Contractor Records
Home › Chattanooga

Chattanooga, TN building permits

Data through September 2026 · updated 18 Oct 2026

13,353 building permits were issued in Chattanooga from October 2024 to September 2026, about 6,676 a year. Plumbing permits lead with 4,073, then electrical (3,522) and HVAC (2,483). 100% were for homes. The city's file names contractors, but only on about seven in ten of these permits, and we have not matched the names to state license records, so we only count permits per firm and don't rate or rank them: these pages show what was built, where, when and how fast the city signed it off.

13,353permits issued
6,676a year
100%for homes
50%finished (Oct 2024–Sep 2025 permits)
92days, usual issue to final
Sep 2026records through

What gets built here

What this page can and can't show

  • ✓Permits the city issued, by kind of work, month and ZIP code.
  • ✓How long a permit takes from issue to the city's final inspection.
  • ✓Which permits finished or are still open.
  • ✓Which contractors filed the most permits (volume, not quality).
  • Who does good work. The city's file names contractors, but only on about seven in ten of these permits, and we have not matched the names to state license records, so we only count permits per firm and don't rate or rank them.
  • What the job cost. The file carries no job value.
  • Street addresses or owners. We publish counts and permit rows without them.

Residential permits the City of Chattanooga Land Development Office issues inside the city: building, repair and replace, modification and demolition permits for homes, and electrical, plumbing, mechanical and gas permits the city marks residential. Commercial, industrial and institutional permits, street cuts, land disturbing, low voltage permits and certificates of occupancy in the same file are not counted. Unincorporated Hamilton County, East Ridge, Red Bank, Signal Mountain and the other towns run their own permit offices and are not in this file.

Permits by kind of work

Permits issued October 2024 through September 2026, every kind of work with 100 or more. Last 12 months is Oct 2025–Sep 2026. Homes is the share issued as residential permits.

Kind of workPermitsShareLast 12 mo
Plumbing4,07331%2,117
Electrical3,52226%1,834
HVAC2,48319%1,375
New homes1,31610%662
Remodels & repairs1,0828%521
Demolition2852%110
Additions2802%135
Garages, sheds & shade structures1851%80

Fewer than 100 permits, so no row: fences & walls (68), pools & spas (44), solar (15).

Download this table (CSV)

Most active contractors by permits filed

The contractors named on the most permits in the City of Chattanooga Hub (ChattaData) file, October 2024 through September 2026, with 5 or more each. Share is the part of all 13,353 permits; 67% of them name a contractor we can show. This is volume, not quality: more permits doesn't mean better work. Individuals' names, owner-builders and blanks are left out.

ContractorPermitsShare
MC Plumbing LLC4083%
Inner City Electrical Heating and Air Co LLC3743%
One Hour Heating and Air Conditioning2152%
Champion Mechanical, LLC1951%
Romanoff Plumbing1951%
Romanoff HVAC1851%
Mainline1801%
Airsystems Unlimited, LLC1701%
Strada Services LLC1671%
Legacy Electric1341%

Download this table (CSV)

Guides for Chattanooga

Local permit rules and lookups, each with Chattanooga's own permit numbers.

How these numbers are made

Source: City of Chattanooga Hub (ChattaData), All Permits (nightly CSV extract, ArcGIS item 9937e99e93de467eae5f592061c2672c), read 18 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Residential permits the City of Chattanooga Land Development Office issues inside the city: building, repair and replace, modification and demolition permits for homes, and electrical, plumbing, mechanical and gas permits the city marks residential. Commercial, industrial and institutional permits, street cuts, land disturbing, low voltage permits and certificates of occupancy in the same file are not counted. Unincorporated Hamilton County, East Ridge, Red Bank, Signal Mountain and the other towns run their own permit offices and are not in this file.

  • The file names a contractor company on about seven in ten of the permits counted here, and on none before 2020. The contractor table counts permits filed per firm among those; it does not rate, rank or compare their work.
  • The file has a declared cost on only a few commercial permits, so we show no costs.
  • The file's completion date is empty. A final date here is the date the city last changed the permit's status, on permits whose status is Complete. A permit with any other status (Active or Stopped) counts as open; the file has no expired status.
  • In mid-2025 the city renamed several permit types (for example 'Residential Building Permit Old' and 'Residential Modification Permit' became 'Residential Building Permit' and 'Residential Repair Replace'); both names are counted the same way.
  • A new house gets separate building, electrical, plumbing, mechanical and gas permits, so one project can count several times, once under each kind of work.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Chattanooga, TN building permits", https://contractorrecords.com/chattanooga/, data through September 2026, from the City of Chattanooga Land Development Office building-permit records.

Link to a table: By kind of work · Most active contractors by permits filed · Browse the permits · Permits each month.

Download the tables (CSV): Permits by kind of work · Most active contractors by permits filed · Permits in the last 12 months.

Common questions

  • How many building permits does Chattanooga issue a year?About 6,676 a year in Chattanooga: 13,353 permits issued October 2024 through September 2026, 6,931 of them in the last 12 months. That counts the permits the city issued, all for homes, not denied or withdrawn applications.
  • Can I find a contractor's permits in Chattanooga?The city's file names contractors, but only on about seven in ten of these permits, and we have not matched the names to state license records, so we only count permits per firm and don't rate or rank them. The table above lists the contractors named on the most permits, as a count only. Ask the contractor for the permit number of a past job.
  • What do people build most in Chattanooga?Plumbing: 4,073 of the 13,353 permits (31%), then electrical (3,522), HVAC (2,483), October 2024 through September 2026.
  • How long does a building permit take in Chattanooga?The usual permit took 92 days from issue to the city's final (middle half: 46 to 129 days), from 3,213 permits issued Oct 2024–Sep 2025 that reached a final. Each kind of work →
  • How do I look up a building permit in Chattanooga?Filter the permit list on this page by month, kind of work and ZIP code to see what was issued. For one property's permits, search the city's own records by address or permit number; we don't publish addresses. How to look up a permit in Chattanooga →
  • How many permits were issued in Chattanooga last month?651 in September 2026, the last full month on file; 6,931 over the last 12 months.

Browse the permits

Browse 13,353 permits

Every permit in the file issued October 2024 through September 2026, newest first. Pick a month, a kind of work, a ZIP code or a status. Each row is one permit: no street address, no names.

The list loads as you reach it (13,353 permits).

IssuedKind of workCity permit typeStatusZIP

Permits each month, the last 12 months

Permits issued each month and the kind of work with the most. A month opens its permits in the list above.

MonthPermitsTop kind of work
Sep 2026651Plumbing (202)
Aug 2026688Plumbing (195)
Jul 2026635Plumbing (185)
Jun 2026658Plumbing (197)
May 2026503Plumbing (164)
Apr 2026572Plumbing (159)
Mar 2026599Plumbing (208)
Feb 2026552Plumbing (183)
Jan 2026580Plumbing (153)
Dec 2025468Plumbing (133)
Nov 2025388Electrical (112)
Oct 2025637Plumbing (229)

Download this table (CSV)