Data through September 2026 · updated 18 Oct 2026
2,125 demolition permits were issued in Detroit, October 2024 through September 2026: about 1,062 a year and 4% of all permits. 612 demolition permits in the last 12 months (Oct 2025–Sep 2026), 60% fewer than the 1,513 in the 12 months before. The busiest month is October. 48205 has the most, 272.
Permits issued each month, October 2024 through September 2026.
| Month | Permits |
|---|---|
| Oct 2024 | 173 |
| Nov 2024 | 147 |
| Dec 2024 | 83 |
| Jan 2025 | 139 |
| Feb 2025 | 56 |
| Mar 2025 | 87 |
| Apr 2025 | 175 |
| May 2025 | 93 |
| Jun 2025 | 168 |
| Jul 2025 | 154 |
| Aug 2025 | 141 |
| Sep 2025 | 97 |
| Oct 2025 | 82 |
| Nov 2025 | 104 |
| Dec 2025 | 63 |
| Jan 2026 | 104 |
| Feb 2026 | 45 |
| Mar 2026 | 66 |
| Apr 2026 | 59 |
| May 2026 | 24 |
| Jun 2026 | 20 |
| Jul 2026 | 10 |
| Aug 2026 | 14 |
| Sep 2026 | 21 |
By calendar month, 100 = an average month (the thin line). October is the busiest (144), February the quietest (57). A busy month at the permit counter usually means a longer wait for a contractor.
| Month | Index |
|---|---|
| January | 137 |
| February | 57 |
| March | 86 |
| April | 132 |
| May | 66 |
| June | 106 |
| July | 93 |
| August | 88 |
| September | 67 |
| October | 144 |
| November | 142 |
| December | 82 |
Counted at the property's ZIP code. Share is the part of the city's 2,125 demolition permits.
How the city filed these permits. We group its types into kinds of work; this is the split.
| Permit type | Permits | Share |
|---|---|---|
| Demolition | 2,113 | 99% |
| Alteration | 10 | under 1% |
| Residential Rehab | 1 | under 1% |
| Other | 1 | under 1% |
Plumbing (13,739)HVAC (12,989)Electrical (9,705)Remodels & repairs (7,119)Roofing (1,820)Solar (398)New homes (212)
Source: City of Detroit Open Data, BSEED Building Permits, Trades Permits and Demolition Permits layers, read 18 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out. The city's public permit layers carry an issue date but no permit status and no final inspection or closed date, so no finished share is shown.
Building, trades (mechanical, electrical, plumbing, elevator, fire alarm, boiler, generator) and demolition permits the City of Detroit Buildings, Safety Engineering and Environmental Department (BSEED) issues inside city limits. Revisions of an earlier permit are not counted again. Hamtramck, Highland Park, Dearborn and the rest of Wayne County run their own permit offices and are not in this file.
Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →
Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:
Contractor Records, "Demolition permits in Detroit, MI", https://contractorrecords.com/detroit/demolition-permits, data through September 2026, from the City of Detroit Buildings, Safety Engineering and Environmental Department building-permit records.Link to a table: By month · Season · By ZIP code · Permit types.
Download the tables (CSV): Demolition permits by month · Demolition permits by calendar month (index) · Demolition permits by ZIP code · Demolition permits by permit type.