Solar permits in Billings, MT

Data through February 2026 · updated 20 Oct 2026

589 solar permits were issued in Billings, March 2024 through February 2026: about 294 a year and 10% of all permits. 260 solar permits in the last 12 months on file (Mar 2025–Feb 2026), 21% fewer than the 329 in the 12 months before. The busiest month is October. 59105 has the most, 226.

What this file covers: The city's public permit map layer appears to list only permits pulled by a licensed contractor, so permits homeowners pull themselves are missing, and it has added only a handful of permits a month since March 2026, when the city moved to a new permit portal.

589permits issued
260last 12 months on file
Octbusiest month
Feb 2026records through

Solar permits by month

Permits issued each month, March 2024 through February 2026.

Mar 2024: 0Mar2024Apr 2024: 4May 2024: 44Jun 2024: 24Jul 2024: 23JulAug 2024: 28Sep 2024: 45Oct 2024: 45Nov 2024: 35Dec 2024: 35Jan 2025: 31Jan2025Feb 2025: 15Mar 2025: 25Apr 2025: 21May 2025: 22Jun 2025: 28Jul 2025: 31JulAug 2025: 28Sep 2025: 26Oct 2025: 36Nov 2025: 21Dec 2025: 16Jan 2026: 4Jan2026Feb 2026: 2
The same numbers as a table
MonthPermits
Mar 20240
Apr 20244
May 202444
Jun 202424
Jul 202423
Aug 202428
Sep 202445
Oct 202445
Nov 202435
Dec 202435
Jan 202531
Feb 202515
Mar 202525
Apr 202521
May 202522
Jun 202528
Jul 202531
Aug 202528
Sep 202526
Oct 202536
Nov 202521
Dec 202516
Jan 20264
Feb 20262

Download this table (CSV)

When solar permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (165), February the quietest (35). A busy month at the permit counter usually means a longer wait for a contractor.

January: 71 (100 = an average month)February: 35 (100 = an average month)March: 51 (100 = an average month)April: 51 (100 = an average month)May: 134 (100 = an average month)June: 106 (100 = an average month)July: 110 (100 = an average month)August: 114 (100 = an average month)September: 145 (100 = an average month)October: 165 (100 = an average month)165November: 114 (100 = an average month)December: 104 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January71
February35
March51
April51
May134
June106
July110
August114
September145
October165
November114
December104

Download this table (CSV)

ZIP codes with the most solar permits

Counted at the property's ZIP code. Share is the part of the city's 589 solar permits.

ZIP codePermitsShare
5910522638%
5910220935%
591018815%
591066010%

Download this table (CSV)

Most active contractors by permits filed

The contractors named on the most solar permits in the City of Billings permit map file, March 2024 through February 2026, with 5 or more each. Share is the part of all 589 solar permits; 100% of them name a contractor we can show. This is volume, not quality: more permits doesn't mean better work. Individuals' names, owner-builders and blanks are left out.

ContractorPermitsShare
Yellowball Roofing & Solar LLC28949%
Wegner Roofing & Solar Corporation9716%
Big Dog Renewable Energy9516%
Bridger Renewables407%
Pure Light Power346%
A-Team Roofing and Solar275%

Download this table (CSV)

How these numbers are made

Source: City of Billings GIS, BuildingPermits_CodeViolations_EXT map service, Permit Status layer, read 20 Oct 2026. We count permits issued March 2024 through February 2026; denied and withdrawn permits are left out. The layer's status stopped updating when the city moved to a new permit portal in spring 2026, and most permits read Expired with no final inspection date, so no finished share is shown.

Building, remodel, new home and commercial, mechanical, plumbing, electrical, solar, fire system and demolition permits the City of Billings Building Division issues inside city limits. Utility, right-of-way and tree permits in the same layer are not counted. Unincorporated Yellowstone County, Laurel and the other towns run their own permit offices and are not in this file.

  • The layer has added only a handful of permits a month since March 2026, when the city moved to its new CityView permit portal, so the counts end in February 2026, the last full month before the switch.
  • The layer has no declared job value and no final inspection date, and its status stopped updating at the switch, so we show no costs, no finished share and no time to final.
  • Residential exterior remodel permits cover roofs, siding, windows and fences together, and the file does not say which, so they are counted as remodels and repairs.
  • Where a permit lists more than one contractor (common on new buildings), it is counted for the one that is not a trade subcontractor, or for none when that isn't clear.
  • The layer cuts some older contractor names at 30 characters, so a few long names are shortened.
  • A house job can need separate building, mechanical, plumbing and electrical permits, so one project can count several times, once under each kind of work.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Solar permits in Billings, MT", https://contractorrecords.com/billings/solar-permits, data through February 2026, from the City of Billings Building Division building-permit records.

Link to a table: By month · Season · By ZIP code · Most active contractors by permits filed.

Download the tables (CSV): Solar permits by month · Solar permits by calendar month (index) · Solar permits by ZIP code · Most active contractors by permits filed.

Common questions

  • How many solar permits does Billings issue a year?About 294 a year in Billings: 589 permits issued March 2024 through February 2026, 260 of them in the last 12 months on file (to February 2026).
  • When do people in Billings file the most solar permits?October (165 against an average month of 100); February is the quietest (35). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most solar permits in Billings?59105, with 226 of the 589 (38%); then 59102 (209).