750 new home permits were issued in Greenville, October 2024 through September 2026: about 375 a year and 25% of all permits. 297 new home permits in the last 12 months (Oct 2025–Sep 2026), 34% fewer than the 453 in the 12 months before. The busiest month is October.

What this file covers: The city publishes building and demolition permits only; electrical, plumbing and mechanical permits are not in the file.

750permits issued
297last 12 months
Octbusiest month
81%finished
$200,000usual declared value
Sep 2026records through

New home permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 77Oct2024Nov 2024: 46Dec 2024: 17Jan 2025: 17Jan2025Feb 2025: 37Mar 2025: 39Apr 2025: 43May 2025: 42Jun 2025: 32Jul 2025: 46JulAug 2025: 19Sep 2025: 38Oct 2025: 9Nov 2025: 8Dec 2025: 21Jan 2026: 36Jan2026Feb 2026: 11Mar 2026: 26Apr 2026: 18May 2026: 23Jun 2026: 18Jul 2026: 38JulAug 2026: 50Sep 2026: 39
The same numbers as a table
MonthPermits
Oct 202477
Nov 202446
Dec 202417
Jan 202517
Feb 202537
Mar 202539
Apr 202543
May 202542
Jun 202532
Jul 202546
Aug 202519
Sep 202538
Oct 20259
Nov 20258
Dec 202521
Jan 202636
Feb 202611
Mar 202626
Apr 202618
May 202623
Jun 202618
Jul 202638
Aug 202650
Sep 202639

Download this table (CSV)

When new home permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (138), December the quietest (61). A busy month at the permit counter usually means a longer wait for a contractor.

January: 85 (100 = an average month)February: 77 (100 = an average month)March: 104 (100 = an average month)April: 98 (100 = an average month)May: 104 (100 = an average month)June: 80 (100 = an average month)July: 134 (100 = an average month)August: 110 (100 = an average month)September: 123 (100 = an average month)October: 138 (100 = an average month)138November: 86 (100 = an average month)December: 61 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January85
February77
March104
April98
May104
June80
July134
August110
September123
October138
November86
December61

Download this table (CSV)

How many new home permits get finished

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Oct 2024–Sep 2025453
Finished81.2%

Download this table (CSV)

What a new home permit is declared at

The value written on the permit at application, from 750 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$200,000
Middle half$155,998–$350,000

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Residential, New Single Family46061%
Residential, New Townhouse27336%
Residential, New Duplex172%

Download this table (CSV)

How Greenville compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of Greenville GIS, BuildingPermits_PriorTwoYears (InfoHUB MapServer layer 0), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building and demolition permits the City of Greenville Building Codes division issued inside the city limits. Homes with a Greenville mailing address outside the city (Taylors, Berea, Mauldin's edges and the rest of unincorporated Greenville County) get their permits from Greenville County and are not in this file. Electrical, plumbing and mechanical permits are not published and are not counted.

  • The city's file lists a contractor on most permits, but this page shows permit counts only: there are no contractor lists, rankings or firm pages for Greenville.
  • The city publishes only building and demolition permits from the last two years or so. Electrical, plumbing and HVAC permits are not in the file, so there are no counts for those trades.
  • The file has no final date, so we show no time to final. A permit counts as finished when the city marks it closed.
  • The file has no ZIP code for the property, so there are no ZIP code pages.
  • Job value is the valuation declared on the permit.
  • Roofing, solar and pool jobs are picked out of residential alteration permits by their comments; window and door replacements count as remodels.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "New home permits in Greenville, SC", https://contractorrecords.com/greenville-sc/new-home-permits, data through September 2026, from City of Greenville Building Codes building-permit records.

Link to a table: By month · Season · How many get finished · Declared value · Permit types.

Download the tables (CSV): New homes permits by month · New homes permits by calendar month (index) · New homes permits: finished share · New homes permits: declared value · New homes permits by permit type.

Common questions

  • How many new home permits does Greenville issue a year?About 375 a year in Greenville: 750 permits issued October 2024 through September 2026, 297 of them in the last 12 months.
  • When do people in Greenville file the most new home permits?October (138 against an average month of 100); December is the quietest (61). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.