Data through February 2026 · updated 20 Oct 2026
799 HVAC permits were issued in Billings, March 2024 through February 2026: about 400 a year and 13% of all permits. 399 HVAC permits in the last 12 months on file (Mar 2025–Feb 2026), about the same as the 400 in the 12 months before. The busiest month is August. 59102 has the most, 363.
What this file covers: The city's public permit map layer appears to list only permits pulled by a licensed contractor, so permits homeowners pull themselves are missing, and it has added only a handful of permits a month since March 2026, when the city moved to a new permit portal.
Permits issued each month, March 2024 through February 2026.
| Month | Permits |
|---|---|
| Mar 2024 | 23 |
| Apr 2024 | 22 |
| May 2024 | 40 |
| Jun 2024 | 37 |
| Jul 2024 | 48 |
| Aug 2024 | 57 |
| Sep 2024 | 47 |
| Oct 2024 | 24 |
| Nov 2024 | 1 |
| Dec 2024 | 24 |
| Jan 2025 | 44 |
| Feb 2025 | 33 |
| Mar 2025 | 29 |
| Apr 2025 | 33 |
| May 2025 | 32 |
| Jun 2025 | 46 |
| Jul 2025 | 48 |
| Aug 2025 | 47 |
| Sep 2025 | 0 |
| Oct 2025 | 34 |
| Nov 2025 | 60 |
| Dec 2025 | 38 |
| Jan 2026 | 30 |
| Feb 2026 | 2 |
By calendar month, 100 = an average month (the thin line). August is the busiest (156), February the quietest (53). A busy month at the permit counter usually means a longer wait for a contractor.
| Month | Index |
|---|---|
| January | 111 |
| February | 53 |
| March | 78 |
| April | 83 |
| May | 108 |
| June | 125 |
| July | 144 |
| August | 156 |
| September | 71 |
| October | 87 |
| November | 92 |
| December | 93 |
Counted at the property's ZIP code. Share is the part of the city's 799 HVAC permits.
The contractors named on the most HVAC permits in the City of Billings permit map file, March 2024 through February 2026, with 5 or more each. Share is the part of all 799 HVAC permits; 100% of them name a contractor we can show. This is volume, not quality: more permits doesn't mean better work. Individuals' names, owner-builders and blanks are left out.
| Contractor | Permits | Share |
|---|---|---|
| White Heating & Air Conditioning | 752 | 94% |
| Empire Htg. & Cooling | 12 | 2% |
| Air Controls Billings Inc. | 8 | 1% |
Remodels & repairs (2,831)Solar (589)New homes (465)Plumbing (309)
Source: City of Billings GIS, BuildingPermits_CodeViolations_EXT map service, Permit Status layer, read 20 Oct 2026. We count permits issued March 2024 through February 2026; denied and withdrawn permits are left out. The layer's status stopped updating when the city moved to a new permit portal in spring 2026, and most permits read Expired with no final inspection date, so no finished share is shown.
Building, remodel, new home and commercial, mechanical, plumbing, electrical, solar, fire system and demolition permits the City of Billings Building Division issues inside city limits. Utility, right-of-way and tree permits in the same layer are not counted. Unincorporated Yellowstone County, Laurel and the other towns run their own permit offices and are not in this file.
Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →
Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:
Contractor Records, "HVAC permits in Billings, MT", https://contractorrecords.com/billings/hvac-permits, data through February 2026, from the City of Billings Building Division building-permit records.Link to a table: By month · Season · By ZIP code · Most active contractors by permits filed.
Download the tables (CSV): HVAC permits by month · HVAC permits by calendar month (index) · HVAC permits by ZIP code · Most active contractors by permits filed.