Contractor Records
Home › College Station › Remodels & repairs

Remodel and repair permits in the City of College Station, TX

Data through September 2026 · updated 19 Oct 2026

246 remodel and repair permits were issued in the City of College Station, October 2024 through September 2026: about 123 a year and 2% of all permits. 119 remodel and repair permits in the last 12 months (Oct 2025–Sep 2026), 6% fewer than the 127 in the 12 months before. The busiest month is October. 77845 has the most, 173.

246permits issued
119last 12 months
Octbusiest month
65%finished
$20,000usual declared value
Sep 2026records through

Remodel and repair permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 12Oct2024Nov 2024: 8Dec 2024: 6Jan 2025: 10Jan2025Feb 2025: 9Mar 2025: 7Apr 2025: 10May 2025: 15Jun 2025: 15Jul 2025: 11JulAug 2025: 13Sep 2025: 11Oct 2025: 16Nov 2025: 12Dec 2025: 5Jan 2026: 15Jan2026Feb 2026: 9Mar 2026: 14Apr 2026: 8May 2026: 6Jun 2026: 12Jul 2026: 9JulAug 2026: 8Sep 2026: 5
The same numbers as a table
MonthPermits
Oct 202412
Nov 20248
Dec 20246
Jan 202510
Feb 20259
Mar 20257
Apr 202510
May 202515
Jun 202515
Jul 202511
Aug 202513
Sep 202511
Oct 202516
Nov 202512
Dec 20255
Jan 202615
Feb 20269
Mar 202614
Apr 20268
May 20266
Jun 202612
Jul 20269
Aug 20268
Sep 20265

Download this table (CSV)

When remodel and repair permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (137), December the quietest (54). A busy month at the permit counter usually means a longer wait for a contractor.

January: 122 (100 = an average month)February: 88 (100 = an average month)March: 102 (100 = an average month)April: 88 (100 = an average month)May: 102 (100 = an average month)June: 132 (100 = an average month)July: 98 (100 = an average month)August: 102 (100 = an average month)September: 78 (100 = an average month)October: 137 (100 = an average month)137November: 98 (100 = an average month)December: 54 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January122
February88
March102
April88
May102
June132
July98
August102
September78
October137
November98
December54

Download this table (CSV)

How many remodel and repair permits get finished

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Oct 2024–Sep 2025127
Finished64.6%
Expired0.0%

Download this table (CSV)

What a remodel and repair permit is declared at

The value written on the permit at application, from 148 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$20,000
Middle half$12,000–$50,000

Download this table (CSV)

ZIP codes with the most remodel and repair permits

Counted at the property's ZIP code. Share is the part of the city's 246 remodel and repair permits.

ZIP codePermitsShare
7784517370%
778407330%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Window Replacement - Single-Family11246%
Remodel / Renovation - Single-Family7430%
Foundation Repair - Single-Family5824%
Foundation Repair - Duplex1under 1%
Remodel / Renovation - Duplex1under 1%

Download this table (CSV)

How College Station compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of College Station Open Data, Permits - Master Dataset (hrbn-znt6), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building and trade permits the City of College Station issues inside the city limits. Bryan, unincorporated Brazos County and Texas A&M University buildings on state land are not in this file. Event, vendor, short-term rental and inspection-only records are left out.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for College Station.
  • The file has a current status but no final date, so we can say how many permits finished but not how long they took.
  • The city seldom marks a permit expired: a permit that never got its final inspection usually still reads Issued, so it counts as open here.
  • Finished means the file shows Finaled, Complete, Closed or a certificate of occupancy or completion issued.
  • Plumbing, gas, mechanical and most electrical permits don't say whether the building is a home, so the homes share counts only permits whose type names a single-family home, duplex or townhome.
  • Value is the valuation declared on the permit and is filled on about half the permits, mostly building permits; trade permits usually carry none.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Remodel and repair permits in the City of College Station, TX", https://contractorrecords.com/college-station/remodel-permits, data through September 2026, from the City of College Station Planning & Development Services building-permit records.

Link to a table: By month · Season · How many get finished · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Remodels & repairs permits by month · Remodels & repairs permits by calendar month (index) · Remodels & repairs permits: finished share · Remodels & repairs permits: declared value · Remodels & repairs permits by ZIP code · Remodels & repairs permits by permit type.

Common questions

  • How many remodel and repair permits does College Station issue a year?About 123 a year in the City of College Station: 246 permits issued October 2024 through September 2026, 119 of them in the last 12 months.
  • When do people in College Station file the most remodel and repair permits?October (137 against an average month of 100); December is the quietest (54). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most remodel and repair permits in College Station?77845, with 173 of the 246 (70%); then 77840 (73).