new home permits get finished

Permits issued Aug 2024–Jul 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Aug 2024–Jul 2025119
Finished84.0%

Download this table (CSV)

What a new home permit is declared at

The value written on the permit at application, from 239 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$306,000
Middle half$194,000–$418,000

Download this table (CSV)

ZIP codes with the most new home permits

Counted at the property's ZIP code. Share is the part of the county's 240 new home permits.

ZIP codePermitsShare
9933831%
993501under 1%
993201under 1%

Download this table (CSV)

The county's own permit types

How the county filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
SFD20083%
FAS3615%
SFD/ADU2under 1%
SFD-ADU2under 1%

Download this table (CSV)

Most active contractors by permits filed

The contractors named on the most new home permits in the Benton County building permit file, August 2024 through July 2026, with 5 or more each. Share is the part of all 240 new home permits; 60% of them name a contractor we can show. This is volume, not quality: more permits doesn't mean better work. Individuals' names, owner-builders and blanks are left out.

ContractorPermitsShare
Gillespie Homes104%
Landmark Homes83%
Lexar Homes of Tri-Cities52%

Download this table (CSV)

How Benton County compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

New home permits for other places in the Tri-Cities. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Benton County Building Permits (ArcGIS Online: Building_Permits_Assessor_VIew), read 21 Oct 2026. We count permits issued August 2024 through July 2026; denied and withdrawn permits are left out.

Building permits the Benton County Building Department issues for unincorporated land only: Finley, Plymouth, Paterson, Whitstran and the rural areas around Kennewick, Prosser, Benton City and West Richland. Kennewick, Richland, West Richland, Prosser and Benton City issue their own permits and are not in this file; a Kennewick or Prosser mailing address here belongs to land outside those cities. Electrical permits are issued by the Washington State Department of Labor & Industries, not the county, so there are none in this file.

  • The county's file names a contractor on about three in four recent permits; most of the rest are owner-builders. Older permits name one far less often.
  • The value is the job valuation the county records for its permit fee.
  • The window ends in July 2026: most permits applied for since then had no issue date yet when the file was pulled.
  • A completion date is filled on too few permits to time them, so we show which permits the county marks complete or closed but not how long they took.
  • Recent permits carry no parcel number, so the file can't be placed by ZIP code.
  • The county files its permits under short codes; SOB (small mechanical, plumbing and other jobs) and DRA (home remodels and additions) are split into kinds of work by their descriptions, and SFD and FAS (manufactured homes) count as new homes.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "New home permits in unincorporated Benton County, WA", https://contractorrecords.com/benton-county-wa/new-home-permits, data through July 2026, from Benton County Building Department building-permit records.

Link to a table: By month · Season · How many get finished · Declared value · By ZIP code · Permit types · Most active contractors by permits filed.

Download the tables (CSV): New homes permits by month · New homes permits by calendar month (index) · New homes permits: finished share · New homes permits: declared value · New homes permits by ZIP code · New homes permits by permit type · Most active contractors by permits filed.

Common questions

  • How many new home permits does Benton County issue a year?About 120 a year in unincorporated Benton County: 240 permits issued August 2024 through July 2026, 121 of them in the last 12 months on file (to July 2026).
  • When do people in Benton County file the most new home permits?May (140 against an average month of 100); December is the quietest (75). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most new home permits in Benton County?99338, with 3 of the 240 (1%); then 99350 (1).