Demolition permits in the City of Fayetteville, AR

Data through September 2026 · updated 19 Oct 2026

202 demolition permits were issued in the City of Fayetteville, October 2024 through September 2026: about 101 a year and 2% of all permits. 115 demolition permits in the last 12 months (Oct 2025–Sep 2026), 32% more than the 87 in the 12 months before. The busiest month is June. The usual one took 70 days from issue to the city's final.

202permits issued
115last 12 months
Junbusiest month
70days, usual issue to final
Sep 2026records through

Demolition permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 7Oct2024Nov 2024: 6Dec 2024: 1Jan 2025: 4Jan2025Feb 2025: 3Mar 2025: 5Apr 2025: 13May 2025: 5Jun 2025: 17Jul 2025: 10JulAug 2025: 6Sep 2025: 10Oct 2025: 12Nov 2025: 13Dec 2025: 20Jan 2026: 2Jan2026Feb 2026: 9Mar 2026: 11Apr 2026: 6May 2026: 10Jun 2026: 8Jul 2026: 12JulAug 2026: 10Sep 2026: 2
The same numbers as a table
MonthPermits
Oct 20247
Nov 20246
Dec 20241
Jan 20254
Feb 20253
Mar 20255
Apr 202513
May 20255
Jun 202517
Jul 202510
Aug 20256
Sep 202510
Oct 202512
Nov 202513
Dec 202520
Jan 20262
Feb 20269
Mar 202611
Apr 20266
May 202610
Jun 20268
Jul 202612
Aug 202610
Sep 20262

Download this table (CSV)

When demolition permits are filed

By calendar month, 100 = an average month (the thin line). June is the busiest (149), January the quietest (36). A busy month at the permit counter usually means a longer wait for a contractor.

January: 36 (100 = an average month)February: 71 (100 = an average month)March: 95 (100 = an average month)April: 113 (100 = an average month)May: 89 (100 = an average month)June: 149 (100 = an average month)149July: 131 (100 = an average month)August: 95 (100 = an average month)September: 71 (100 = an average month)October: 113 (100 = an average month)November: 113 (100 = an average month)December: 125 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January36
February71
March95
April113
May89
June149
July131
August95
September71
October113
November113
December125

Download this table (CSV)

How long a demolition permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 78 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 202587
Usual days, issue to final70
Middle half, days29–176

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Demolition: Residential14471%
Demolition: Commercial5829%

Download this table (CSV)

How these numbers are made

Source: City of Fayetteville GIS: Permit layer (Permits MapServer layer 0, from the city's EnerGov permit system), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building, plumbing, mechanical, electrical, gas, pool, demolition, sign and fire-protection permits the City of Fayetteville, Arkansas issues inside city limits. Plumbing permits the city issues for properties outside its limits (Farmington and other areas on city water), right-of-way, street closure, grading and vendor permits in the same file are not counted. Springdale, Johnson, Farmington and unincorporated Washington County run their own permit offices and are not in this file, and neither is Fayetteville, North Carolina.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Fayetteville.
  • A final date is the city's finalize date; a permit marked complete counts as finished.
  • The value is the job value declared on the permit.
  • Gas permits for furnaces and heaters count as HVAC; other gas permits count as plumbing. Lawn irrigation permits are plumbing permits in the city's file and count as plumbing.
  • Homes are permits whose type or work class names a residence (including HVAC and water heater change-outs and home decks, sheds and patio covers); commercial work counts as other.
  • The file has no ZIP code we can publish, so there are no ZIP code pages.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Demolition permits in the City of Fayetteville, AR", https://contractorrecords.com/fayetteville-ar/demolition-permits, data through September 2026, from City of Fayetteville Development Services, Building Safety Division building-permit records.

Link to a table: By month · Season · Days to final · Permit types.

Download the tables (CSV): Demolition permits by month · Demolition permits by calendar month (index) · Demolition permits: days to final · Demolition permits by permit type.

Common questions

  • How many demolition permits does Fayetteville issue a year?About 101 a year in the City of Fayetteville: 202 permits issued October 2024 through September 2026, 115 of them in the last 12 months.
  • How long does a demolition permit take in Fayetteville?The usual one took 70 days from issue to the city's final inspection, and the middle half took 29 to 176 days (78 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Fayetteville file the most demolition permits?June (149 against an average month of 100); January is the quietest (36). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.