Demolition permits in Greenville, SC

Data through September 2026 · updated 19 Oct 2026

222 demolition permits were issued in Greenville, October 2024 through September 2026: about 111 a year and 7% of all permits. 103 demolition permits in the last 12 months (Oct 2025–Sep 2026), 13% fewer than the 119 in the 12 months before. The busiest month is October.

What this file covers: The city publishes building and demolition permits only; electrical, plumbing and mechanical permits are not in the file.

222permits issued
103last 12 months
Octbusiest month
99%finished
Sep 2026records through

Demolition permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 14Oct2024Nov 2024: 5Dec 2024: 14Jan 2025: 10Jan2025Feb 2025: 10Mar 2025: 9Apr 2025: 5May 2025: 16Jun 2025: 5Jul 2025: 9JulAug 2025: 9Sep 2025: 13Oct 2025: 16Nov 2025: 4Dec 2025: 6Jan 2026: 9Jan2026Feb 2026: 11Mar 2026: 5Apr 2026: 6May 2026: 5Jun 2026: 11Jul 2026: 9JulAug 2026: 12Sep 2026: 9
The same numbers as a table
MonthPermits
Oct 202414
Nov 20245
Dec 202414
Jan 202510
Feb 202510
Mar 20259
Apr 20255
May 202516
Jun 20255
Jul 20259
Aug 20259
Sep 202513
Oct 202516
Nov 20254
Dec 20256
Jan 20269
Feb 202611
Mar 20265
Apr 20266
May 20265
Jun 202611
Jul 20269
Aug 202612
Sep 20269

Download this table (CSV)

When demolition permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (162), November the quietest (49). A busy month at the permit counter usually means a longer wait for a contractor.

January: 103 (100 = an average month)February: 114 (100 = an average month)March: 76 (100 = an average month)April: 59 (100 = an average month)May: 114 (100 = an average month)June: 86 (100 = an average month)July: 97 (100 = an average month)August: 114 (100 = an average month)September: 119 (100 = an average month)October: 162 (100 = an average month)162November: 49 (100 = an average month)December: 108 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January103
February114
March76
April59
May114
June86
July97
August114
September119
October162
November49
December108

Download this table (CSV)

How many demolition permits get finished

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Oct 2024–Sep 2025119
Finished99.2%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Demolition, Residential Single Family16876%
Demolition, All Other Buildings5023%
Demolition, Residential Two Family Building42%

Download this table (CSV)

How these numbers are made

Source: City of Greenville GIS, BuildingPermits_PriorTwoYears (InfoHUB MapServer layer 0), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building and demolition permits the City of Greenville Building Codes division issued inside the city limits. Homes with a Greenville mailing address outside the city (Taylors, Berea, Mauldin's edges and the rest of unincorporated Greenville County) get their permits from Greenville County and are not in this file. Electrical, plumbing and mechanical permits are not published and are not counted.

  • The city's file lists a contractor on most permits, but this page shows permit counts only: there are no contractor lists, rankings or firm pages for Greenville.
  • The city publishes only building and demolition permits from the last two years or so. Electrical, plumbing and HVAC permits are not in the file, so there are no counts for those trades.
  • The file has no final date, so we show no time to final. A permit counts as finished when the city marks it closed.
  • The file has no ZIP code for the property, so there are no ZIP code pages.
  • Job value is the valuation declared on the permit.
  • Roofing, solar and pool jobs are picked out of residential alteration permits by their comments; window and door replacements count as remodels.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Demolition permits in Greenville, SC", https://contractorrecords.com/greenville-sc/demolition-permits, data through September 2026, from City of Greenville Building Codes building-permit records.

Link to a table: By month · Season · How many get finished · Permit types.

Download the tables (CSV): Demolition permits by month · Demolition permits by calendar month (index) · Demolition permits: finished share · Demolition permits by permit type.

Common questions

  • How many demolition permits does Greenville issue a year?About 111 a year in Greenville: 222 permits issued October 2024 through September 2026, 103 of them in the last 12 months.
  • When do people in Greenville file the most demolition permits?October (162 against an average month of 100); November is the quietest (49). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.