Data through September 2026 · updated 18 Oct 2026
398 solar permits were issued in Detroit, October 2024 through September 2026: about 199 a year and under 1% of all permits. 219 solar permits in the last 12 months (Oct 2025–Sep 2026), 22% more than the 179 in the 12 months before. The busiest month is October. 48215 has the most, 45.
Permits issued each month, October 2024 through September 2026.
| Month | Permits |
|---|---|
| Oct 2024 | 6 |
| Nov 2024 | 6 |
| Dec 2024 | 12 |
| Jan 2025 | 3 |
| Feb 2025 | 15 |
| Mar 2025 | 19 |
| Apr 2025 | 20 |
| May 2025 | 22 |
| Jun 2025 | 17 |
| Jul 2025 | 22 |
| Aug 2025 | 20 |
| Sep 2025 | 17 |
| Oct 2025 | 42 |
| Nov 2025 | 33 |
| Dec 2025 | 9 |
| Jan 2026 | 22 |
| Feb 2026 | 16 |
| Mar 2026 | 18 |
| Apr 2026 | 13 |
| May 2026 | 14 |
| Jun 2026 | 7 |
| Jul 2026 | 15 |
| Aug 2026 | 22 |
| Sep 2026 | 8 |
By calendar month, 100 = an average month (the thin line). October is the busiest (145), December the quietest (63). A busy month at the permit counter usually means a longer wait for a contractor.
| Month | Index |
|---|---|
| January | 75 |
| February | 93 |
| March | 112 |
| April | 99 |
| May | 109 |
| June | 72 |
| July | 112 |
| August | 127 |
| September | 75 |
| October | 145 |
| November | 118 |
| December | 63 |
The value written on the permit at application, from 195 permits with one. Not a quote and not the final bill.
| Measure | Value |
|---|---|
| Usual declared value | $18,655 |
| Middle half | $8,102–$29,446 |
Counted at the property's ZIP code. Share is the part of the city's 398 solar permits.
How the city filed these permits. We group its types into kinds of work; this is the split.
| Permit type | Permits | Share |
|---|---|---|
| Electrical | 202 | 51% |
| Alteration | 192 | 48% |
| Other | 3 | under 1% |
| Generator | 1 | under 1% |
Plumbing (13,739)HVAC (12,989)Electrical (9,705)Remodels & repairs (7,119)Demolition (2,125)Roofing (1,820)New homes (212)
Source: City of Detroit Open Data, BSEED Building Permits, Trades Permits and Demolition Permits layers, read 18 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out. The city's public permit layers carry an issue date but no permit status and no final inspection or closed date, so no finished share is shown.
Building, trades (mechanical, electrical, plumbing, elevator, fire alarm, boiler, generator) and demolition permits the City of Detroit Buildings, Safety Engineering and Environmental Department (BSEED) issues inside city limits. Revisions of an earlier permit are not counted again. Hamtramck, Highland Park, Dearborn and the rest of Wayne County run their own permit offices and are not in this file.
Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →
Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:
Contractor Records, "Solar permits in Detroit, MI", https://contractorrecords.com/detroit/solar-permits, data through September 2026, from the City of Detroit Buildings, Safety Engineering and Environmental Department building-permit records.Link to a table: By month · Season · Declared value · By ZIP code · Permit types.
Download the tables (CSV): Solar permits by month · Solar permits by calendar month (index) · Solar permits: declared value · Solar permits by ZIP code · Solar permits by permit type.