Data through September 2026 · updated 19 Oct 2026
11,450 building permits were issued in Everett from October 2024 to September 2026, about 5,725 a year. Electrical permits lead with 5,254, then HVAC (2,100) and plumbing (1,322). The city's file names contractors, but we have not matched the names to state license records, so we only count permits per firm and don't rate or rank them: these pages show what was built, where and when.
Building, electrical, mechanical, plumbing, solar, demolition, fire protection and sign permits the City of Everett Permit Services issues inside city limits. Water, sewer and franchise utility, public works and street use permits in the same file are not counted. Unincorporated Snohomish County, Mukilteo and the other nearby cities run their own permit offices and are not in this file.
The permit file can't tell you who does good work. Ask for the contractor's license number and look it up at the Washington State Department of Labor & Industries, then ask the city whether they pulled the permit for your job.
Permits issued October 2024 through September 2026, every kind of work with 100 or more. Last 12 months is Oct 2025–Sep 2026.
| Kind of work | Permits | Share | Last 12 mo |
|---|---|---|---|
| Electrical | 5,254 | 46% | 2,723 |
| HVAC | 2,100 | 18% | 1,002 |
| Plumbing | 1,322 | 12% | 585 |
| Remodels & repairs | 318 | 3% | 173 |
| Roofing | 310 | 3% | 144 |
| ADUs & casitas | 134 | 1% | 100 |
| Demolition | 119 | 1% | 76 |
| New homes | 115 | 1% | 59 |
| Other | 1,623 | 14% | 787 |
Fewer than 100 permits, so no row: solar (91), additions (31), garages, sheds & shade structures (24), pools & spas (9).
The contractors named on the most permits in the City of Everett TRAKiT permit file, October 2024 through September 2026, with 5 or more each. Share is the part of all 11,450 permits; 90% of them name a contractor we can show. This is volume, not quality: more permits doesn't mean better work. Individuals' names, owner-builders and blanks are left out.
| Contractor | Permits | Share |
|---|---|---|
| CM Heating LLC | 551 | 5% |
| CM Air Pros LLC | 291 | 3% |
| Fast Water Heater Company | 260 | 2% |
| Veca Electric & Tech LLC | 171 | 1% |
| Washington Energy Svcs Co LLC | 134 | 1% |
| Fire Protection Inc | 126 | 1% |
| Cochran Inc | 118 | 1% |
| Seatown Electric Heating & Air | 113 | under 1% |
| Home Comfort Alliance LLC | 110 | under 1% |
| West Coast Plbg & Htg Inc | 94 | under 1% |
Local permit rules and lookups, each with Everett's own permit numbers.
Permit data for other places in Seattle and Puget Sound. Each permit office keeps its own file, so the numbers are not added together.
Seattle, WABellevue, WAKing County, WATacoma, WAPierce County, WAKitsap County, WAAuburn, WA
Source: City of Everett Open Data, Trakit Permits dataset 3w3u-656c, read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out. The city's public file has no permit status and no final inspection date, only an expiration date on some permits, so no finished share is shown.
Building, electrical, mechanical, plumbing, solar, demolition, fire protection and sign permits the City of Everett Permit Services issues inside city limits. Water, sewer and franchise utility, public works and street use permits in the same file are not counted. Unincorporated Snohomish County, Mukilteo and the other nearby cities run their own permit offices and are not in this file.
Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →
Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:
Contractor Records, "Everett, WA building permits", https://contractorrecords.com/everett/, data through September 2026, from the City of Everett Permit Services building-permit records.Link to a table: By kind of work · Most active contractors by permits filed · Browse the permits · Permits each month.
Download the tables (CSV): Permits by kind of work · Most active contractors by permits filed · Permits in the last 12 months.
Every permit in the file issued October 2024 through September 2026, newest first. Pick a month, a kind of work or a ZIP code. Each row is one permit: no street address, no names.
The list loads as you reach it (11,450 permits).
| Issued | Kind of work | City permit type | ZIP |
|---|
Permits issued each month and the kind of work with the most. A month opens its permits in the list above.
| Month | Permits | Top kind of work |
|---|---|---|
| Sep 2026 | 538 | Electrical (252) |
| Aug 2026 | 504 | Electrical (229) |
| Jul 2026 | 565 | Electrical (275) |
| Jun 2026 | 512 | Electrical (251) |
| May 2026 | 451 | Electrical (223) |
| Apr 2026 | 489 | Electrical (249) |
| Mar 2026 | 461 | Electrical (219) |
| Feb 2026 | 425 | Electrical (208) |
| Jan 2026 | 451 | Electrical (222) |
| Dec 2025 | 442 | Electrical (206) |
| Nov 2025 | 391 | Electrical (170) |
| Oct 2025 | 469 | Electrical (219) |