Data through December 2024 · updated 23 Oct 2026

300 garage, shed and shade structure permits were issued in unincorporated Deschutes County, Sisters and La Pine, January 2023 through December 2024: about 150 a year and 22% of all permits. 216 garage, shed and shade structure permits in the last 12 months on file (Jan 2024–Dec 2024), 157% more than the 84 in the 12 months before. The busiest month is October. The usual one took 375 days from issue to the county's final.

What this file covers: This is the Assessor's copy of the permits that change a property's value: new homes and manufactured homes, additions, garages, shops and barns, remodels and demolitions. Electrical, plumbing and mechanical permits are not in it, and it holds no permits issued after December 2024.

300permits issued
216last 12 months on file
Octbusiest month
375days, usual issue to final
$63,289usual declared value
Dec 2024records through

Garage, shed and shade structure permits by month

Permits issued each month, January 2023 through December 2024.

Jan 2023: 0Jan2023Feb 2023: 2Mar 2023: 7Apr 2023: 7May 2023: 7Jun 2023: 6Jul 2023: 7JulAug 2023: 7Sep 2023: 3Oct 2023: 16Nov 2023: 14Dec 2023: 8Jan 2024: 17Jan2024Feb 2024: 11Mar 2024: 20Apr 2024: 14May 2024: 22Jun 2024: 16Jul 2024: 19JulAug 2024: 17Sep 2024: 17Oct 2024: 20Nov 2024: 20Dec 2024: 23
The same numbers as a table
MonthPermits
Jan 20230
Feb 20232
Mar 20237
Apr 20237
May 20237
Jun 20236
Jul 20237
Aug 20237
Sep 20233
Oct 202316
Nov 202314
Dec 20238
Jan 202417
Feb 202411
Mar 202420
Apr 202414
May 202422
Jun 202416
Jul 202419
Aug 202417
Sep 202417
Oct 202420
Nov 202420
Dec 202423

Download this table (CSV)

When garage, shed and shade structure permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (144), February the quietest (52). A busy month at the permit counter usually means a longer wait for a contractor.

January: 68 (100 = an average month)February: 52 (100 = an average month)March: 108 (100 = an average month)April: 84 (100 = an average month)May: 116 (100 = an average month)June: 88 (100 = an average month)July: 104 (100 = an average month)August: 96 (100 = an average month)September: 80 (100 = an average month)October: 144 (100 = an average month)144November: 136 (100 = an average month)December: 124 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January68
February52
March108
April84
May116
June88
July104
August96
September80
October144
November136
December124

Download this table (CSV)

How long a garage, shed and shade structure permit takes

Permits issued Jan 2023–Dec 2023, at least 12 months before the file ends. Usual days is the middle permit among the 50 with a final date.

MeasureValue
Permits issued Jan 2023–Dec 202384
Usual days, issue to final375
Middle half, days252–463

Download this table (CSV)

What a garage, shed and shade structure permit is declared at

The value written on the permit at application, from 298 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$63,289
Middle half$39,888–$120,000

Download this table (CSV)

The county's own permit types

How the county filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Structural27391%
Dwelling279%

Download this table (CSV)

Other kinds of work here

Nearby permit data

Garage, shed and shade structure permits for other places in Central Oregon. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Deschutes County Assessor, Assessor_Permits map service (Master Permits and MasterPermits 2021 to 2024 layers), read 23 Oct 2026. We count permits issued January 2023 through December 2024; denied and withdrawn permits are left out.

Building permits Deschutes County Community Development issues (its own 247- permit numbers), for unincorporated Deschutes County and for the cities of Sisters and La Pine, where the county runs the building programme. Bend and Redmond run their own permit offices: their permits are in the same Assessor file but are not counted here.

  • The file is the county Assessor's appraisal copy of building permits, not the permit office's full record: trade permits are left out and it stops at December 2024, so the counts run from January 2023 to December 2024.
  • The file names no contractor and carries no ZIP code, so there are no contractor lists or ZIP code pages for this county.
  • The value is the job value the Assessor's copy records for the permit, not the final cost.
  • A final date is the date the permit's status turned Finaled or Closed in the Assessor's copy; statuses are as of the Assessor's last update and may lag the permit office.
  • Kinds of work come from the permit's work description, since the file has no permit type beyond structural, dwelling, manufactured dwelling, agricultural and demolition.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Garage, shed and shade structure permits in unincorporated Deschutes County, Sisters and La Pine, OR", https://contractorrecords.com/deschutes-county/accessory-permits, data through December 2024, from Deschutes County Community Development building-permit records.

Link to a table: By month · Season · Days to final · Declared value · Permit types.

Download the tables (CSV): Garages, sheds & shade structures permits by month · Garages, sheds & shade structures permits by calendar month (index) · Garages, sheds & shade structures permits: days to final · Garages, sheds & shade structures permits: declared value · Garages, sheds & shade structures permits by permit type.

Common questions

  • How many garage, shed and shade structure permits does Deschutes County issue a year?About 150 a year in unincorporated Deschutes County, Sisters and La Pine: 300 permits issued January 2023 through December 2024, 216 of them in the last 12 months on file (to December 2024).
  • How long does a garage, shed and shade structure permit take in Deschutes County?The usual one took 375 days from issue to the county's final inspection, and the middle half took 252 to 463 days (50 permits issued Jan 2023–Dec 2023 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Deschutes County file the most garage, shed and shade structure permits?October (144 against an average month of 100); February is the quietest (52). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.