Contractor Records
Home › Everett

Everett, WA building permits

Data through September 2026 · updated 19 Oct 2026

11,450 building permits were issued in Everett from October 2024 to September 2026, about 5,725 a year. Electrical permits lead with 5,254, then HVAC (2,100) and plumbing (1,322). The city's file names contractors, but we have not matched the names to state license records, so we only count permits per firm and don't rate or rank them: these pages show what was built, where and when.

11,450permits issued
5,725a year
Sep 2026records through

What gets built here

What this page can and can't show

  • ✓Permits the city issued, by kind of work, month and ZIP code.
  • ✓What the job was declared at on the permit.
  • ✓Which contractors filed the most permits (volume, not quality).
  • Who does good work. The city's file names contractors, but we have not matched the names to state license records, so we only count permits per firm and don't rate or rank them.
  • Which permits were finished. The city's public file has no permit status and no final inspection date, only an expiration date on some permits.
  • Street addresses or owners. We publish counts and permit rows without them.

Building, electrical, mechanical, plumbing, solar, demolition, fire protection and sign permits the City of Everett Permit Services issues inside city limits. Water, sewer and franchise utility, public works and street use permits in the same file are not counted. Unincorporated Snohomish County, Mukilteo and the other nearby cities run their own permit offices and are not in this file.

Hiring someone here?

The permit file can't tell you who does good work. Ask for the contractor's license number and look it up at the Washington State Department of Labor & Industries, then ask the city whether they pulled the permit for your job.

How to check a contractor's license in Washington →

Permits by kind of work

Permits issued October 2024 through September 2026, every kind of work with 100 or more. Last 12 months is Oct 2025–Sep 2026.

Kind of workPermitsShareLast 12 mo
Electrical5,25446%2,723
HVAC2,10018%1,002
Plumbing1,32212%585
Remodels & repairs3183%173
Roofing3103%144
ADUs & casitas1341%100
Demolition1191%76
New homes1151%59
Other1,62314%787

Fewer than 100 permits, so no row: solar (91), additions (31), garages, sheds & shade structures (24), pools & spas (9).

Download this table (CSV)

Most active contractors by permits filed

The contractors named on the most permits in the City of Everett TRAKiT permit file, October 2024 through September 2026, with 5 or more each. Share is the part of all 11,450 permits; 90% of them name a contractor we can show. This is volume, not quality: more permits doesn't mean better work. Individuals' names, owner-builders and blanks are left out.

ContractorPermitsShare
CM Heating LLC5515%
CM Air Pros LLC2913%
Fast Water Heater Company2602%
Veca Electric & Tech LLC1711%
Washington Energy Svcs Co LLC1341%
Fire Protection Inc1261%
Cochran Inc1181%
Seatown Electric Heating & Air113under 1%
Home Comfort Alliance LLC110under 1%
West Coast Plbg & Htg Inc94under 1%

Download this table (CSV)

Guides for Everett

Local permit rules and lookups, each with Everett's own permit numbers.

Nearby permit data

Permit data for other places in Seattle and Puget Sound. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Everett Open Data, Trakit Permits dataset 3w3u-656c, read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out. The city's public file has no permit status and no final inspection date, only an expiration date on some permits, so no finished share is shown.

Building, electrical, mechanical, plumbing, solar, demolition, fire protection and sign permits the City of Everett Permit Services issues inside city limits. Water, sewer and franchise utility, public works and street use permits in the same file are not counted. Unincorporated Snohomish County, Mukilteo and the other nearby cities run their own permit offices and are not in this file.

  • The file has no permit status and no final inspection date, so we show neither a finished share nor time to final.
  • Most electrical permits don't say whether the property is a home or a business, so we don't split permits into homes and other buildings.
  • The value is the job value written on the permit, not the final cost of the job.
  • The ZIP code is read from the permit's site address.
  • A house job can need separate building, electrical, mechanical and plumbing permits, so one project can count several times, once under each kind of work.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Everett, WA building permits", https://contractorrecords.com/everett/, data through September 2026, from the City of Everett Permit Services building-permit records.

Link to a table: By kind of work · Most active contractors by permits filed · Browse the permits · Permits each month.

Download the tables (CSV): Permits by kind of work · Most active contractors by permits filed · Permits in the last 12 months.

Common questions

  • How many building permits does Everett issue a year?About 5,725 a year in Everett: 11,450 permits issued October 2024 through September 2026, 5,698 of them in the last 12 months. That counts the permits the city issued, not denied or withdrawn applications.
  • Can I find a contractor's permits in Everett?The city's file names contractors, but we have not matched the names to state license records, so we only count permits per firm and don't rate or rank them. The table above lists the contractors named on the most permits, as a count only. Check a license at the Washington State Department of Labor & Industries and ask the contractor for the permit number of a past job.
  • What do people build most in Everett?Electrical: 5,254 of the 11,450 permits (46%), then HVAC (2,100), plumbing (1,322), October 2024 through September 2026.
  • How do I look up a building permit in Everett?Filter the permit list on this page by month, kind of work and ZIP code to see what was issued. For one property's permits, search the city's own records by address or permit number; we don't publish addresses. How to look up a permit in Everett →
  • How many permits were issued in Everett last month?538 in September 2026, the last full month on file; 5,698 over the last 12 months.

Browse the permits

Browse 11,450 permits

Every permit in the file issued October 2024 through September 2026, newest first. Pick a month, a kind of work or a ZIP code. Each row is one permit: no street address, no names.

The list loads as you reach it (11,450 permits).

IssuedKind of workCity permit typeZIP

Permits each month, the last 12 months

Permits issued each month and the kind of work with the most. A month opens its permits in the list above.

MonthPermitsTop kind of work
Sep 2026538Electrical (252)
Aug 2026504Electrical (229)
Jul 2026565Electrical (275)
Jun 2026512Electrical (251)
May 2026451Electrical (223)
Apr 2026489Electrical (249)
Mar 2026461Electrical (219)
Feb 2026425Electrical (208)
Jan 2026451Electrical (222)
Dec 2025442Electrical (206)
Nov 2025391Electrical (170)
Oct 2025469Electrical (219)

Download this table (CSV)