New home permits in unincorporated Deschutes County, Sisters and La Pine, OR

Data through December 2024 · updated 23 Oct 2026

488 new home permits were issued in unincorporated Deschutes County, Sisters and La Pine, January 2023 through December 2024: about 244 a year and 36% of all permits. 299 new home permits in the last 12 months on file (Jan 2024–Dec 2024), 58% more than the 189 in the 12 months before. The busiest month is October. The usual one took 408 days from issue to the county's final.

What this file covers: This is the Assessor's copy of the permits that change a property's value: new homes and manufactured homes, additions, garages, shops and barns, remodels and demolitions. Electrical, plumbing and mechanical permits are not in it, and it holds no permits issued after December 2024.

488permits issued
299last 12 months on file
Octbusiest month
408days, usual issue to final
68%finished
$410,000usual declared value
Dec 2024records through

New home permits by month

Permits issued each month, January 2023 through December 2024.

Jan 2023: 3Jan2023Feb 2023: 3Mar 2023: 12Apr 2023: 12May 2023: 18Jun 2023: 17Jul 2023: 18JulAug 2023: 24Sep 2023: 18Oct 2023: 23Nov 2023: 21Dec 2023: 20Jan 2024: 24Jan2024Feb 2024: 21Mar 2024: 31Apr 2024: 24May 2024: 33Jun 2024: 24Jul 2024: 36JulAug 2024: 26Sep 2024: 17Oct 2024: 34Nov 2024: 15Dec 2024: 14
The same numbers as a table
MonthPermits
Jan 20233
Feb 20233
Mar 202312
Apr 202312
May 202318
Jun 202317
Jul 202318
Aug 202324
Sep 202318
Oct 202323
Nov 202321
Dec 202320
Jan 202424
Feb 202421
Mar 202431
Apr 202424
May 202433
Jun 202424
Jul 202436
Aug 202426
Sep 202417
Oct 202434
Nov 202415
Dec 202414

Download this table (CSV)

When new home permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (140), February the quietest (59). A busy month at the permit counter usually means a longer wait for a contractor.

January: 66 (100 = an average month)February: 59 (100 = an average month)March: 106 (100 = an average month)April: 89 (100 = an average month)May: 125 (100 = an average month)June: 101 (100 = an average month)July: 133 (100 = an average month)August: 123 (100 = an average month)September: 86 (100 = an average month)October: 140 (100 = an average month)140November: 89 (100 = an average month)December: 84 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January66
February59
March106
April89
May125
June101
July133
August123
September86
October140
November89
December84

Download this table (CSV)

How long a new home permit takes

Permits issued Jan 2023–Dec 2023, at least 12 months before the file ends. Usual days is the middle permit among the 129 with a final date.

MeasureValue
Permits issued Jan 2023–Dec 2023189
Finished68.3%
Expired9.0%
Usual days, issue to final408
Middle half, days280–521

Download this table (CSV)

What a new home permit is declared at

The value written on the permit at application, from 484 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$410,000
Middle half$267,792–$653,000

Download this table (CSV)

The county's own permit types

How the county filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Dwelling41886%
Structural388%
Manufactured Dwelling327%

Download this table (CSV)

How Deschutes County compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

New home permits for other places in Central Oregon. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Deschutes County Assessor, Assessor_Permits map service (Master Permits and MasterPermits 2021 to 2024 layers), read 23 Oct 2026. We count permits issued January 2023 through December 2024; denied and withdrawn permits are left out.

Building permits Deschutes County Community Development issues (its own 247- permit numbers), for unincorporated Deschutes County and for the cities of Sisters and La Pine, where the county runs the building programme. Bend and Redmond run their own permit offices: their permits are in the same Assessor file but are not counted here.

  • The file is the county Assessor's appraisal copy of building permits, not the permit office's full record: trade permits are left out and it stops at December 2024, so the counts run from January 2023 to December 2024.
  • The file names no contractor and carries no ZIP code, so there are no contractor lists or ZIP code pages for this county.
  • The value is the job value the Assessor's copy records for the permit, not the final cost.
  • A final date is the date the permit's status turned Finaled or Closed in the Assessor's copy; statuses are as of the Assessor's last update and may lag the permit office.
  • Kinds of work come from the permit's work description, since the file has no permit type beyond structural, dwelling, manufactured dwelling, agricultural and demolition.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "New home permits in unincorporated Deschutes County, Sisters and La Pine, OR", https://contractorrecords.com/deschutes-county/new-home-permits, data through December 2024, from Deschutes County Community Development building-permit records.

Link to a table: By month · Season · Days to final · Declared value · Permit types.

Download the tables (CSV): New homes permits by month · New homes permits by calendar month (index) · New homes permits: days to final · New homes permits: declared value · New homes permits by permit type.

Common questions

  • How many new home permits does Deschutes County issue a year?About 244 a year in unincorporated Deschutes County, Sisters and La Pine: 488 permits issued January 2023 through December 2024, 299 of them in the last 12 months on file (to December 2024).
  • How long does a new home permit take in Deschutes County?The usual one took 408 days from issue to the county's final inspection, and the middle half took 280 to 521 days (129 permits issued Jan 2023–Dec 2023 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Deschutes County file the most new home permits?October (140 against an average month of 100); February is the quietest (59). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.