Contractor Records
Home › Detroit › Solar

Solar permits in Detroit, MI

Data through September 2026 · updated 18 Oct 2026

398 solar permits were issued in Detroit, October 2024 through September 2026: about 199 a year and under 1% of all permits. 219 solar permits in the last 12 months (Oct 2025–Sep 2026), 22% more than the 179 in the 12 months before. The busiest month is October. 48215 has the most, 45.

398permits issued
219last 12 months
Octbusiest month
$18,655usual declared value
Sep 2026records through

Solar permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 6Oct2024Nov 2024: 6Dec 2024: 12Jan 2025: 3Jan2025Feb 2025: 15Mar 2025: 19Apr 2025: 20May 2025: 22Jun 2025: 17Jul 2025: 22JulAug 2025: 20Sep 2025: 17Oct 2025: 42Nov 2025: 33Dec 2025: 9Jan 2026: 22Jan2026Feb 2026: 16Mar 2026: 18Apr 2026: 13May 2026: 14Jun 2026: 7Jul 2026: 15JulAug 2026: 22Sep 2026: 8
The same numbers as a table
MonthPermits
Oct 20246
Nov 20246
Dec 202412
Jan 20253
Feb 202515
Mar 202519
Apr 202520
May 202522
Jun 202517
Jul 202522
Aug 202520
Sep 202517
Oct 202542
Nov 202533
Dec 20259
Jan 202622
Feb 202616
Mar 202618
Apr 202613
May 202614
Jun 20267
Jul 202615
Aug 202622
Sep 20268

Download this table (CSV)

When solar permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (145), December the quietest (63). A busy month at the permit counter usually means a longer wait for a contractor.

January: 75 (100 = an average month)February: 93 (100 = an average month)March: 112 (100 = an average month)April: 99 (100 = an average month)May: 109 (100 = an average month)June: 72 (100 = an average month)July: 112 (100 = an average month)August: 127 (100 = an average month)September: 75 (100 = an average month)October: 145 (100 = an average month)145November: 118 (100 = an average month)December: 63 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January75
February93
March112
April99
May109
June72
July112
August127
September75
October145
November118
December63

Download this table (CSV)

What a solar permit is declared at

The value written on the permit at application, from 195 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$18,655
Middle half$8,102–$29,446

Download this table (CSV)

ZIP codes with the most solar permits

Counted at the property's ZIP code. Share is the part of the city's 398 solar permits.

ZIP codePermitsShare
482154511%
48221328%
48235308%
48219297%
48214297%
48205236%
48224215%
48234215%
48206215%
48209195%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Electrical20251%
Alteration19248%
Other3under 1%
Generator1under 1%

Download this table (CSV)

How these numbers are made

Source: City of Detroit Open Data, BSEED Building Permits, Trades Permits and Demolition Permits layers, read 18 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out. The city's public permit layers carry an issue date but no permit status and no final inspection or closed date, so no finished share is shown.

Building, trades (mechanical, electrical, plumbing, elevator, fire alarm, boiler, generator) and demolition permits the City of Detroit Buildings, Safety Engineering and Environmental Department (BSEED) issues inside city limits. Revisions of an earlier permit are not counted again. Hamtramck, Highland Park, Dearborn and the rest of Wayne County run their own permit offices and are not in this file.

  • The city's file has no permit status and no final inspection date, so we show neither a finished share nor time to final.
  • Only building permits carry a value: the estimated contractor cost written on the application, not the final cost. Trade and demolition permits have no value, so the HVAC, electrical, plumbing and demolition figures carry none.
  • Detroit issues electrical, plumbing and mechanical work as separate trades permits, so one house job can count several times, once under each kind of work. A building alteration that mentions trade work stays a remodel.
  • Plumbing counts include the Detroit Water and Sewerage Department's lead service line and water main replacement programmes, which file thousands of plumbing permits a year.
  • Homes are told apart by the building permit's use group and use type and, for trade and demolition permits, by the property class on the city assessor's parcel file.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Solar permits in Detroit, MI", https://contractorrecords.com/detroit/solar-permits, data through September 2026, from the City of Detroit Buildings, Safety Engineering and Environmental Department building-permit records.

Link to a table: By month · Season · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Solar permits by month · Solar permits by calendar month (index) · Solar permits: declared value · Solar permits by ZIP code · Solar permits by permit type.

Common questions

  • How many solar permits does Detroit issue a year?About 199 a year in Detroit: 398 permits issued October 2024 through September 2026, 219 of them in the last 12 months.
  • When do people in Detroit file the most solar permits?October (145 against an average month of 100); December is the quietest (63). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most solar permits in Detroit?48215, with 45 of the 398 (11%); then 48221 (32).