282 garage, shed and shade structure permits were issued in the City of Fayetteville, October 2024 through September 2026: about 141 a year and 2% of all permits. 158 garage, shed and shade structure permits in the last 12 months (Oct 2025–Sep 2026), 27% more than the 124 in the 12 months before. The busiest month is June. The usual one took 109 days from issue to the city's final.

282permits issued
158last 12 months
Junbusiest month
109days, usual issue to final
70%finished
$20,000usual declared value
Sep 2026records through

Garage, shed and shade structure permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 13Oct2024Nov 2024: 8Dec 2024: 10Jan 2025: 3Jan2025Feb 2025: 7Mar 2025: 10Apr 2025: 12May 2025: 8Jun 2025: 22Jul 2025: 11JulAug 2025: 9Sep 2025: 11Oct 2025: 5Nov 2025: 7Dec 2025: 10Jan 2026: 27Jan2026Feb 2026: 11Mar 2026: 12Apr 2026: 16May 2026: 15Jun 2026: 13Jul 2026: 11JulAug 2026: 20Sep 2026: 11
The same numbers as a table
MonthPermits
Oct 202413
Nov 20248
Dec 202410
Jan 20253
Feb 20257
Mar 202510
Apr 202512
May 20258
Jun 202522
Jul 202511
Aug 20259
Sep 202511
Oct 20255
Nov 20257
Dec 202510
Jan 202627
Feb 202611
Mar 202612
Apr 202616
May 202615
Jun 202613
Jul 202611
Aug 202620
Sep 202611

Download this table (CSV)

When garage, shed and shade structure permits are filed

By calendar month, 100 = an average month (the thin line). June is the busiest (149), November the quietest (64). A busy month at the permit counter usually means a longer wait for a contractor.

January: 128 (100 = an average month)February: 77 (100 = an average month)March: 94 (100 = an average month)April: 119 (100 = an average month)May: 98 (100 = an average month)June: 149 (100 = an average month)149July: 94 (100 = an average month)August: 123 (100 = an average month)September: 94 (100 = an average month)October: 77 (100 = an average month)November: 64 (100 = an average month)December: 85 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January128
February77
March94
April119
May98
June149
July94
August123
September94
October77
November64
December85

Download this table (CSV)

How long a garage, shed and shade structure permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 87 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025124
Finished70.2%
Expired25.8%
Usual days, issue to final109
Middle half, days37–160

Download this table (CSV)

What a garage, shed and shade structure permit is declared at

The value written on the permit at application, from 282 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$20,000
Middle half$8,500–$48,660

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Miscellaneous Building: Deck8731%
Miscellaneous Building: Storage Building/Shed/Accessory Structure7527%
Miscellaneous Building: Porch/Patio Cover_Pergola7125%
Miscellaneous Building: Detached Garage/Carport4917%

Download this table (CSV)

How these numbers are made

Source: City of Fayetteville GIS: Permit layer (Permits MapServer layer 0, from the city's EnerGov permit system), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building, plumbing, mechanical, electrical, gas, pool, demolition, sign and fire-protection permits the City of Fayetteville, Arkansas issues inside city limits. Plumbing permits the city issues for properties outside its limits (Farmington and other areas on city water), right-of-way, street closure, grading and vendor permits in the same file are not counted. Springdale, Johnson, Farmington and unincorporated Washington County run their own permit offices and are not in this file, and neither is Fayetteville, North Carolina.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Fayetteville.
  • A final date is the city's finalize date; a permit marked complete counts as finished.
  • The value is the job value declared on the permit.
  • Gas permits for furnaces and heaters count as HVAC; other gas permits count as plumbing. Lawn irrigation permits are plumbing permits in the city's file and count as plumbing.
  • Homes are permits whose type or work class names a residence (including HVAC and water heater change-outs and home decks, sheds and patio covers); commercial work counts as other.
  • The file has no ZIP code we can publish, so there are no ZIP code pages.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Garage, shed and shade structure permits in the City of Fayetteville, AR", https://contractorrecords.com/fayetteville-ar/accessory-permits, data through September 2026, from City of Fayetteville Development Services, Building Safety Division building-permit records.

Link to a table: By month · Season · Days to final · Declared value · Permit types.

Download the tables (CSV): Garages, sheds & shade structures permits by month · Garages, sheds & shade structures permits by calendar month (index) · Garages, sheds & shade structures permits: days to final · Garages, sheds & shade structures permits: declared value · Garages, sheds & shade structures permits by permit type.

Common questions

  • How many garage, shed and shade structure permits does Fayetteville issue a year?About 141 a year in the City of Fayetteville: 282 permits issued October 2024 through September 2026, 158 of them in the last 12 months.
  • How long does a garage, shed and shade structure permit take in Fayetteville?The usual one took 109 days from issue to the city's final inspection, and the middle half took 37 to 160 days (87 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.