Roofing permits in the City of College Station, TX

Data through September 2026 · updated 19 Oct 2026

1,301 roofing permits were issued in the City of College Station, October 2024 through September 2026: about 650 a year and 13% of all permits. 370 roofing permits in the last 12 months (Oct 2025–Sep 2026), 60% fewer than the 931 in the 12 months before. The busiest month is May. 77840 has the most, 724.

1,301permits issued
370last 12 months
Maybusiest month
50%finished
$14,000usual declared value
Sep 2026records through

Roofing permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 10Oct2024Nov 2024: 9Dec 2024: 6Jan 2025: 6Jan2025Feb 2025: 5Mar 2025: 22Apr 2025: 218May 2025: 240Jun 2025: 188Jul 2025: 89JulAug 2025: 63Sep 2025: 75Oct 2025: 83Nov 2025: 38Dec 2025: 23Jan 2026: 19Jan2026Feb 2026: 60Mar 2026: 33Apr 2026: 30May 2026: 22Jun 2026: 16Jul 2026: 21JulAug 2026: 13Sep 2026: 12
The same numbers as a table
MonthPermits
Oct 202410
Nov 20249
Dec 20246
Jan 20256
Feb 20255
Mar 202522
Apr 2025218
May 2025240
Jun 2025188
Jul 202589
Aug 202563
Sep 202575
Oct 202583
Nov 202538
Dec 202523
Jan 202619
Feb 202660
Mar 202633
Apr 202630
May 202622
Jun 202616
Jul 202621
Aug 202613
Sep 202612

Download this table (CSV)

When roofing permits are filed

By calendar month, 100 = an average month (the thin line). May is the busiest (242), January the quietest (23). A busy month at the permit counter usually means a longer wait for a contractor.

January: 23 (100 = an average month)February: 60 (100 = an average month)March: 51 (100 = an average month)April: 229 (100 = an average month)May: 242 (100 = an average month)242June: 188 (100 = an average month)July: 101 (100 = an average month)August: 70 (100 = an average month)September: 80 (100 = an average month)October: 86 (100 = an average month)November: 43 (100 = an average month)December: 27 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January23
February60
March51
April229
May242
June188
July101
August70
September80
October86
November43
December27

Download this table (CSV)

How many roofing permits get finished

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Oct 2024–Sep 2025931
Finished49.6%
Expired0.0%

Download this table (CSV)

What a roofing permit is declared at

The value written on the permit at application, from 1,281 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$14,000
Middle half$8,700–$21,690

Download this table (CSV)

ZIP codes with the most roofing permits

Counted at the property's ZIP code. Share is the part of the city's 1,301 roofing permits.

ZIP codePermitsShare
7784072456%
7784557744%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Reroof - Single-Family / Duplex1,06882%
Reroof - Commercial / Multi-Family23118%
Reroof - Single-Family2under 1%

Download this table (CSV)

How College Station compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of College Station Open Data, Permits - Master Dataset (hrbn-znt6), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building and trade permits the City of College Station issues inside the city limits. Bryan, unincorporated Brazos County and Texas A&M University buildings on state land are not in this file. Event, vendor, short-term rental and inspection-only records are left out.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for College Station.
  • The file has a current status but no final date, so we can say how many permits finished but not how long they took.
  • The city seldom marks a permit expired: a permit that never got its final inspection usually still reads Issued, so it counts as open here.
  • Finished means the file shows Finaled, Complete, Closed or a certificate of occupancy or completion issued.
  • Plumbing, gas, mechanical and most electrical permits don't say whether the building is a home, so the homes share counts only permits whose type names a single-family home, duplex or townhome.
  • Value is the valuation declared on the permit and is filled on about half the permits, mostly building permits; trade permits usually carry none.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Roofing permits in the City of College Station, TX", https://contractorrecords.com/college-station/roofing-permits, data through September 2026, from the City of College Station Planning & Development Services building-permit records.

Link to a table: By month · Season · How many get finished · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Roofing permits by month · Roofing permits by calendar month (index) · Roofing permits: finished share · Roofing permits: declared value · Roofing permits by ZIP code · Roofing permits by permit type.

Common questions

  • How many roofing permits does College Station issue a year?About 650 a year in the City of College Station: 1,301 permits issued October 2024 through September 2026, 370 of them in the last 12 months.
  • When do people in College Station file the most roofing permits?May (242 against an average month of 100); January is the quietest (23). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most roofing permits in College Station?77840, with 724 of the 1,301 (56%); then 77845 (577).