How much does a fireplace & stove job cost in Bismarck? The usual fireplace & stove job filed with Bismarck is $4,000, from 283 priced permits (October 2023 through September 2026). A filed value is what the contractor wrote on the permit, not a quote or the final bill.
The usual fireplace & stove job filed with Bismarck is $4,000, from 283 priced permits, October 2023 through September 2026. Half of jobs were filed for less, half for more. A filed value is what the contractor wrote on the permit, not a quote or the final bill. A fireplace & stove permit here usually takes 146 days from issue to final inspection. How long permits take →
Approximately, from each firm's own spread: every firm's range of filed values, weighted by its 283 priced permits across 10 firms, pooled into one. Half of Bismarck fireplace & stove permits were filed between $2,500 and $5,500.
| Percentile | Filed value | Reads as |
|---|---|---|
| 10th | $2,500 | 1 in 10 permits filed below |
| 25th | $2,500 | 1 in 4 filed below |
| 50th | $3,400 | the middle permit |
| 75th | $5,500 | 1 in 4 filed above |
| 90th | $9,400 | 1 in 10 filed above |
Top 5 by permits in the last 12 months. Usual is each firm's middle filed value; middle half is the range its middle half of jobs were filed in; both are shown for firms with 5 or more priced permits. Busy is not the same as careful: pick what you value to build a list.
| Firm | Permits | Last 12 mo | Usual | Middle half | Finished |
|---|---|---|---|---|---|
| Keller Hearth'n Home Products | 169 | 63 | $3,000 | $2,500–$4,000 | 73.8% |
| Hebron Brick Supply Co. | 67 | 20 | $7,000 | $4,950–$8,677 | 83.1% |
| J.E. Homes, LLC | 30 | 11 | $2,500 | $2,500 | 87.1% |
| Cold Spring Granite Company | 11 | 8 | $9,800 | $6,650–$12,000 | — |
| Thomas Built & Consulting LLC | 1 | 1 | — | — | — |
Line your quote up against the file. In Bismarck, 1 in 10 fireplace & stove filed values sit under $2,500, the middle half between $2,500 and $5,500, and 1 in 10 over $9,400.
Bismarck files the fewest fireplace & stove permits in August (64 against an average month of 100) and the most in October (127). If you can choose, ask for quotes in a quiet month. We have no prices by month, so this is about crews' schedules, not a discount. When each trade is busiest in Bismarck →
Source: City of Bismarck TRAKiT building, mechanical, electrical and plumbing permits on homes. The window is October 2023 through September 2026; a permit filed after that isn't here yet.
Usual is the middle permit: half were filed for less, half for more. Only permits with a filed value count; a value of $0 or none is left out.
The spread is approximate: we keep seven points of each firm's own range of filed values, not every permit, and pool them.
Nobody paid to be on this page and nobody can. How the records work in Bismarck →
Fireplace & Stove cost in other cities: Saint Paul
Other job costs in Bismarck: Furnace & AC Replacement · Plumbing · HVAC Install · New Home · Remodel & Addition · Deck