Contractor Records
Home › Billings › Remodels & repairs

Remodel and repair permits in Billings, MT

Data through February 2026 · updated 20 Oct 2026

2,831 remodel and repair permits were issued in Billings, March 2024 through February 2026: about 1,416 a year and 46% of all permits. 1,589 remodel and repair permits in the last 12 months on file (Mar 2025–Feb 2026), 28% more than the 1,242 in the 12 months before. The busiest month is September. 59102 has the most, 969.

What this file covers: The city's public permit map layer appears to list only permits pulled by a licensed contractor, so permits homeowners pull themselves are missing, and it has added only a handful of permits a month since March 2026, when the city moved to a new permit portal.

2,831permits issued
1,589last 12 months on file
Sepbusiest month
Feb 2026records through

Remodel and repair permits by month

Permits issued each month, March 2024 through February 2026.

Mar 2024: 110Mar2024Apr 2024: 161May 2024: 136Jun 2024: 117Jul 2024: 148JulAug 2024: 109Sep 2024: 111Oct 2024: 142Nov 2024: 76Dec 2024: 63Jan 2025: 34Jan2025Feb 2025: 35Mar 2025: 73Apr 2025: 127May 2025: 113Jun 2025: 117Jul 2025: 94JulAug 2025: 177Sep 2025: 321Oct 2025: 241Nov 2025: 112Dec 2025: 50Jan 2026: 91Jan2026Feb 2026: 73
The same numbers as a table
MonthPermits
Mar 2024110
Apr 2024161
May 2024136
Jun 2024117
Jul 2024148
Aug 2024109
Sep 2024111
Oct 2024142
Nov 202476
Dec 202463
Jan 202534
Feb 202535
Mar 202573
Apr 2025127
May 2025113
Jun 2025117
Jul 202594
Aug 2025177
Sep 2025321
Oct 2025241
Nov 2025112
Dec 202550
Jan 202691
Feb 202673

Download this table (CSV)

When remodel and repair permits are filed

By calendar month, 100 = an average month (the thin line). September is the busiest (183), February the quietest (46). A busy month at the permit counter usually means a longer wait for a contractor.

January: 53 (100 = an average month)February: 46 (100 = an average month)March: 78 (100 = an average month)April: 122 (100 = an average month)May: 106 (100 = an average month)June: 99 (100 = an average month)July: 103 (100 = an average month)August: 121 (100 = an average month)September: 183 (100 = an average month)183October: 162 (100 = an average month)November: 80 (100 = an average month)December: 48 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January53
February46
March78
April122
May106
June99
July103
August121
September183
October162
November80
December48

Download this table (CSV)

ZIP codes with the most remodel and repair permits

Counted at the property's ZIP code. Share is the part of the city's 2,831 remodel and repair permits.

ZIP codePermitsShare
5910296934%
5910586431%
5910155820%
5910638714%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Building2,62793%
Remodel2037%
Exterior Remodel1under 1%

Download this table (CSV)

Most active contractors by permits filed

The contractors named on the most remodel and repair permits in the City of Billings permit map file, March 2024 through February 2026, with 5 or more each. Share is the part of all 2,831 remodel and repair permits; 99% of them name a contractor we can show. This is volume, not quality: more permits doesn't mean better work. Individuals' names, owner-builders and blanks are left out.

ContractorPermitsShare
Wegner Roofing & Solar Corporation34212%
Rocky MTN Window Distributors28410%
Sprague Construction Roofing Division1335%
Kirkness Exteriors1285%
Lynnrich Inc.1204%
NW Extreme Installers Inc1074%
Win-Dor Industries, Inc.873%
A-Team Roofing and Solar843%
C's Construction of Billings642%
Elevated Home Crafters Inc632%

Download this table (CSV)

How these numbers are made

Source: City of Billings GIS, BuildingPermits_CodeViolations_EXT map service, Permit Status layer, read 20 Oct 2026. We count permits issued March 2024 through February 2026; denied and withdrawn permits are left out. The layer's status stopped updating when the city moved to a new permit portal in spring 2026, and most permits read Expired with no final inspection date, so no finished share is shown.

Building, remodel, new home and commercial, mechanical, plumbing, electrical, solar, fire system and demolition permits the City of Billings Building Division issues inside city limits. Utility, right-of-way and tree permits in the same layer are not counted. Unincorporated Yellowstone County, Laurel and the other towns run their own permit offices and are not in this file.

  • The layer has added only a handful of permits a month since March 2026, when the city moved to its new CityView permit portal, so the counts end in February 2026, the last full month before the switch.
  • The layer has no declared job value and no final inspection date, and its status stopped updating at the switch, so we show no costs, no finished share and no time to final.
  • Residential exterior remodel permits cover roofs, siding, windows and fences together, and the file does not say which, so they are counted as remodels and repairs.
  • Where a permit lists more than one contractor (common on new buildings), it is counted for the one that is not a trade subcontractor, or for none when that isn't clear.
  • The layer cuts some older contractor names at 30 characters, so a few long names are shortened.
  • A house job can need separate building, mechanical, plumbing and electrical permits, so one project can count several times, once under each kind of work.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Remodel and repair permits in Billings, MT", https://contractorrecords.com/billings/remodel-permits, data through February 2026, from the City of Billings Building Division building-permit records.

Link to a table: By month · Season · By ZIP code · Permit types · Most active contractors by permits filed.

Download the tables (CSV): Remodels & repairs permits by month · Remodels & repairs permits by calendar month (index) · Remodels & repairs permits by ZIP code · Remodels & repairs permits by permit type · Most active contractors by permits filed.

Common questions

  • How many remodel and repair permits does Billings issue a year?About 1,416 a year in Billings: 2,831 permits issued March 2024 through February 2026, 1,589 of them in the last 12 months on file (to February 2026).
  • When do people in Billings file the most remodel and repair permits?September (183 against an average month of 100); February is the quietest (46). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most remodel and repair permits in Billings?59102, with 969 of the 2,831 (34%); then 59105 (864).