What needs a permit in Bend
The City's Building Safety Division sheet When Is an Electrical Permit Required? (undated, read 23 October 2026) splits it this way:
| Job | Permit? |
|---|---|
| Replace light bulbs, fluorescent tubes or approved fuses | No |
| Like-for-like replacement of a fixture, receptacle or switch | No, homeowner only; "contractor requires permit (Minor Label)" |
| Replace certain appliances of 30 amps or less, single phase | No (a water heater still needs a plumbing permit) |
| Cord-and-plug Class 2 irrigation controls | No |
| Remodel, addition, alteration or repair involving existing wiring | Yes |
| New or changed branch circuits, pump circuits, low-voltage panels | Yes |
| Service or feeder work, temporary service | Yes |
| Renewable energy (solar) systems | Yes |
| Grounding electrodes when a metal water line is replaced | Yes; "Inspection will be done after the electrodes are installed and connected" |
| Power-company reconnection | Yes; the "permit covers one inspection" |
| New dwelling, garage or outbuilding with power | Yes |
The minor label is the state-issued alternative to a City permit for small contractor jobs; the City's minor label form says it "needs to posted prior to beginning the work". HVAC installs have their own electrical form, covered in the Bend HVAC permit guide.
What it costs
Fees are from the City's FY 2026-27 schedule, Resolution No. 3482, effective 1 July 2026 (section 2.7):
| Item | Fee |
|---|---|
| 2.7.16e Branch circuits without a service or feeder, per panel | $175.24 first circuit, $18.34 each added |
| 2.7.16d Branch circuits bought with a service or feeder, per panel | $18.34 each |
| 2.7.03 Service or feeder, install, alter or relocate, 200 amps or less | $254.70 |
| 2.7.04 Service or feeder, 201 to 400 amps | $309.71 |
| 2.7.09 Temporary service, 200 amps or less | $207.84 |
| 2.7.16a Limited energy, one and two family | $101.88 |
| 2.7.14 Renewable energy, 5 kVA or less / 5.01–15 kVA | $245.54 / $309.71 |
| 2.7.16c Each inspection over the allowance | $128.37 |
So one new 240-volt circuit for a car charger or a hot tub is $175.24, and a 200-amp panel upgrade with three new circuits is $254.70 plus 3 × $18.34. Each permit then carries the 12% State of Oregon surcharge. The schedule allows 4 inspections per permit for dwelling units; a fifth costs $128.37.
Who can do the work
You, on your own house. ORS 479.540(1): "a person is not required to obtain a license to make an electrical installation on residential or farm property that is owned by the person or a member of the person's immediate family if the property is not intended for sale, exchange, lease or rent." If it is for rent or sale, the exemption covers only maintenance and "does not exempt new electrical installations or substantial alterations". The City sheet puts it plainly: for property that is for sale, rent, lease or exchange, "only an electrical contractor is authorized to do electrical installations". You still need the permit, and the City's forms list "Property owner via city issued permit" as a route.
An electrical contractor. Two state checks: the business on the CCB License Search and the electrician on the Building Codes Division license search. 76.8% of the 190 Bend electrical firms matched an active CCB license by name. Step by step: Bend contractor license lookup.
How to apply
- Apply in the Online Permit Center; all Bend permits are applied for there (Portal Help).
- List circuits and service size so the fee lines above can be applied.
- Request inspections in the portal: under My Items, pick the project and click Request Inspection (the steps on the City's water heater guide).
- Questions: Building Safety, 710 NW Wall Street, (541) 388-5528, building@bendoregon.gov.
What 3,938 Bend electrical permits show
| Measure | Bend electrical |
|---|---|
| Permits on homes, October 2023 to September 2026 | 3,938 |
| Firms | 190 |
| Firms with a permit in the last 12 months of the file | 129 |
| Finaled (permits a year or more old) | 88.1% |
| Usual days from issue to final | 31 |
| 10th / 90th-percentile firm (10+ permits) | 76.4% / 95.8% |
| Firms with 10+ permits | 63 |
| Five busiest firms' share | 43.5% |
| Firms with 5+ permits, none in the last 12 months | 14 |
| Busiest / quietest month | April (index 133) / July (86) |
Most Bend electrical permits close: 88.1% overall, and even the 10th-percentile busy firm finaled 76.4%. That makes an open electrical permit on your house after a couple of months worth a call. Filings peak in April (index 133) and drop in July (86). 14 firms with five or more permits filed none in the last 12 months of our data; check that a firm is still working in Bend before you sign. Bend records no job value on trade permits, so we cannot price electrical work here; see electrical work cost.
See every Bend electrician by permits finaled →
Related
Rules elsewhere: do I need a permit for electrical work, for a panel upgrade and for an EV charger. Rates: how much electricians charge per hour. In Bend: plumbing permit, building permit search, permit statistics.
What this does not tell you
The City's electrical sheet is undated; the Building Safety Division ((541) 388-5528) has the current list. State minor-label jobs are not City permits and do not appear in our file, so a contractor doing mostly small jobs on labels looks quieter here than they are. Trade permits inside a builder's new-home application finish when the house does and are left out of the finished share.
How we know this
Permit rules are quoted from the City of Bend's "When Is an Electrical Permit Required?" sheet and Mechanical Permit Electrical Statement, fees from Resolution No. 3482 (FY 2026-27, effective 1 July 2026), and the owner exemption from ORS 479.540, read 23 October 2026. Counts are City of Bend electrical permits on homes, October 2023 to September 2026; "finaled" uses permits a year or more old, and days are issue to final. License status is a name match against the Oregon CCB active-license file.
Numbers come from City of Bend building, electrical, mechanical and plumbing permits on homes, data through October 16, 2026. Nobody paid to be on this page and nobody can.
Questions
- Do I need a permit to replace an outlet or light fixture in Bend?
Not if you are the homeowner doing it yourself. The City's 'When Is an Electrical Permit Required?' sheet lists like-for-like replacement of fixtures, receptacles and switches as homeowner-only work; a contractor doing the same job needs a permit or a state minor label.
- How much is an electrical permit in Bend, Oregon?
Under the FY 2026-27 fee schedule, branch circuits without a service are $175.24 for the first circuit and $18.34 for each additional one per panel, a service of 200 amps or less is $254.70, and 201 to 400 amps is $309.71. A 12% State of Oregon surcharge is added.
- Can a homeowner do their own electrical work in Bend?
Yes, on a home you own that is not for sale, rent, lease or exchange (ORS 479.540). If the house is for rent or sale, the exemption covers maintenance only, and the City sheet says only an electrical contractor may do installations.
- How long does an electrical permit take to close in Bend?
The usual Bend electrical permit in our file was finaled 31 days after issue, and 88.1% of permits a year or more old were finaled.
- Does a water heater need an electrical permit in Bend?
The City's electrical sheet exempts replacing certain appliances of 30 amps or less, but adds that water heaters still require a plumbing permit.
Build your own list
Every firm with that kind of permit on record. Pick what you value. The list moves.
Related guides
- Do I need an electrical permit in Anaheim? Panel upgrades, the utility meter spot, fees and inspections
- Do I need an electrical permit in Arlington, VA? What's exempt, who pulls it, how long it takes
- Austin building permit search: how to look up permits on an address
- Do I need an electrical permit in Austin? The exempt list, the homestead permit, fees and inspections
- Do I need an electrical permit in Boulder? The state license plus City registration rule, the 2026 NEC and the fee table
- Do I need an electrical permit in Cambridge, MA? Who can pull it, the per-item fees, and timing
For one city
- When Is an Electrical Permit Required? — City of Bend Building Safety Division (accessed 2026-10-23)
- Resolution No. 3482, Fiscal Year 2026-27 Fee Schedule (effective 1 July 2026) — City of Bend (accessed 2026-10-23)
- ORS Chapter 479 (ORS 479.540) — Oregon Legislature (accessed 2026-10-23)
- Mechanical Permit Electrical Statement (rev. 03/25/2020) — City of Bend Building Safety (accessed 2026-10-23)
- Mechanical with Electrical Minor Label (effective 06/28/2022) — City of Bend Building Safety (accessed 2026-10-23)
- Water Heater Permitting Guide — City of Bend (accessed 2026-10-23)
- Online Permit Center Portal Help — City of Bend (2026-10-23)
- Online Permit Center — City of Bend (2026-10-23)
- License search (Plumbing, Electrical, MDI) — Oregon Building Codes Division (2026-10-22)
- Oregon CCB License Search (2026-10-22)