Contractor Records
Home › Guides › Deschutes County building permit search: ePermitting, DIAL and old permit files

Deschutes County building permit search: ePermitting, DIAL and old permit files

To look up a building permit in unincorporated Deschutes County, Sisters or La Pine, use Oregon ePermitting, the State of Oregon system the county's research page points to, or the county's property tool DIAL. The county's Property & Permit Research page says ePermitting can be searched by "Permit / Application Number," "Date Range of Submitted Applications," "Site Address," and "Taxlot Numbers", and that DIAL's Development tab shows "permit history, and historical CDD records" (read 24 October 2026). In the Assessor's copy of the county's permits, 1,345 building permits were issued from January 2023 to December 2024.

By Contractor Records · data through December 31, 2024

Which addresses this covers

Deschutes County Community Development runs the building programme for unincorporated land and the cities of Sisters and La Pine. Bend and Redmond run their own permit offices; for a Bend address see Bend building permit search and our Bend pages.

Tool Search by What it shows
Oregon ePermitting Street number and name, parcel, license number and type, permit number, dates Permits processed through the State system, with status and inspections
DIAL Address, owner name, tax account Zoning, permit history and Community Development documents for one property
Permit Query (on the research page) Filters Current active building and land use permits, downloadable
DevDocs Map/taxlot, file number, keywords Scanned planning, building and code enforcement documents back to 1970

How to look up the permits on a Deschutes County address

  1. Open DIAL and search the address or tax account.
  2. Click the Development tab on the left to see the property's permit history. The county says DIAL can lag current information by up to about a week.
  3. For a permit's status and inspections, open the ePermitting building search and enter just the exact street number and the first few letters of the street name, as the search page advises.
  4. Check the jurisdiction on each result: the county warns that broad searches "may return results from jurisdictions outside of Deschutes County". County permit numbers start with 247-.
  5. For plans and older paperwork, use DIAL's Development - Documents menu or search DevDocs by the taxlot number.

What the statuses mean

The Assessor's copy of county permits carries these statuses. This is how our pages count them:

Status in the Assessor's copy What it means How we count it
Finaled, Closed Final inspection passed, permit closed Finished
Permit Issued, Insp Pending, Insp Scheduled, Approved, Partial Permit active, inspections under way Open
Expired Lapsed before a final Expired
Void, Withdrawn, Cancelled, Denied Never went ahead Left out

Of the permits issued in 2023, 59.7% had finished, 21.9% were still open and 18.4% had expired in the Assessor's copy (read 23 October 2026). Statuses there are as of the Assessor's last update and can lag the permit office, so check ePermitting before acting on one.

When the record is not online

The county's DevDocs page says you can search by "a Map / Taxlot number (Ex: "171232AD01400" - alphanumeric, no spaces), a File Number, or use the Description box", that "County documents dating back to 1970 are available", and that new documents are scanned and uploaded daily (read 24 October 2026). For anything not there, ask Community Development at the Deschutes Services Building, 1300 NW Wall St., Bend.

What our Deschutes County pages add

The portals answer "what was permitted at this address". Our Deschutes County page answers "what gets built here, and how long the county takes to sign it off", from the Assessor's copy of permits issued January 2023 to December 2024:

Kind of work Permits (Jan 2023–Dec 2024) Share
New homes 488 36%
Garages, sheds and shade structures 300 22%
Additions 176 13%
Remodels and repairs 172 13%

90% of the 1,345 permits were on homes. The usual permit issued in 2023 took 382 days to reach a final and a new home 408 days; 68.3% of the new-home permits issued in 2023 had finished. See how long a permit takes. The permit statistics page breaks the file down by year and month, and browse permits lists the rows without owner names or addresses. To check a contractor's CCB license, use How to check a contractor's license in Oregon.

What this does not tell you

The Assessor's copy holds only the permits that change a property's value: new and manufactured homes, additions, garages, shops and barns, remodels and demolitions. Electrical, plumbing and mechanical permits are not in it, it stops at December 2024, and it names no contractor and no ZIP code. A finished permit means the county closed it, not what the work cost or whether you were happy with it.

How we know this

Search options were read on the county's Property & Permit Research and DevDocs pages and on the Oregon ePermitting building search, all on 24 October 2026. Our counts are the Deschutes County Assessor's Assessor_Permits map service, read 23 October 2026: county-issued (247-) building permits issued January 2023 to December 2024, for unincorporated Deschutes County, Sisters and La Pine.

Numbers come from public permit records in 57 cities, data through December 31, 2024. Nobody paid to be on this page and nobody can.

Questions

  • How do I find out if a permit was pulled on my house in Deschutes County?

    Look the property up in DIAL (dial.deschutes.org) and open its Development tab, which the county says shows permit history and historical Community Development records. For the permit's inspections and status, search the address in Oregon ePermitting.

  • Does Deschutes County handle permits for Bend and Redmond?

    No. Bend and Redmond run their own permit offices. Deschutes County Community Development permits unincorporated land and the cities of Sisters and La Pine.

  • How do I find an old Deschutes County permit or plans?

    Search DevDocs, the county's Community Development document system, by map and taxlot number, file number or keywords. The county says documents dating back to 1970 are available. DIAL's Development - Documents menu lists the same documents for one property.

  • Can I search Deschutes County permits by contractor?

    Oregon ePermitting's search has License # and License Type fields, so you can look up permits by a contractor's license. The Assessor's permit copy we use names no contractor, so our pages show counts, not firm lists.

  • How long does a building permit take to reach final in Deschutes County?

    For permits issued in 2023 that reached Finaled or Closed in the Assessor's copy, the usual permit took 382 days from issue (middle half 262 to 490 days). A new home usually took 408 days.

Build your own list

Pick your city and the kind of work. Every firm with a permit on record, sorted by what you value.