Contractor Records
Home › Detroit › HVAC

HVAC permits in Detroit, MI

Data through September 2026 · updated 18 Oct 2026

12,989 HVAC permits were issued in Detroit, October 2024 through September 2026: about 6,494 a year and 25% of all permits. 5,488 HVAC permits in the last 12 months (Oct 2025–Sep 2026), 27% fewer than the 7,501 in the 12 months before. The busiest month is April. 48235 has the most, 1,149.

12,989permits issued
5,488last 12 months
Aprbusiest month
Sep 2026records through

HVAC permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 633Oct2024Nov 2024: 566Dec 2024: 524Jan 2025: 739Jan2025Feb 2025: 710Mar 2025: 856Apr 2025: 941May 2025: 640Jun 2025: 545Jul 2025: 513JulAug 2025: 375Sep 2025: 459Oct 2025: 585Nov 2025: 410Dec 2025: 538Jan 2026: 458Jan2026Feb 2026: 475Mar 2026: 546Apr 2026: 472May 2026: 378Jun 2026: 469Jul 2026: 357JulAug 2026: 373Sep 2026: 427
The same numbers as a table
MonthPermits
Oct 2024633
Nov 2024566
Dec 2024524
Jan 2025739
Feb 2025710
Mar 2025856
Apr 2025941
May 2025640
Jun 2025545
Jul 2025513
Aug 2025375
Sep 2025459
Oct 2025585
Nov 2025410
Dec 2025538
Jan 2026458
Feb 2026475
Mar 2026546
Apr 2026472
May 2026378
Jun 2026469
Jul 2026357
Aug 2026373
Sep 2026427

Download this table (CSV)

When HVAC permits are filed

By calendar month, 100 = an average month (the thin line). April is the busiest (131), August the quietest (69). A busy month at the permit counter usually means a longer wait for a contractor.

January: 111 (100 = an average month)February: 109 (100 = an average month)March: 130 (100 = an average month)April: 131 (100 = an average month)131May: 94 (100 = an average month)June: 94 (100 = an average month)July: 80 (100 = an average month)August: 69 (100 = an average month)September: 82 (100 = an average month)October: 113 (100 = an average month)November: 90 (100 = an average month)December: 98 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January111
February109
March130
April131
May94
June94
July80
August69
September82
October113
November90
December98

Download this table (CSV)

ZIP codes with the most HVAC permits

Counted at the property's ZIP code. Share is the part of the city's 12,989 HVAC permits.

ZIP codePermitsShare
482351,1499%
482218256%
482277876%
482197676%
482247216%
482287135%
482056765%
482146595%
482346025%
482025684%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Mechanical12,73198%
Boiler PV2582%

Download this table (CSV)

How these numbers are made

Source: City of Detroit Open Data, BSEED Building Permits, Trades Permits and Demolition Permits layers, read 18 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out. The city's public permit layers carry an issue date but no permit status and no final inspection or closed date, so no finished share is shown.

Building, trades (mechanical, electrical, plumbing, elevator, fire alarm, boiler, generator) and demolition permits the City of Detroit Buildings, Safety Engineering and Environmental Department (BSEED) issues inside city limits. Revisions of an earlier permit are not counted again. Hamtramck, Highland Park, Dearborn and the rest of Wayne County run their own permit offices and are not in this file.

  • The city's file has no permit status and no final inspection date, so we show neither a finished share nor time to final.
  • Only building permits carry a value: the estimated contractor cost written on the application, not the final cost. Trade and demolition permits have no value, so the HVAC, electrical, plumbing and demolition figures carry none.
  • Detroit issues electrical, plumbing and mechanical work as separate trades permits, so one house job can count several times, once under each kind of work. A building alteration that mentions trade work stays a remodel.
  • Plumbing counts include the Detroit Water and Sewerage Department's lead service line and water main replacement programmes, which file thousands of plumbing permits a year.
  • Homes are told apart by the building permit's use group and use type and, for trade and demolition permits, by the property class on the city assessor's parcel file.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "HVAC permits in Detroit, MI", https://contractorrecords.com/detroit/hvac-permits, data through September 2026, from the City of Detroit Buildings, Safety Engineering and Environmental Department building-permit records.

Link to a table: By month · Season · By ZIP code · Permit types.

Download the tables (CSV): HVAC permits by month · HVAC permits by calendar month (index) · HVAC permits by ZIP code · HVAC permits by permit type.

Common questions

  • How many HVAC permits does Detroit issue a year?About 6,494 a year in Detroit: 12,989 permits issued October 2024 through September 2026, 5,488 of them in the last 12 months.
  • When do people in Detroit file the most HVAC permits?April (131 against an average month of 100); August is the quietest (69). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most HVAC permits in Detroit?48235, with 1,149 of the 12,989 (9%); then 48221 (825).